149 resultados para Management contracts


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mestrado em Engenharia Civil - Gestão da construção

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Future distribution systems will have to deal with an intensive penetration of distributed energy resources ensuring reliable and secure operation according to the smart grid paradigm. SCADA (Supervisory Control and Data Acquisition) is an essential infrastructure for this evolution. This paper proposes a new conceptual design of an intelligent SCADA with a decentralized, flexible, and intelligent approach, adaptive to the context (context awareness). This SCADA model is used to support the energy resource management undertaken by a distribution network operator (DNO). Resource management considers all the involved costs, power flows, and electricity prices, allowing the use of network reconfiguration and load curtailment. Locational Marginal Prices (LMP) are evaluated and used in specific situations to apply Demand Response (DR) programs on a global or a local basis. The paper includes a case study using a 114 bus distribution network and load demand based on real data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Competitive electricity markets have arisen as a result of power-sector restructuration and power-system deregulation. The players participating in competitive electricity markets must define strategies and make decisions using all the available information and business opportunities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building reliable real-time applications on top of commercial off-the-shelf (COTS) components is not a straightforward task. Thus, it is essential to provide a simple and transparent programming model, in order to abstract programmers from the low-level implementation details of distribution and replication. However, the recent trend for incorporating pre-emptive multitasking applications in reliable real-time systems inherently increases its complexity. It is therefore important to provide a transparent programming model, enabling pre-emptive multitasking applications to be implemented without resorting to simultaneously dealing with both system requirements and distribution and replication issues. The distributed embedded architecture using COTS components (DEAR-COTS) architecture has been previously proposed as an architecture to support real-time and reliable distributed computer-controlled systems (DCCS) using COTS components. Within the DEAR-COTS architecture, the hard real-time subsystem provides a framework for the development of reliable real-time applications, which are the core of DCCS applications. This paper presents the proposed framework, and demonstrates how it can be used to support the transparent replication of software components.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we present some of the fault tolerance management mechanisms being implemented in the Multi-μ architecture, namely its support for replica non-determinism. In this architecture, fault tolerance is achieved by node active replication, with software based replica management and fault tolerance transparent algorithms. A software layer implemented between the application and the real-time kernel, the Fault Tolerance Manager (FTManager), is the responsible for the transparent incorporation of the fault tolerance mechanisms The active replication model can be implemented either imposing replica determinism or keeping replica consistency at critical points, by means of interactive agreement mechanisms. One of the Multi-μ architecture goals is to identify such critical points, relieving the underlying system from performing the interactive agreement in every Ada dispatching point.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A large part of power dissipation in a system is generated by I/O devices. Increasingly these devices provide power saving mechanisms to inter alia enhance battery life. While I/O device scheduling has been studied in the past for realtime systems, the use of energy resources by these scheduling algorithms may be improved. These approaches are crafted considering a huge overhead of device transition. The technology enhancement has allowed the hardware vendors to reduce the device transition overhead and energy consumption. We propose an intra-task device scheduling algorithm for real time systems that allows to shut-down devices while ensuring the system schedulability. Our results show an energy gain of up to 90% in the best case when compared to the state-of-the-art.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With progressing CMOS technology miniaturization, the leakage power consumption starts to dominate the dynamic power consumption. The recent technology trends have equipped the modern embedded processors with the several sleep states and reduced their overhead (energy/time) of the sleep transition. The dynamic voltage frequency scaling (DVFS) potential to save energy is diminishing due to efficient (low overhead) sleep states and increased static (leakage) power consumption. The state-of-the-art research on static power reduction at system level is based on assumptions that cannot easily be integrated into practical systems. We propose a novel enhanced race-to-halt approach (ERTH) to reduce the overall system energy consumption. The exhaustive simulations demonstrate the effectiveness of our approach showing an improvement of up to 8 % over an existing work.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Temporal isolation is an increasingly relevant con- cern in particular for ARINC-351 and virtualisation- based systems. Traditional approaches like the rate- based scheduling framework RBED do not take into account the impact of preemptions in terms of loss of working set in the acceleration hardware (e.g. caches). While some improvements have been suggested in the literature, they are overly heavy in the presence of small high-priority tasks such as interrupt service routines. Within this paper we propose an approach enabling adaptive assessment of this preemption delay in a tem- poral isolation framework with special consideration of capabilities and limitations of the approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Existing work in the context of energy management for real-time systems often ignores the substantial cost of making DVFS and sleep state decisions in terms of time and energy and/or assume very simple models. Within this paper we attempt to explore the parameter space for such decisions and possible constraints faced.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With advancement in computer science and information technology, computing systems are becoming increasingly more complex with an increasing number of heterogeneous components. They are thus becoming more difficult to monitor, manage, and maintain. This process has been well known as labor intensive and error prone. In addition, traditional approaches for system management are difficult to keep up with the rapidly changing environments. There is a need for automatic and efficient approaches to monitor and manage complex computing systems. In this paper, we propose an innovative framework for scheduling system management by combining Autonomic Computing (AC) paradigm, Multi-Agent Systems (MAS) and Nature Inspired Optimization Techniques (NIT). Additionally, we consider the resolution of realistic problems. The scheduling of a Cutting and Treatment Stainless Steel Sheet Line will be evaluated. Results show that proposed approach has advantages when compared with other scheduling systems

