27 resultados para Communication politique
em Instituto Politécnico do Porto, Portugal
Resumo:
18th SPACE Annual Conference and EURASHE-SEPHE Seminar 21-24 March 2007 Thursday 22 March 2007
Resumo:
Electrical activity is extremely broad and distinct, requiring by one hand, a deep knowledge on rules, regulations, materials, equipments, technical solutions and technologies and assistance in several areas, as electrical equipment, telecommunications, security and efficiency and rational use of energy, on the other hand, also requires other skills, depending on the specific projects to be implemented, being this knowledge a characteristic that belongs to the professionals with relevant experience, in terms of complexity and specific projects that were made.
Resumo:
In this chapter we outline the fundamentals of communication and negotiation in a group of people. Being aware of these generic principals greatly contributes to improve the effectiveness and the outcome of the meetings that MUTW students will be engaged in.
Resumo:
The main objective of this paper is to evaluate the key elements in the construction of cosistent organisational messages over time. In order to accomplish that, we propose the aligment of several elements: vision, misson, objectives, cultural values, optimal identity attributes, positioning, type of messages, communication style and means, and image...
Resumo:
A vital role is being played by SCADA Communication for Supervisory Control and Data acquisition (SCADA) Monitoring Ststems. Devices that are designed to operate in safety-critical environments are usually designed to failsafe, but security vulnerabilities could be exploited by an attacker to disable the fail-safe mechanisms. Thus these devices must not onlybe designed for safety but also for security. This paper presents a study of the comparison of different Encryption schemes for securing SCADA Component Communication. The encryption schemes such as Symetric Key Encrypton in Wireless SCADA Environment, Assymmetric-key Encryption to Internet SCADA, and the Cross Crypto Scheme Cipher to secure communication for SCADA are analysed and the outcome is evaluated.
Resumo:
Critical Infrastructures became more vulnerable to attacks from adversaries as SCADA systems become connected to the Internet. The open standards for SCADA Communications make it very easy for attackers to gain in-depth knowledge about the working and operations of SCADA networks. A number of Intenrnet SCADA security issues were raised that have compromised the authenticity, confidentiality, integrity and non-repudiation of information transfer between SCADA Components. This paper presents an integration of the Cross Crypto Scheme Cipher to secure communications for SCADA components. The proposed scheme integrates both the best features of symmetric and asymmetric encryptiontechniques. It also utilizes the MD5 hashing algorithm to ensure the integrity of information being transmitted.
Resumo:
The overall goal of the REMPLI project is to design and implement a communication infrastructure for distributed data acquisition and remote control operations using the power grid as the communication medium. The primary target application is remote meter reading with high time resolution, where the meters can be energy, heat, gas, or water meters. The users of the system (e.g. utility companies) will benefit from the REMPLI system by gaining more detailed information about how energy is consumed by the end-users. In this context, the power-line communication (PLC) is deployed to cover the distance between utility company’s Private Network and the end user. This document specifies a protocol for real-time PLC, in the framework of the REMPLI project. It mainly comprises the Network Layer and Data Link Layer. The protocol was designed having into consideration the specific aspects of the network: different network typologies (star, tree, ring, multiple paths), dynamic changes in network topology (due to network maintenance, hazards, etc.), communication lines strongly affected by noise.
Resumo:
Although power-line communication (PLC) is not a new technology, its use to support communication with timing requirements is still the focus of ongoing research. Recently, a new infrastructure was presented, intended for communication using power lines from a central location to geographically dispersed nodes using inexpensive devices. This new infrastructure uses a two-level hierarchical power-line system, together with an IP-based network. Within this infrastructure, in order to provide end-toend communication through the two levels of the powerline system, it is necessary to fully understand the behaviour of the underlying network layers. The masterslave behaviour of the PLC MAC, together with the inherent dynamic topology of power-line networks are important issues that must be fully characterised. Therefore, in this paper we present a simulation model which is being used to study and characterise the behaviour of power-line communication.
Resumo:
Modern factories are complex systems where advances in networking and information technologies are opening new ways towards higher efficiency. Such move is being driven by market rules with ever-increasing competition levels, in search for faster time-to-market, improved process yield, non-stop operations, flexible manufacturing and tighter supply-chain coupling. All these aims present a common requirement, i.e. a realtime flow of information, from the plant-floor up to the management, maintenance, suppliers and clients, to support accurate monitoring and control of the factory. This stresses the importance achieved by the communication infrastructure in modern manufacturing industry. This paper presents the authors view concerning the current trends in modern factory communication systems. It addresses the problems of seamlessly integrating different information flows with diverse requirements, mainly in terms of timeliness. In this aspect, the debate between event-triggered and time-triggered communication is revisited as well as the joint support for both types of traffic. Finally, a view of where factory communication systems are moving to is also presented, showing the impact of open and widely available technologies.
