103 resultados para Power supply circuits
Resumo:
Different problems are daily discuss on environmental aspects such acid rain, eutrophication, global warming and an others problems. Rarely do we find some discussions about phosphorus problematic. Through the years the phosphorus as been a real problem and must be more discussed. On this thesis was done a global material flow analysis of phosphorus, based on data from the year 2004, the production of phosphate rock in that year was 18.9 million tones, almost this amount it was used as fertilizer on the soil and the plants only can uptake, on average, 20% of the input of fertilizer to grow up, the remainder is lost for the phosphorus soil. In the phosphorus soil there is equilibrium between the phosphorus available to uptake from the plants and the phosphorus associate with other compounds, this equilibrium depends of the kind of soil and is related with the soil pH. A reserve inventory was done and we have 15,000 million tones as reserve, the amount that is economical available. The reserve base is estimated in 47,000 million tones. The major reserves can be found in Morocco and Western Sahara, United Sates, China and South Africa. The reserve estimated in 2009 was 15,000 million tone of phosphate rock or 1,963 million tone of P. If every year the mined phosphate rock is around 22 Mt/yr (phosphorus production on 2008 USGS 2009), and each year the consumption of phosphorus increases because of the food demand, the reserves of phosphate rock will be finished in about 90 years, or maybe even less. About the value/impact assessment was done a qualitative analysis, if on the future we don’t have more phosphate rock to produce fertilizers, it is expected a drop on the crops yields, each depends of the kind of the soil and the impact on the humans feed and animal production will not be a relevant problem. We can recovery phosphorus from different waste streams such as ploughing crop residues back into the soil, Food processing plants and food retailers, Human and animal excreta, Meat and bone meal, Manure fibre, Sewage sludge and wastewater. Some of these examples are developed in the paper.
Resumo:
A verificação das Características Garantidas associadas aos equipamentos, em especial dos aerogeradores, incluídos no fornecimento de Parques Eólicos, reveste-se de particular importância devido, principalmente, ao grande volume de investimento em jogo, ao longo período necessário ao retorno do mesmo, à incerteza quanto à manutenção futura das actuais condições de remuneração da energia eléctrica produzida e ainda à falta de dados históricos sobre o período de vida útil esperado para os aerogeradores. Em face do exposto, é usual serem exigidas aos fornecedores, garantias do bom desempenho dos equipamentos, associadas a eventuais penalidades, quer para o período de garantia, quer para o restante período de vida útil, de modo a minimizar o risco associado ao investimento. No fornecimento de Parques Eólicos existem usualmente três tipos de garantias, nomeadamente, garantia de Curva de Potência dos aerogeradores, garantia de Disponibilidade dos equipamentos ou garantia de Produção de Energia. Estas poderão existir isoladamente ou em combinação, dependendo das condições contratuais acordadas entre o Adjudicatário e o Fornecedor. O grau de complexidade e/ou trabalho na implementação das mesmas é variável, não sendo possível afirmar qual delas é a mais conveniente para o Adjudicatário, nem qual a mais exacta em termos de resultados. Estas dúvidas surgem em consequência das dificuldades inerentes à recolha dos próprios dados e também da relativamente ampla margem de rearranjo dos resultados permitido pelas normas existentes, possibilitando a introdução de certo tipo de manipulações nos dados (rejeições e correlações), as quais podem afectar de forma considerável as incertezas dos resultados finais dos ensaios. Este trabalho, consistiu no desenvolvimento, execução, ensaio e implementação de uma ferramenta informática capaz de detectar de uma forma simples e expedita eventuais desvios à capacidade de produção esperada para os aerogeradores, em função do recurso verificado num dado período. Pretende ser uma ferramenta manuseável por qualquer operador de supervisão, com utilização para efeitos de reparações e correcção de defeitos, não constituindo contudo uma alternativa a outros processos abrangidos por normas, no caso de aplicação de penalidades. Para o seu funcionamento, são utilizados os dados mensais recolhidos pela torre meteorológica permanente instalada no parque e os dados de funcionamento dos aerogeradores, recolhidos pelo sistema SCADA. Estes são recolhidos remotamente sob a forma de tabelas e colocados numa directoria própria, na qual serão posteriormente lidos pela ferramenta.
