91 resultados para Detail (Architektur)


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Despite the abundant literature in knowledge management, few empirical studies have explored knowledge management in connection with international assignees. This phenomenon has a special relevance in the Portuguese context, since (a) there are no empirical studies concerning this issue that involves international Portuguese companies; (b) the national business reality is incipient as far as internationalisation is concerned, and; (c) the organisational and national culture presents characteristics that are distinctive from the most highly studied contexts (e.g., Asia, USA, Scandinavian countries, Spain, France, The Netherlands, Germany, England and Russia). We examine the role of expatriates in transfer and knowledge sharing within the Portuguese companies with operations abroad. We focus specifically on expatriates’ role on knowledge sharing connected to international Portuguese companies and our findings take into account organizational representatives’ and expatriates’ perspectives. Using a comparative case study approach, we examine how three main dimensions influence the role of expatriates in knowledge sharing among headquarters and their subsidiaries (types of international assignment, reasons for using expatriation and international assignment characteristics). Data were collected using semi‐structured interviews to 30 Portuguese repatriates and 14 organizational representatives from seven Portuguese companies. The findings suggest that the reasons that lead Portuguese companies to expatriating employees are connected to: (1) business expansion needs; (2) control of international operations and; (3) transfer and knowledge sharing. Our study also shows that Portuguese companies use international assignments in order to positively respond to the increasingly decaying domestic market in the economic areas in which they operate. Evidence also reveals that expatriation is seen as a strategy to fulfill main organizational objectives through their expatriates (e.g., business internationalization, improvement of the coordination and control level of the units/subsidiaries abroad, replication of aspects of the home base, development and incorporation of new organizational techniques and processes). We also conclude that Portuguese companies have developed an International Human Resources Management strategy, based on an ethnocentric approach, typically associated with companies in early stages of internationalization, i.e., the authority and decision making are centered in the home base. Expatriates have a central role in transmitting culture and technical knowledge from company’s headquarters to the company’s branches. Based on the findings, the article will discuss in detail the main theoretical and managerial implications. Suggestions for further research will also be presented.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper examines the relationship between the level of satisfaction towards Human Resources Management practices among repatriates and the decision to remain on the home company after expatriation. Data was collected through semi-structured interviews of 28 Portuguese repatriates who remain and 16 organisational representatives from eight companies located in Portugal. The results show that (1) compensation system during the international assignment; (2) permanent support during the international assignment and; (3) recognition upon the return of the work and effort of expatriates during the international assignment are the most important HRM practices for promoting satisfaction among repatriates. Moreover, it is at repatriation phase that repatriates show higher dissatisfaction with HRM support. These findings will be discussed in detail and implications and suggestions for future research will be proposed as well.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pretende-se com este trabalho fazer um estudo detalhado de um troço da Estrada Municipal 607, situado no concelho de Valongo, caracterizando o seu estado de degradação e definindo qual ou quais as soluções mais convenientes de reabilitação a adotar. O pavimento alvo deste trabalho é abrangido por três ruas pertencentes à EM 607, Rua de Vilar, Rua de Cabeda e Rua D. Pedro IV e apresenta uma extensão total de 4,8 km. Este trabalho pode ser dividido em duas partes distintas: uma primeira parte, mais do âmbito teórico, onde é feita uma abordagem histórica desde o desenvolvimento dos pavimentos rodoviários até aos métodos e pavimentos existentes na atualidade e uma segunda parte, que diz respeito ao desenvolvimento prático do trabalho, onde é feito um estudo do pavimento e são apresentadas soluções de reabilitação e respetivos dimensionamentos. Iniciou-se o estudo do pavimento