CIDER - envisaging a COTS communication infrastructure for evolutionary dependable real-time systems
Resumo:
It is foreseen that future dependable real-time systems will also have to meet flexibility, adaptability and reconfigurability requirements. Considering the distributed nature of these computing systems, a communication infrastructure that permits to fulfil all those requirements is thus of major importance. Although Ethernet has been used primarily as an information network, there is a strong belief that some very recent technological advances will enable its use in dependable applications with real-time requirements. Indeed, several recently standardised mechanisms associated with Switched-Ethernet seem to be promising to enable communication infrastructures to support hard real-time, reliability and flexible distributed applications. This paper describes the motivation and the work being developed within the CIDER (Communication Infrastructure for Dependable Evolvable Real-Time Systems) project, which envisages the use of COTS Ethernet as an enabling technology for future dependable real-time systems. It is foreseen that the CIDER approach will constitute a relevant stream of research since it will bring together cutting edge research in the field of real-time and dependable distributed systems and the industrial eagerness to expand Ethernet responsabilities to support dependable real-time applications.
Resumo:
Fieldbus networks aim at the interconnection of field devices such as sensors, actuators and small controllers. Therefore, they are an effective technology upon which Distributed Computer Controlled Systems (DCCS) can be built. DCCS impose strict timeliness requirements to the communication network. In essence, by timeliness requirements we mean that traffic must be sent and received within a bounded interval, otherwise a timing fault is said to occur. P-NET is a multi-master fieldbus standard based on a virtual token passing scheme. In P-NET each master is allowed to transmit only one message per token visit, which means that in the worst-case the communication response time could be derived considering that the token is fully utilised by all stations. However, such analysis can be proved to be quite pessimistic. In this paper we propose a more sophisticated P-NET timing analysis model, which considers the actual token utilisation by different masters. The major contribution of this model is to provide a less pessimistic, and thus more accurate, analysis for the evaluation of the worst-case communication response time in P-NET fieldbus networks.
Resumo:
Although power-line communication (PLC) is not a new technology, its use to support data communication with timing requirements is still the focus of ongoing research. A new infrastructure intended for communication using power lines from a central location to dispersed nodes using inexpensive devices was presented recently. This new infrastructure uses a two-level hierarchical power-line system, together with an IP-based network. Due to the master-slave behaviour of the PLC medium access, together with the inherent dynamic topology of power-line networks, a mechanism to provide end-to-end communication through the two levels of the power-line system must be provided. In this paper we introduce the architecture of the PLC protocol layer that is being implemented for this end.
Resumo:
This paper describes the communication stack of the REMPLI system: a structure using power-lines and IPbased networks for communication, for data acquisition and control of energy distribution and consumption. It is furthermore prepared to use alternative communication media like GSM or analog modem connections. The REMPLI system provides communication service for existing applications, namely automated meter reading, energy billing and domotic applications. The communication stack, consisting of physical, network, transport, and application layer is described as well as the communication services provided by the system. We show how the peculiarities of the power-line communication influence the design of the communication stack, by introducing requirements to efficiently use the limited bandwidth, optimize traffic and implement fair use of the communication medium for the extensive communication partners.
Resumo:
Controller area network (CAN) is a fieldbus network suitable for small-scale distributed computer controlled systems (DCCS), being appropriate for sending and receiving short real-time messages at speeds up to 1 Mbit/sec. Several studies are available on how to guarantee the real-time requirements of CAN messages, providing preruntime schedulability conditions to guarantee the real-time communication requirements of DCCS traffic. Usually, it is considered that CAN guarantees atomic multicast properties by means of its extensive error detection/signaling mechanisms. However, there are some error situations where messages can be delivered in duplicate or delivered only by a subset of the receivers, leading to inconsistencies in the supported applications. In order to prevent such inconsistencies, a middleware for reliable communication in CAN is proposed, taking advantage of CAN synchronous properties to minimize the runtime overhead. Such middleware comprises a set of atomic multicast and consolidation protocols, upon which the reliable communication properties are guaranteed. The related timing analysis demonstrates that, in spite of the extra stack of protocols, the real-time properties of CAN are preserved since the predictability of message transfer is guaranteed.