Resumo:
This thesis presents the Fuzzy Monte Carlo Model for Transmission Power Systems Reliability based studies (FMC-TRel) methodology, which is based on statistical failure and repair data of the transmission power system components and uses fuzzyprobabilistic modeling for system component outage parameters. Using statistical records allows developing the fuzzy membership functions of system component outage parameters. The proposed hybrid method of fuzzy set and Monte Carlo simulation based on the fuzzy-probabilistic models allows catching both randomness and fuzziness of component outage parameters. A network contingency analysis to identify any overloading or voltage violation in the network is performed once obtained the system states. This is followed by a remedial action algorithm, based on Optimal Power Flow, to reschedule generations and alleviate constraint violations and, at the same time, to avoid any load curtailment, if possible, or, otherwise, to minimize the total load curtailment, for the states identified by the contingency analysis. For the system states that cause load curtailment, an optimization approach is applied to reduce the probability of occurrence of these states while minimizing the costs to achieve that reduction. This methodology is of most importance for supporting the transmission system operator decision making, namely in the identification of critical components and in the planning of future investments in the transmission power system. A case study based on Reliability Test System (RTS) 1996 IEEE 24 Bus is presented to illustrate with detail the application of the proposed methodology.
Resumo:
A aquacultura desempenha, actualmente, um papel fundamental no abastecimento de proteína animal de elevada qualidade. Nesta dissertação foi elaborado um projecto de uma unidade de piscicultura semi-intensiva de enguia, robalo, dourada e linguado e em regime extensivo a ostra. A unidade está localizada na Ria de Aveiro, na propriedade Ilha do Poço, com uma área total de 54,3 hectares. A execução de um projecto de aquacultura é um trabalho multidisciplinar que necessita a mobilização de diferentes recursos e conhecimentos. Os projectos de aquicultura estão directamente relacionados com o local de instalação da unidade e podem ser negativamente afectados pela poluição, por factores económicos locais ou por factores sociais que coloquem em risco o sucesso desta actividade económica. O principal objectivo desta dissertação foi o estudo de crescimento das espécies, taxa de alimentação, qualidade da água à entrada e saída da aquicultura, o consumo de oxigénio pelas espécies e o oxigénio necessário para oxidar a amónia em nitrato, o estudo de arejamento pelo vento, a necessidade de arejamento mecânico nos tanques de engorda e por fim a análise de investimento do projecto. Os valores obtidos para o tempo de crescimento das espécies até atingir o peso comercial foram, para a enguia 2,25anos, para a dourada 1,5 anos, para o robalo 2 anos, para o linguado 2,25 anos e para a ostra 1ano. Os índices de conversão alimentar (ICA) obtidos para as espécies foram os seguintes: 1 para a enguia, 1,24 para o robalo, 1,2 para a dourada e 1,58 para o linguado. Relativamente à concentração de amónia nos tanques de engorda, a espécie robalo apresenta o maior valor (0,3mg/L) por tanque. O arejamento natural dos tanques apenas é conseguido se o vento tiver uma velocidade de 20m/s. Por essa razão, e para garantir o arejamento requerido, serão necessários pelo menos 46 arejadores mecânicos com potência de 6kW a funcionar 24/24 horas. Para a taxa ponderada obteve-se um valor de 11,80%. O valor obtido para o VAL foi de 2.036.862 € e para a TIR, de 27,95%. O tempo necessário para que o investidor efectue o reembolso do capital investido no projecto é de 5,5 anos. O índice de rentabilidade tem um valor de 1,83 o que significa que o projecto é rentável.