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A reforma dos cuidados de saúde primários (CSP), iniciada em 2005, visa melhorar o desempenho dos centros de saúde através da reorganização dos serviços em várias unidades funcionais, no sentido de resolver os problemas tendo em conta as necessidades a satisfazer, complementando-se entre si e assumindo compromissos de acessibilidade e qualidade nos cuidados de saúde prestados. Ao mesmo tempo, são criados órgãos de gestão e governação clínica que nunca antes existiram nos CSP, envolvendo a participação da comunidade. A optimização da gestão e da governação clínica permitiu organizar os serviços de saúde em Agrupamentos de Centros de Saúde (AGES), dando-lhes poderes e responsabilidades para solucionarem problemas e tomarem as decisões acertadas e céleres, já que conhecem melhor as necessidades de saúde das populações. As relações burocráticas são substituídas por relações de contratualidade, orientadas para obter melhores resultados em saúde. Partindo destes pressupostos, o estudo realizado pretende analisar a percepção de profissionais de saúde quanto à política de humanização dos CSP, bem como, identificar/construir indicadores que avaliem essa política, sendo um estudo de carácter exploratório e descritivo, à luz de uma abordagem qualitativa. Participaram neste estudo cinco profissionais de saúde da Administração Regional de Saúde (ARS) do Norte, lP, do Departamento de Contratualização, Departamento de Estudos e Planeamento da ARS Norte e do AGES Tâmega 11 - Vale Sousa Sul, seleccionados por conveniência e inquiridos por entrevista semi-estruturada. Os dados foram tratados através da análise de conteúdo com o apoio informático NVivo9. Os resultados apresentados, com base nas entrevistas realizadas aos participantes no estudo, sustentam que os actuais indicadores quantitativos contratualizados com as unidades funcionais, expressam a política de humanização num serviço de saúde, não coincidindo totalmente com as definições internacionais expressas neste estudo.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A avaliação de empresas sempre constituiu um tema de elevada reflexão, sendo que vários especialistas tentam encontrar os modelos que melhor se adaptam a situações específicas e para as quais precisam de determinar um valor. No contexto empresarial português começa a ganhar significância a prática da gestão orientada para a criação de valor (Value-Based Management). O conceito de Value-Based Management assistiu a um particular desenvolvimento nos últimos 20 anos como resultado da globalização e desregulamentação dos mercados financeiros, dos avanços nas tecnologias de informação e do aumento da importância dos investidores institucionais. Vários analistas apresentaram evidência de que as empresas que adotam sistemas VBM melhoram o seu desempenho económico em relação a outras de dimensão semelhante no mesmo setor. É neste contexto que o EVA (Economic Value Added) se apresenta como uma métrica de desempenho privilegiada nos processos de controlo das decisões estratégicas tomadas. No presente trabalho pretendemos abordar o conceito da gestão baseada na criação de valor e a sua importância para o acionista, o que implica rever outros modelos de avaliação tradicionais baseados no valor contabilístico. Como métrica de avaliação do desempenho passado da empresa ao nível da criação de valor vamos dar particular importância ao estudo do EVA, fazendo referência à possível correlação entre esta métrica e o MVA (Market Value Added). O objetivo principal é analisar empiricamente a relação do EVA como medida de desempenho associada à criação de valor para os acionistas com a performance da empresa. Com efeito, vamos efetuar um estudo de caso, que vai incidir sobre um grupo empresarial português, referência no seu setor de atividade, o Grupo Galp Energia, cotado na Euronext Lisbon. Pensamos que a crescente prática da gestão baseada na criação de valor nas empresas cotadas em Portugal e a necessidade de aferir os resultados desta, tornam esta investigação pertinente, para além do facto de serem poucos os estudos empíricos à questão da criação de valor e a sua correlação com o valor acrescentado de mercado e com o valor de mercado dos capitais próprios das empresas cotadas em Portugal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mestrado em Engenharia Civil – ramo Tecnologia e Gestão das Construções

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Atualmente a elaboração de plano de trabalhos (utilizando a ferramenta Microsoft Project) é prática corrente em muitas empresas, como são o caso das empresas de construção civil, como meio de auxílio para o estabelecimento de prazos e articulação com as diversas subempreitadas que uma qualquer obra tem ao longo da sua execução. O presente trabalho visa demonstrar a importância da elaboração de um plano de trabalhos para o planeamento e controlo de uma instalação de Aquecimento, Ventilação e Ar Condicionado (AVAC). Recorrendo ao uso do software Microsoft Project foi elaborado um modelo de planeamento e controlo, utilizando dados reais, para o planeamento e controlo de uma instalação de AVAC. Foi ainda elaborado, através do Microsoft Excel, um plano anual de manutenções preventivas para os contratos de manutenção em vigor. No final, são indicadas as principais conclusões e as vantagens da utilização deste modelo na obtenção de melhores resultados no cumprimento de prazos e redução de custos com o pessoal afeto à empresa. São ainda perspetivados futuros desenvolvimentos utilizando essa ferramenta. Com o modelo criado, a empresa tem meios para planear e controlar uma série de parâmetros, como os prazos de entrega dos equipamentos a instalar, o número de trabalhadores necessários para desempenhar uma determinada função, os custos associados à mão-de-obra e/ou equipamento, o cumprimento de prazos estabelecidos pela empresa de construção civil e outros dados que possam vir a ser relevantes para a melhoria da rentabilidade dos projetos.