203 resultados para Completion time

em Instituto Politécnico do Porto, Portugal


Relevância:

60.00% 60.00%

Publicador:

Resumo:

A construction project is a group of discernible tasks or activities that are conduct-ed in a coordinated effort to accomplish one or more objectives. Construction projects re-quire varying levels of cost, time and other resources. To plan and schedule a construction project, activities must be defined sufficiently. The level of detail determines the number of activities contained within the project plan and schedule. So, finding feasible schedules which efficiently use scarce resources is a challenging task within project management. In this context, the well-known Resource Constrained Project Scheduling Problem (RCPSP) has been studied during the last decades. In the RCPSP the activities of a project have to be scheduled such that the makespan of the project is minimized. So, the technological precedence constraints have to be observed as well as limitations of the renewable resources required to accomplish the activities. Once started, an activity may not be interrupted. This problem has been extended to a more realistic model, the multi-mode resource con-strained project scheduling problem (MRCPSP), where each activity can be performed in one out of several modes. Each mode of an activity represents an alternative way of combining different levels of resource requirements with a related duration. Each renewable resource has a limited availability for the entire project such as manpower and machines. This paper presents a hybrid genetic algorithm for the multi-mode resource-constrained pro-ject scheduling problem, in which multiple execution modes are available for each of the ac-tivities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme. It is evaluated the quality of the schedules and presents detailed comparative computational re-sults for the MRCPSP, which reveal that this approach is a competitive algorithm.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents a genetic algorithm-based approach for project scheduling with multi-modes and renewable resources. In this problem activities of the project may be executed in more than one operating mode and renewable resource constraints are imposed. The objective function is the minimization of the project completion time. The idea of this approach is integrating a genetic algorithm with a schedule generation scheme. This study also proposes applying a local search procedure trying to yield a better solution when the genetic algorithm and the schedule generation scheme obtain a solution. The experimental results show that this algorithm is an effective method for solving this problem.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents a genetic algorithm for the multimode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme by introducing an improvement procedure. It is evaluated the quality of the schedule and present detailed comparative computational results for the MRCPSP, which reveal that this approach is a competitive algorithm.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

O problema do escalonamento, por ser um dos factores fundamentais na tomada de decisão para uma boa gestão das operações, tem sido alvo de um amplo estudo, tanto na sua componente teórica como na sua componente prática. A importância de um escalonamento correto das operações é preponderante, quando as pequenas diferenças, em termos de tempos de produção, podem ter um grande impacto na competitividade da organização. Em muitas unidades produtivas, existem máquinas capazes de realizar as mesmas operações com diferentes desempenhos. Isto pode dever-se à necessidade de flexibilizar os recursos ou mesmo a uma atualização da capacidade produtiva. Embora os problemas de máquinas diferentes em paralelo tenham sido alvo de um vasto estudo, muitos deles não são passíveis de ser resolvidos através de métodos exatos. O problema de minimização do makespan (Rm||Cmax), é NP-hard, sendo habitualmente abordado através de heurísticas. Entre as heurísticas utilizadas em problemas de minimização do makespan em máquinas diferentes em paralelo, é possível identificar duas filosofias de afectação: a que utiliza os tempos de processamento para alocar as tarefas e a que utiliza as datas de conclusão. Nesta dissertação, pretende-se dar uma contribuição para a resolução do problema de afectação de recursos em sistemas de produção. Para tal, foram propostas as heurísticas OMTC 3 e Suffrage One. A contribuição consiste na proposta de versões híbridas e modificadas das heurística MCT e Suffrage, uma vez identificadas várias características que podem limitar o seu desempenho, como o facto da heurística MCT alocar as tarefas numa ordem aleatória ou a heurística Suffrage alocar mais que uma tarefa por iteração. Finalmente, procedeu-se à realização de testes computacionais, para avaliar o desempenho das heurísticas propostas. Os testes realizados permitiram concluir que a heurística OMTC 3 apresentou um melhor desempenho que a heurística MCT.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Esta dissertação apresenta um estudo sobre os problemas de sequenciamento de tarefas de produção do tipo job shop scheduling. Os problemas de sequenciamento de tarefas de produção pretendem encontrar a melhor sequência para o processamento de uma lista de tarefas, o instante de início e término de cada tarefa e a afetação de máquinas para as tarefas. Entre estes, encontram-se os problemas com máquinas paralelas, os problemas job shop e flow shop. As medidas de desempenho mais comuns são o makespan (instante de término da execução de todas as tarefas), o tempo de fluxo total, a soma dos atrasos (tardiness), o atraso máximo, o número de tarefas que são completadas após a data limite, entre outros. Num problema do tipo job shop, as tarefas (jobs) consistem num conjunto de operações que têm de ser executadas numa máquina pré-determinada, obedecendo a um determinado sequenciamento com tempos pré-definidos. Estes ambientes permitem diferentes cenários de sequenciamento das tarefas. Normalmente, não são permitidas interrupções no processamento das tarefas (preemption) e pode ainda ser necessário considerar tempos de preparação dependentes da sequência (sequence dependent setup times) ou atribuir pesos (prioridades) diferentes em função da importância da tarefa ou do cliente. Pretende-se o estudo dos modelos matemáticos existentes para várias variantes dos problemas de sequenciamento de tarefas do tipo job shop e a comparação dos resultados das diversas medidas de desempenho da produção. Este trabalho contribui para demonstrar a importância que um bom sequenciamento da produção pode ter na sua eficiência e consequente impacto financeiro.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Mestre em Contabilidade e Finanças Orientador: Mestre Paulino Manuel Leite da Silva