Resumo:
Infiltration galleries are among the oldest known means used for small public water fountains. Owing to its ancestral origin they are usually associated with high quality water. Thirty-one compounds, including pesticides and estrogens from different chemical families, were analysed in waters from infiltration galleries collected in Alto Douro Demarcated Wine region (North of Portugal). A total of twelve compounds were detected in the water samples. Nine of these compounds are described as presenting evidence or potential evidence of interfering with the hormone system of humans and wildlife. Although concentrations of the target analytes were relatively low, many of them below their limit of quantification, four compounds were above quantification limit and two of them even above the legal limit of 0.1 lg/L: dimethoate (30.38 ng/L), folpet (64.35 ng/L), terbuthylazine-desethyl (22.28 to 292.36 ng/L) and terbuthylazine (22.49 to 369.33 ng/L).
Resumo:
In this paper, we characterize two power indices introduced in [1] using two different modifications of the monotonicity property first stated by [2]. The sets of properties are easily comparable among them and with previous characterizations of other power indices.
Resumo:
Catastrophic events, such as wars and terrorist attacks, tornadoes and hurricanes, earthquakes, tsunamis, floods and landslides, are always accompanied by a large number of casualties. The size distribution of these casualties has separately been shown to follow approximate power law (PL) distributions. In this paper, we analyze the statistical distributions of the number of victims of catastrophic phenomena, in particular, terrorism, and find double PL behavior. This means that the data sets are better approximated by two PLs instead of a single one. We plot the PL parameters, corresponding to several events, and observe an interesting pattern in the charts, where the lines that connect each pair of points defining the double PLs are almost parallel to each other. A complementary data analysis is performed by means of the computation of the entropy. The results reveal relationships hidden in the data that may trigger a future comprehensive explanation of this type of phenomena.
Resumo:
This paper presents a complete, quadratic programming formulation of the standard thermal unit commitment problem in power generation planning, together with a novel iterative optimisation algorithm for its solution. The algorithm, based on a mixed-integer formulation of the problem, considers piecewise linear approximations of the quadratic fuel cost function that are dynamically updated in an iterative way, converging to the optimum; this avoids the requirement of resorting to quadratic programming, making the solution process much quicker. From extensive computational tests on a broad set of benchmark instances of this problem, the algorithm was found to be flexible and capable of easily incorporating different problem constraints. Indeed, it is able to tackle ramp constraints, which although very important in practice were rarely considered in previous publications. Most importantly, optimal solutions were obtained for several well-known benchmark instances, including instances of practical relevance, that are not yet known to have been solved to optimality. Computational experiments and their results showed that the method proposed is both simple and extremely effective.
Resumo:
Competitive electricity markets have arisen as a result of power-sector restructuration and power-system deregulation. The players participating in competitive electricity markets must define strategies and make decisions using all the available information and business opportunities.
Resumo:
Although power-line communication (PLC) is not a new technology, its use to support communication with timing requirements is still the focus of ongoing research. Recently, a new infrastructure was presented, intended for communication using power lines from a central location to geographically dispersed nodes using inexpensive devices. This new infrastructure uses a two-level hierarchical power-line system, together with an IP-based network. Within this infrastructure, in order to provide end-toend communication through the two levels of the powerline system, it is necessary to fully understand the behaviour of the underlying network layers. The masterslave behaviour of the PLC MAC, together with the inherent dynamic topology of power-line networks are important issues that must be fully characterised. Therefore, in this paper we present a simulation model which is being used to study and characterise the behaviour of power-line communication.
Resumo:
This paper describes the communication stack of the REMPLI system: a structure using power-lines and IPbased networks for communication, for data acquisition and control of energy distribution and consumption. It is furthermore prepared to use alternative communication media like GSM or analog modem connections. The REMPLI system provides communication service for existing applications, namely automated meter reading, energy billing and domotic applications. The communication stack, consisting of physical, network, transport, and application layer is described as well as the communication services provided by the system. We show how the peculiarities of the power-line communication influence the design of the communication stack, by introducing requirements to efficiently use the limited bandwidth, optimize traffic and implement fair use of the communication medium for the extensive communication partners.
