5 resultados para Operating room technicians.
em Instituto Politécnico do Porto, Portugal
Resumo:
Designing electric installation projects, demands not only academic knowledge, but also other types of knowledge not easily acquired through traditional instructional methodologies. A lot of additional empirical knowledge is missing and so the academic instruction must be completed with different kinds of knowledge, such as real-life practical examples and simulations. On the other hand, the practical knowledge detained by the most experienced designers is not formalized in such a way that is easily transmitted. In order to overcome these difficulties present in the engineers formation, we are developing an Intelligent Tutoring System (ITS), for training and support concerning the development of electrical installation projects to be used by electrical engineers, technicians and students.
Resumo:
Power system organization has gone through huge changes in the recent years. Significant increase in distributed generation (DG) and operation in the scope of liberalized markets are two relevant driving forces for these changes. More recently, the smart grid (SG) concept gained increased importance, and is being seen as a paradigm able to support power system requirements for the future. This paper proposes a computational architecture to support day-ahead Virtual Power Player (VPP) bid formation in the smart grid context. This architecture includes a forecasting module, a resource optimization and Locational Marginal Price (LMP) computation module, and a bid formation module. Due to the involved problems characteristics, the implementation of this architecture requires the use of Artificial Intelligence (AI) techniques. Artificial Neural Networks (ANN) are used for resource and load forecasting and Evolutionary Particle Swarm Optimization (EPSO) is used for energy resource scheduling. The paper presents a case study that considers a 33 bus distribution network that includes 67 distributed generators, 32 loads and 9 storage units.
Resumo:
O desenvolvimento deste trabalho teve como objectivo a optimização de um sistema de climatização industrial, constituído por quatro centrais de climatização adiabáticas, que apresentam limitações de capacidade de arrefecimento, controlo e eficiência. Inicialmente foi necessária a pesquisa bibliográfica e recolha de informação relativa à indústria têxtil e ao processo de arrefecimento evaporativo. Numa fase posterior foram recolhidos e analisados os diversos dados essenciais à compreensão do binómio edifício/sistema de climatização, para a obtenção de possíveis hipóteses de optimização. Da fase de recolha de informações e dados, destaca-se, também, a realização de análises à qualidade do ar interior (QAI). As optimizações seleccionadas como passíveis de implementação, foram estudadas e analisadas com o auxílio do software de simulação energética dinâmica DesignBuilder e os resultados obtidos foram devidamente trabalhados e ajustados de modo a permitir uma assimilação amigável e de fácil interpretação das suas vantagens e desvantagens, tendo ainda sido objecto de estudo de viabilidade económica. A optimização proposta reflecte uma melhoria substancial das condições interiores ao nível da temperatura e humidade relativa, resultando, ainda assim, numa redução de consumos energéticos na ordem dos 23 % (490.337 kWh), isto é, uma poupança anual de 42.169 € aos custos de exploração e com um período de retorno de 1 ano e 11 meses.
Resumo:
The IEEE 802.15.4 is the most widespread used protocol for Wireless Sensor Networks (WSNs) and it is being used as a baseline for several higher layer protocols such as ZigBee, 6LoWPAN or WirelessHART. Its MAC (Medium Access Control) supports both contention-free (CFP, based on the reservation of guaranteed time-slots GTS) and contention based (CAP, ruled by CSMA/CA) access, when operating in beacon-enabled mode. Thus, it enables the differentiation between real-time and best-effort traffic. However, some WSN applications and higher layer protocols may strongly benefit from the possibility of supporting more traffic classes. This happens, for instance, for dense WSNs used in time-sensitive industrial applications. In this context, we propose to differentiate traffic classes within the CAP, enabling lower transmission delays and higher success probability to timecritical messages, such as for event detection, GTS reservation and network management. Building upon a previously proposed methodology (TRADIF), in this paper we outline its implementation and experimental validation over a real-time operating system. Importantly, TRADIF is fully backward compatible with the IEEE 802.15.4 standard, enabling to create different traffic classes just by tuning some MAC parameters.
Resumo:
Os requisitos legais impostos ao processo de manutenção das instalações de AVAC em edifícios evoluíram nos últimos 10 anos no sentido de uma crescente exigência, obrigando à existência de planos de manutenção preventiva, livros de ocorrências, inspeções obrigatórias a equipamentos, auditorias ou certi cações energéticas. Para os responsáveis da gestão da manutenção de edifícios, em particular para os que gerem uma quantidade signi cativa de equipamentos e instalações, fazê-lo sem o auxílio de uma ferramenta informática é um desa o considerável. Este trabalho visou a arquitetura de um sistema de gestão da manutenção de edifícios que foi aplicado a um caso real, nomeadamente o campus de Azurém da Universidade do Minho. Foi desenvolvida uma metodologia de inspeção, recolha e tratamento da informação para os sistemas técnicos de AVAC existentes nos edifícios. Esta metodologia foi implementada numa aplicação informática que permite aos técnicos responsáveis pela manutenção uma agilização de tarefas, resultado de um vasto conjunto de informações e de ferramentas desenvolvidas propositadamente, facilmente acessíveis através da rede Wi-Fi universitária. A integração das tarefas de manutenção na aplicação informática permitirá aumentar o grau de e ciência e e cácia nas atividades inerentes à manutenção, aumentando o grau de satisfação dos técnicos envolvidos no processo e dos utentes dos edifícios. O registo das tarefas de manutenção realizadas e dos respetivos custos em bases de dados, tornará também possível a geração de relatórios que sustentarão decisões mais assertivas. A implementação na aplicação informática dos seis módulos estruturais do Sistema de Gestão da Manutenção e Consumos Energéticos, SGMCE, permitirá atingir um nível de gestão da manutenção mais elevado, criando condições para o efetuar o comissionamento. O comissionamento prolonga-se por toda a vida do edifício, permitindo atingir os objetivos designados pelo seu promotor, dentro de patamares de custos de exploração energéticos e de custos optimizados de manutenção.