com uma análise geral das patologias existentes, definindo o estado de degradação em que este se encontra. Concluiu-se que se estava na presença de um pavimento muito degradado, havendo troços com um nível de degradação muito elevado, o que proporciona desconforto na circulação dos condutores. Foi efetuado um estudo de tráfego de pesados, onde se percebeu que se tratava de um pavimento com intenso tráfego de pesados e que talvez este pavimento não esteja apto para o suportar. A retirada de carotes veio confirmar este pressuposto, pois as espessuras das camadas betuminosas mostraram ser insuficientes para o atual volume de tráfego. As soluções de reabilitação foram ao encontro de várias soluções para diferentes situações, dando aos responsáveis da Câmara Municipal de Valongo a possibilidade de optarem por aquela que melhor se ajuste às suas necessidades, bem como às suas condições financeiras. Assim, foram propostas três soluções para três capacidades de resistência e períodos de vida úteis distintos. A primeira solução engloba a remoção do pavimento existente e colocação de uma estrutura completamente nova, com três camadas betuminosas e dimensionada para o volume de tráfego atual, apresentando um período de vida útil de 20 anos, mas que é mais dispendiosa. A segunda solução apresenta apenas duas camadas betuminosas, onde seriam removidas apenas as camadas betuminosas, aproveitando a camada de sub-base. Esta solução tem um período de vida útil estimado de cerca de 8 anos. A terceira solução, com um período de vida útil de 5 anos, baseia-se na remoção parcial de uma largura da faixa de rodagem, aproveitando a restante. Na largura removida seria colocada uma estrutura de pavimento nova e dimensionada na segunda solução. Por último, foi dimensionado o sistema de drenagem transversal e longitudinal, sendo caracterizadas as linhas de águas e as respetivas bacias hidrográficas. As valetas e passagens hidráulicas existentes não estão dimensionadas para o atual escoamento de águas pluviais a que o pavimento está sujeito. As valetas são muito reduzidas, apresentando-se em alguns casos degradadas ou a necessitarem de limpeza urgente.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Además del acogimiento familiar, el sistema de protección infantil incluye, en general, otras dos medidas de colocación, el acogimiento en instituciones y la adopción, que retiran a los menores de su ambiente y les colocan en otro medio de vida, proporcionándoles una casa y un contexto de vida alternativo. Este artículo analiza los detalles de cada una de ellas, compara los criterios de su selección y las finalidades de aplicación, describe su reciente evolución e se interroga por algunos de los desafíos que el presente y el futuro les señala.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pain transmission at the spinal cord is modulated by descending actions that arise from supraspinal areas which collectively form the endogenous pain control system. Two key areas involved of the endogenous pain control system have a circunventricular location, namely the periaqueductal grey (PAG) and the locus coeruleus (LC). The PAG plays a crucial role in descending pain modulation as it conveys the input from higher brain centers to the spinal cord. As to the LC, it is involved in descending pain inhibition by direct noradrenergic projections to the spinal cord. In the context of neurological defects, several diseases may affect the structure and function of the brain. Hydrocephalus is a congenital or acquired disease characterized by an enlargement of the ventricles which leads to a distortion of the adjacent tissues, including the PAG and LC. Usually, patients suffering from hydrocephalus present dysfunctions in learning and memory and also motor deficits. It remains to be evaluated if lesions of the periventricular brain areas involved in pain control during hydrocephalus may affect descending pain control and, herein, affect pain responses. The studies included in the present thesis used an experimental model of hydrocephalus (the rat injected in the cisterna magna with kaolin) to study descending modulation of pain, focusing on the two circumventricular regions referred above (the PAG and the LC). In order to evaluate the effects of kaolin injection into the cisterna magna, we measured the degree of ventricular dilatation in sections encompassing the PAG by standard cytoarquitectonic stanings (thionin staining). For the LC, immunodetection of the noradrenaline-synthetizing enzyme tyrosine hydroxylase (TH) was performed, due to the noradrenergic nature of the LC neurons. In general, rats with kaolin-induced hydrocephalus presented a higher dilatation of the 4th ventricle, along with a tendency to a higher area of the PAG. Due to the validated role of detection the c-fos protooncogene as