Resumo:
Mal sabia o Italiano Antonio Santi Giuseppe Meucci na segunda metade do século XIX (1870-1876), que a sua invenção iria alcançar um êxito sem precedente e que mudaria por completo o estilo de vida das gerações vindouras: o “Telettrofono” (telégrafo falante). Porém, e por necessidade, acabou por vender o protótipo e seus respetivos direitos, a Alexander Graham Bell, o qual ficou historicamente conhecido como o inventor do telefone. Com efeito, o telefone quase que dispensa apresentação. É um dispositivo de telecomunicações que entrou paulatinamente nas vidas das pessoas, seja no lazer, no exercícios das suas profissões, em situações de emergência, em teatro de guerra, num infindável número de situações, e que foi simplesmente planeado para transmitir sons por meio de sinais elétricos em condutores próprios para o efeito (vias telefónicas). Por definição, é um aparelho eletroacústico que permite a transformação, no ponto emissor, de energia acústica em energia elétrica e, no ponto recetor, a transformação da energia elétrica em acústica, permitindo assim a troca de informações (falada e ouvida) entre dois ou mais assinantes. Ora, a ideia de Power over Ethernet (PoE) teve, forçosamente, seu marco nos finais do século XIX, quando Alexander Bell (“Bell Telephone Company”) teve de refletir/decidir se o telefone a instalar em cada residência, seria alimentado localmente por uma bateria (fonte de energia local), ou se deveria alimentar cada dispositivo telefónico remotamente através de fios condutores. Esta é a noção de Power over Ethernet na sua vanguarda de aplicação no início do século XXI, e objeto de uma breve apresentação, à qual o convido à leitura das restantes secções.
Resumo:
A large part of power dissipation in a system is generated by I/O devices. Increasingly these devices provide power saving mechanisms to inter alia enhance battery life. While I/O device scheduling has been studied in the past for realtime systems, the use of energy resources by these scheduling algorithms may be improved. These approaches are crafted considering a huge overhead of device transition. The technology enhancement has allowed the hardware vendors to reduce the device transition overhead and energy consumption. We propose an intra-task device scheduling algorithm for real time systems that allows to shut-down devices while ensuring the system schedulability. Our results show an energy gain of up to 90% in the best case when compared to the state-of-the-art.
Resumo:
Real-time systems demand guaranteed and predictable run-time behaviour in order to ensure that no task has missed its deadline. Over the years we are witnessing an ever increasing demand for functionality enhancements in the embedded real-time systems. Along with the functionalities, the design itself grows more complex. Posed constraints, such as energy consumption, time, and space bounds, also require attention and proper handling. Additionally, efficient scheduling algorithms, as proven through analyses and simulations, often impose requirements that have significant run-time cost, specially in the context of multi-core systems. In order to further investigate the behaviour of such systems to quantify and compare these overheads involved, we have developed the SPARTS, a simulator of a generic embedded real- time device. The tasks in the simulator are described by externally visible parameters (e.g. minimum inter-arrival, sporadicity, WCET, BCET, etc.), rather than the code of the tasks. While our current implementation is primarily focused on our immediate needs in the area of power-aware scheduling, it is designed to be extensible to accommodate different task properties, scheduling algorithms and/or hardware models for the application in wide variety of simulations. The source code of the SPARTS is available for download at [1].
Resumo:
This paper studies the information content of the chromosomes of twenty-three species. Several statistics considering different number of bases for alphabet character encoding are derived. Based on the resulting histograms, word delimiters and character relative frequencies are identified. The knowledge of this data allows moving along each chromosome while evaluating the flow of characters and words. The resulting flux of information is captured by means of Shannon entropy. The results are explored in the perspective of power law relationships allowing a quantitative evaluation of the DNA of the species.