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The introduction of wind power generation in several countries around the world, including in European countries, where energy policy directives have encouraged the use of renewables, led to several changes in market and power systems operation. The intensive integration of these sources has led to situations in which the demand is lower than the available renewable resources. In these situations a part of the available generation is wasted if not used for storage or to supply additional demand. This paper proposes a real time demand response methodology based on changing the electricity price for the consumers expecting an increase in the demand in the periods in which that demand is lower than the available renewable generation. The consumers response to the changes in electricity price is characterized by their price elasticity of demand considered distinct for each consumer type. The proposed methodology is applied to the Portuguese power system, in the context of the Iberian electricity market (MIBEL). The renewable-based producers are considered as special producers, with special tariffs, and so it is important to use the energy available as it will be paid anyway. In this context, consumers are entities actively participating in the operation of the market.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of distributed energy resources, based on natural intermittent power sources, like wind generation, in power systems imposes the development of new adequate operation management and control methodologies. A short-term Energy Resource Management (ERM) methodology performed in two phases is proposed in this paper. The first one addresses the day-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. The ERM scheduling is a complex optimization problem due to the high quantity of variables and constraints. In this paper the main goal is to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixedinteger non-linear programming approach. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units and 1000 electric vehicles has been implemented in a simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes an energy resources management methodology based on three distinct time horizons: day-ahead scheduling, hour-ahead scheduling, and real-time scheduling. In each scheduling process it is necessary the update of generation and consumption operation and of the storage and electric vehicles storage status. Besides the new operation condition, it is important more accurate forecast values of wind generation and of consumption using results of in short-term and very short-term methods. A case study considering a distribution network with intensive use of distributed generation and electric vehicles is presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The increasing importance given by environmental policies to the dissemination and use of wind power has led to its fast and large integration in power systems. In most cases, this integration has been done in an intensive way, causing several impacts and challenges in current and future power systems operation and planning. One of these challenges is dealing with the system conditions in which the available wind power is higher than the system demand. This is one of the possible applications of demand response, which is a very promising resource in the context of competitive environments that integrates even more amounts of distributed energy resources, as well as new players. The methodology proposed aims the maximization of the social welfare in a smart grid operated by a virtual power player that manages the available energy resources. When facing excessive wind power generation availability, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. The proposed method is especially useful when actual and day-ahead wind forecast differ significantly. The proposed method has been computationally implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20310 consumers and 548 distributed generators, some of them with must take contracts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent changes in power systems mainly due to the substantial increase of distributed generation and to the operation in competitive environments has created new challenges to operation and planning. In this context, Virtual Power Players (VPP) can aggregate a diversity of players, namely generators and consumers, and a diversity of energy resources, including electricity generation based on several technologies, storage and demand response. Demand response market implementation has been done in recent years. Several implementation models have been considered. An important characteristic of a demand response program is the trigger criterion. A program for which the event trigger depends on the Locational Marginal Price (LMP) used by the New England Independent System operator (ISO-NE) inspired the present paper. This paper proposes a methodology to support VPP demand response programs management. The proposed method has been computationally implemented and its application is illustrated using a 32 bus network with intensive use of distributed generation. Results concerning the evaluation of the impact of using demand response events are also presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In competitive electricity markets with deep concerns for the efficiency level, demand response programs gain considerable significance. As demand response levels have decreased after the introduction of competition in the power industry, new approaches are required to take full advantage of demand response opportunities. This paper presents DemSi, a demand response simulator that allows studying demand response actions and schemes in distribution networks. It undertakes the technical validation of the solution using realistic network simulation based on PSCAD. The use of DemSi by a retailer in a situation of energy shortage, is presented. Load reduction is obtained using a consumer based price elasticity approach supported by real time pricing. Non-linear programming is used to maximize the retailer’s profit, determining the optimal solution for each envisaged load reduction. The solution determines the price variations considering two different approaches, price variations determined for each individual consumer or for each consumer type, allowing to prove that the approach used does not significantly influence the retailer’s profit. The paper presents a case study in a 33 bus distribution network with 5 distinct consumer types. The obtained results and conclusions show the adequacy of the used methodology and its importance for supporting retailers’ decision making.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Com o objectivo de avaliar a satisfação e importância atribuída pelos utentes aos serviços prestados no Serviço de Colheitas, realizou-se um estudo observacional descritivo transversal. A amostra foi constituída pelos 107 utentes deste Serviço do Hospital de São João, que aceitaram voluntariamente participar no estudo através do preenchimento do QSUSC. Da análise conjugada das variáveis satisfação e importância concluiu-se que o tempo de espera para a colheita de sangue é uma área que requer acções de melhoria de grande prioridade. Na análise bivariada entre a satisfação e variáveis independentes os resultados apontam que existe associação apenas com o estado civil.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Group decision making plays an important role in organizations, especially in the present-day economy that demands high-quality, yet quick decisions. Group decision-support systems (GDSSs) are interactive computer-based environments that support concerted, coordinated team efforts toward the completion of joint tasks. The need for collaborative work in organizations has led to the development of a set of general collaborative computer-supported technologies and specific GDSSs that support distributed groups (in time and space) in various domains. However, each person is unique and has different reactions to various arguments. Many times a disagreement arises because of the way we began arguing, not because of the content itself. Nevertheless, emotion, mood, and personality factors have not yet been addressed in GDSSs, despite how strongly they influence results. Our group’s previous work considered the roles that emotion and mood play in decision making. In this article, we reformulate these factors and include personality as well. Thus, this work incorporates personality, emotion, and mood in the negotiation process of an argumentbased group decision-making process. Our main goal in this work is to improve the negotiation process through argumentation using the affective characteristics of the involved participants. Each participant agent represents a group decision member. This representation lets us simulate people with different personalities. The discussion process between group members (agents) is made through the exchange of persuasive arguments. Although our multiagent architecture model4 includes two types of agents—the facilitator and the participant— this article focuses on the emotional, personality, and argumentation components of the participant agent.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The short article attempts to make some very brief reflections on the effects a lack of public policies positively discriminatory in terms of public employment retirement. In particular, the observation of the absurd contradiction between the average age of retirement at the time of death (for men and women) and the average pension time for men and women in public employment in Portugal.