a marker of neuronal activation, we also studied neuronal activation in the several subnuclei which compose the PAG, namely the dorsomedial, dorsolateral, lateral and ventrolateral (VLPAG) parts. A decrease in the numbers of neurons immunoreactive for Fos protein (the product of activation of the c-fos protooncogene) was detected in rats injected with kaolin, whereas the remaining PAG subnuclei did not present changes in Fos-immunoreactive nuclei. Increases in the levels of TH in the LC, namely at the rostral parts of the nucleus, were detected in hydrocephalic animals. The following pain-related parameters were measured, namely 1) pain behavioural responses in a validated pain inflammatory test (the formalin test) and 2) the nociceptive activation of spinal cord neurons. A decrease in behavioral responses was detected in rats with kaolin-induced hydrocephalus was detected, namely in the second phase of the test (inflammatory phase). This is the phase of the formalin test in which the motor behaviour is less important, which is important since a semi-quantitative analysis of the motor performance of rats injected with kaolin indicates that these animals may present some motor impairments. Collectively, the results of the behavioral studies indicate that rats with kaolin-induced hydrocephalus exhibit hypoalgesia. A decrease in Fos expression was detected at the superficial dorsal layers of the spinal cord in rats with kaolin-induced hydrocephalus, further indicating that hydrocephalus decreases nociceptive responses. It remains to be ascertained if this is due to alterations in the PAG and LC in the rats with kaolin-induced hydrocephalus, which may affect descending pain modulation. It remains to be evaluated what are the mechanisms underlying the increased pain inhibition at the spinal dorsal horn in the hydrocephalus rats. Regarding the VLPAG, the decrease in neuronal activity may impair descending modulation. Since the LC has higher levels of TH in rats with kaolininduced hydrocephalus, which also appears to increase the noradrenergic innervation in the spinal dorsal horn, it is possible that an increase in the release of noradrenaline at the spinal cord accounts for pain inhibition. Our studies also determine the need to study in detail patients with hydrocephalus namely in what concerns their thresholds to pain and to perform imaging studies focused on the structure and function of pain control areas in the brain.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Relatório de estágio apresentado no Instituto Superior de Contabilidade e Administração do Porto para obtenção do Grau de Mestre em Gestão das Organizações, Ramo de Gestão de Empresas Orientado por Prof. Doutor Eduardo Manuel Lopes de Sá e Silva Co-Orientado pelo Mestre Adalmiro Álvaro Malheiro de Castro Andrade Pereira

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Nowadays, data centers are large energy consumers and the trend for next years is expected to increase further, considering the growth in the order of cloud services. A large portion of this power consumption is due to the control of physical parameters of the data center (such as temperature and humidity). However, these physical parameters are tightly coupled with computations, and even more so in upcoming data centers, where the location of workloads can vary substantially due, for example, to workloads being moved in the cloud infrastructure hosted in the data center. Therefore, managing the physical and compute infrastructure of a large data center is an embodiment of a Cyber-Physical System (CPS). In this paper, we describe a data collection and distribution architecture that enables gathering physical parameters of a large data center at a very high temporal and spatial resolution of the sensor measurements. We think this is an important characteristic to enable more accurate heat-flow models of the data center and with them, find opportunities to optimize energy consumptions. Having a high-resolution picture of the data center conditions, also enables minimizing local hot-spots, perform more accurate predictive maintenance (failures in all infrastructure equipments can be more promptly detected) and more accurate billing. We detail this architecture and define the structure of the underlying messaging system that is used to collect and distribute the data. Finally, we show the results of a preliminary study of a typical data center radio environment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

XXXIII Simpósio Brasileiro de Redes de Computadores e Sistemas Distribuídos (SBRC 2015). 15 to 19, May, 2015, III Workshop de Comunicação em Sistemas Embarcados Críticos. Vitória, Brasil.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents the TEC4SEA research infrastructure created in Portugal to support research, development, and validation of marine technologies. It is a multidisciplinary open platform, capable of supporting research, development, and test of marine robotics, telecommunications, and sensing technologies for monitoring and operating in the ocean environment. Due to the installed research facilities and its privileged geographic location, it allows fast access to deep sea, and can support multidisciplinary research, enabling full validation and evaluation of technological solutions designed for the ocean environment. It is a vertically integrated infrastructure, in the sense that it possesses a set of skills and resources which range from pure conceptual research to field deployment missions, with strong industrial and logistic capacities in the middle tier of prototype production. TEC4SEA is open to the entire scientific and enterprise community, with a free access policy for researchers affiliated with the research units that ensure its maintenance and sustainability. The paper describes the infrastructure in detail, and discusses associated research programs, providing a strategic vision for deep sea research initiatives, within the context of both the Portuguese National Ocean Strategy and European Strategy frameworks.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper we introduce a formation control loop that maximizes the performance of the cooperative perception of a tracked target by a team of mobile robots, while maintaining the team in formation, with a dynamically adjustable geometry which is a function of the quality of the target perception by the team. In the formation control loop, the controller module is a distributed non-linear model predictive controller and the estimator module fuses local estimates of the target state, obtained by a particle filter at each robot. The two modules and their integration are described in detail, including a real-time database associated to a wireless communication protocol that facilitates the exchange of state data while reducing collisions among team members. Simulation and real robot results for indoor and outdoor teams of different robots are presented. The results highlight how our method successfully enables a team of homogeneous robots to minimize the total uncertainty of the tracked target cooperative estimate while complying with performance criteria such as keeping a pre-set distance between the teammates and the target, avoiding collisions with teammates and/or surrounding obstacles.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O pretexto da implementação de um Sistema de Gestão da Qualidade numa empresa de produção de fundos copados, constitui pretexto para provocar uma análise mais profunda e fundamentada do tema e objetivo para este projeto. Entender um conceito tão subjetivo como o de qualidade afigura-se como necessidade primária para o início da reflexão. Percorremos em seguida a história do conceito desde a Europa Medieval até à revolução na qualidade que acabaria por acontecer no Japão após a II Guerra Mundial. A qualidade como a entendemos hoje deve-se ainda a contributos de personalidades que identificaram vários métodos que surgiram ao longo do tempo e que foram melhorando o conceito, de entre as quais se referem três: William Deming, Joseph Moses Juran e Philip B. Crosby. Em seguida reflete-se acerca do impacto real da implementação da ISO 9000, recorrendo ao estudo de Olivier Boiral, que fornece uma aproximação bastante real dos benefícios da implementação de sistemas de gestão da qualidade. Ainda no segundo capítulo analisamos a importância do processo de certificação, concluindo que a tarefa extra de uma organização externa certificar o SGQ constitui indubitavelmente uma forma de manter o sistema rigoroso e disciplinado. No terceiro capítulo, “ISO 9001:2008 VERSUS ISO 9001:2015”, analisamos em detalhe as principais alterações da futura norma ISO 9001:2015 relativamente à iISO 9001:2008: introdução do “pensamento baseado no risco”; enfase dado à abordagem por processos; enfase dado à “gestão da mudança”; “gestão do conhecimento”; “direção estratégica”, integrando os sistemas de gestão e da qualidade; a determinação de que todas as normas que integram um sistema de gestão seguirão um novo formato, chamado “high-level structure” como definido no Anexo SL; e enfase ainda dado à consideração do feedback de todos os processos e stakeholders envolvidos. Seguidamente, no capítulo “Apresentação da “Empresa Lda””, apresenta-se a empresa alvo deste caso de estudo, uma indústria metalomecânica que fabrica fundos copados para o mercado nacional e internacional. Analisadas as principais alterações entre a atual e a futura norma, no capítulo “SGQ Proposto Assente na Futura Norma ISO 9001:2015” propõem-se alterações ao sistema já implementado anteriormente com base na aceitação da futura ISO 9001:2015 e alterações que esta prevê. Os processos e procedimentos que representem mais tempo e custo serão 6 identificados, assim como aqueles que poderão ser mais rapidamente adaptados para que o SGQ seja assim otimizado e mais adaptado aos recursos disponíveis. Para esta reflexão e desenvolvimento de uma nova estratégia recorre-se a vários instrumentos: estabelecem-se objetivos, efectua-se a análise SWOT, uma análise FMEA, a Análise de Gestão do Conhecimento e finalmente a Análise das Partes Interessadas. Em conjunto com as propostas de ações referidas nas análises anteriores descrevem-se de seguida as propostas de ação de intervenção nos fluxogramas. Os processos e procedimentos que aqui se destacam são aqueles que se consideram poderem constituir impacto eficaz e que vão ao encontro daquilo que é proposto na nova norma ISO 9001:2015, tendo em conta as principais alterações vistas anteriormente.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O presente relatório, desenvolvido no âmbito do estágio curricular realizado na Cociga-Construções Civis de Gaia, SA, tem como objetivo principal caracterizar as diversas etapas que constituem o desenvolvimento de uma obra, que consiste na reconstrução de um edifício. Para tal, procedeu-se à descrição e análise dos respetivos métodos organizacionais, construtivos e orçamentais aplicados na execução da obra para a Caetano Parts. O trabalho teve início com a caracterização da obra em questão e respetivo enquadramento espacial e regional. De seguida, foram descritas as principais etapas do desenvolvimento da obra, como concurso/adjudicação, preparação, contrato, execução e fecho da mesma. Não esquecendo que uma das tarefas mais importantes na fase inicial da obra, após a adjudicação, foi a organização da documentação necessária para que esta pudesse ter início. Na fase referente à execução, foram descritos de forma detalhada e acompanhados, em alguns casos, de registos de imagens, os procedimentos que constituíram as diferentes fases da obra, assim como os métodos construtivos correspondentes. O presente trabalho engloba o registo e a catalogação dos documentos necessários para as diferentes etapas da obra de reconstrução. Durante a realização das diferentes etapas e respetivo registo das mesmas, foi possível concluir que a boa qualidade da prestação de serviços por parte dos trabalhadores da empresa e dos subempreiteiros, possibilitou a concretização de uma obra com altos padrões de qualidade e de acordo com os objetivos do proprietário e da empresa responsável pela execução da mesma. Por último, a realização deste trabalho possibilitou o registo, análise e posterior reflexão sobre os procedimentos legais, logísticos e técnicos a ter em conta aquando da realização de uma obra e que são fatores fundamentais para que se possam manter os padrões de qualidade, rigor e sucesso da mesma.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Infraestrutura com mais de um século de história, o Porto de Leixões encontra-se em fase de renovação com a criação de um emblemático Edifício de Terminal de Cruzeiros. Obra de arquitetura arrojada, o edifício é implantado em condições geológico-geotécnicas adversas e na convivência com o efeito da água do mar e das respetivas marés. O presente relatório é relativo a um Estágio realizado na obra numa fase de execução dos trabalhos de fundações e de contenções periféricas (ensecadeira). Apresentam-se as soluções sugeridas em projeto, as soluções apresentadas inicialmente pelo construtor e as alternativas a estas, propostas já durante a obra. Descrevem-se as diferentes soluções, identificando os equipamentos, recursos humanos e procedimentos envolvidos. Comparam-se os respetivos rendimentos e custos. Apresenta-se o Plano de Instrumentação e de Monitorização implementado em obra. Descreve-se em pormenor o trabalho realizado pelo estagiário, em obra, no decurso do estágio.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study proposes a new methodology to increase the power delivered to any load point in a radial distribution network, through the identification of new investments in order to improve the repair time. This research work is innovative and consists in proposing a full optimisation model based on mixed-integer non-linear programming considering the Pareto front technique. The goal is to achieve a reduction in repair times of the distribution networks components, while minimising the costs of that reduction as well as non-supplied energy costs. The optimisation model considers the distribution network technical constraints, the substation transformer taps, and it is able to choose the capacitor banks size. A case study based on a 33-bus distribution network is presented in order to illustrate in detail the application of the proposed methodology.