177 resultados para software project
Resumo:
The overall goal of the REMPLI project is to design and implement a communication infrastructure for distributed data acquisition and remote control operations using the power grid as the communication medium. The primary target application is remote meter reading with high time resolution, where the meters can be energy, heat, gas, or water meters. The users of the system (e.g. utility companies) will benefit from the REMPLI system by gaining more detailed information about how energy is consumed by the end-users. In this context, the power-line communication (PLC) is deployed to cover the distance between utility company’s Private Network and the end user. This document specifies a protocol for real-time PLC, in the framework of the REMPLI project. It mainly comprises the Network Layer and Data Link Layer. The protocol was designed having into consideration the specific aspects of the network: different network typologies (star, tree, ring, multiple paths), dynamic changes in network topology (due to network maintenance, hazards, etc.), communication lines strongly affected by noise.
Resumo:
A partir da década de noventa do século passado, começaram a surgir no mercado ferramentas de cálculo com o objetivo de agilizar a conceção do projeto de engenharia da construção. Até ao final da década de setenta os computadores existentes eram enormes, apenas entidades de grande poder económico os podiam adquirir. Na década de oitenta surgiu no mercado o PC, Personal Computer, estas pequenas máquinas começaram a ser adquiridas pela generalidade das empresas e em Portugal no final desta década era possível encontrar indivíduos que já possuíam o seu PC. Na década de noventa, a saída de recém-formados das instituições de ensino superior, fomentou no mercado o aparecimento de empresas de informática dedicadas à conceção de software de acordo com as necessidades do próprio mercado, daí resultando software comercial à medida e software comercial de prateleira (COTS, Commercial Off-The-Shelf)). O software comercial, ao ser utilizado por um grande número de pessoas, atingindo facilmente, no caso do COTS, os milhares, tem condições para evoluir de acordo com as exigências sistemáticas do próprio mercado, atingindo elevados patamares no cumprimento de requisitos de qualidade, nomeadamente no que concerne à funcionalidade, fiabilidade, usabilidade, manutenibilidade, eficiência, portabilidade e qualidade na utilização. A utilização de software comercial na área do projeto de engenharia da construção é hoje em dia uma prática absolutamente generalizada. A seleção do software pode tornar-se um processo complexo especialmente naquelas áreas em que existe grande oferta. A utilização de critérios de avaliação bem definidos poderá agilizar o processo e dar maiores garantias no momento da decisão final. Neste documento apresenta-se uma proposta de metodologia para avaliação e comparação de softwares.
Resumo:
The recent trends of chip architectures with higher number of heterogeneous cores, and non-uniform memory/non-coherent caches, brings renewed attention to the use of Software Transactional Memory (STM) as a fundamental building block for developing parallel applications. Nevertheless, although STM promises to ease concurrent and parallel software development, it relies on the possibility of aborting conflicting transactions to maintain data consistency, which impacts on the responsiveness and timing guarantees required by embedded real-time systems. In these systems, contention delays must be (efficiently) limited so that the response times of tasks executing transactions are upper-bounded and task sets can be feasibly scheduled. In this paper we assess the use of STM in the development of embedded real-time software, defending that the amount of contention can be reduced if read-only transactions access recent consistent data snapshots, progressing in a wait-free manner. We show how the required number of versions of a shared object can be calculated for a set of tasks. We also outline an algorithm to manage conflicts between update transactions that prevents starvation.
Resumo:
The foreseen evolution of chip architectures to higher number of, heterogeneous, cores, with non-uniform memory and non-coherent caches, brings renewed attention to the use of Software Transactional Memory (STM) as an alternative to lock-based synchronisation. However, STM relies on the possibility of aborting conflicting transactions to maintain data consistency, which impacts on the responsiveness and timing guarantees required by real-time systems. In these systems, contention delays must be (efficiently) limited so that the response times of tasks executing transactions are upperbounded and task sets can be feasibly scheduled. In this paper we defend the role of the transaction contention manager to reduce the number of transaction retries and to help the real-time scheduler assuring schedulability. For such purpose, the contention management policy should be aware of on-line scheduling information.
Resumo:
Within the European project R-Fieldbus (http://www.hurray.isep.ipp.pt/activities/rfieldbus/), an industrial manufacturing field trial was developed. This field trial was conceived as a demonstration test bed for the technologies developed during the project. Because the R-Fieldbus field trial included prototype hardware devices, the purpose of this equipment changed and since the conclusion of the project, several new technologies also emerged, therefore an update of the field trial was required. This document describes an update of the manufacturing field trial. The purpose of this update, the changes and improvements introduced are described in the document. Additionally, this document also provides a reliable source of documentation for the equipment, configuration and software components of the manufacturing field trial.
Resumo:
Consider a multihop network comprising Ethernet switches. The traffic is described with flows and each flow is characterized by its source node, its destination node, its route and parameters in the generalized multiframe model. Output queues on Ethernet switches are scheduled by static-priority scheduling and tasks executing on the processor in an Ethernet switch are scheduled by stride scheduling. We present schedulability analysis for this setting.
Resumo:
Interactive products are appealing objects in a technology-driven society and the offer in the market is wide and varied. Most of the existing interactive products only provide either light or sound experiences. Therefore, the goal of this project was to develop a product aimed for children combining both features. This project was developed by a team of four thirdyear students with different engineering backgrounds and nationalities during the European Project Semester at ISEP (EPS@ISEP) in 2012. This paper presents the process that led to the development of an interactive sound table that combines nine identical interaction blocks, a control block and a sound block. Each interaction block works independently and is composed of four light emitting diodes (LED) and one infrared (IR) sensor. The control is performed by an Arduino microcontroller and the sound block includes a music shield and a pair of loud speakers. A number of tests were carried out to assess whether the controller, IR sensors, LED, music shield and speakers work together properly and if the ensemble was a viable interactive light and sound device for children.
Resumo:
Waste oil recycling companies play a very important role in our society. Competition among companies is tough and process optimization is essential for survival. By equipping oil containers with a level monitoring system that periodically reports the level and alerts when it reaches the preset threshold, the oil recycling companies are able to streamline the oil collection process and, thus, reduce the operation costs while maintaining the quality of service. This paper describes the development of this level monitoring system by a team of four students from different engineering backgrounds and nationalities. The team conducted a study of the state of the art, draw marketing and sustainable development plans and, finally, designed and implemented a prototype that continuously measures the container content level and sends an alert message as soon as it reaches the preset capacity.
Resumo:
In Nonlinear Optimization Penalty and Barrier Methods are normally used to solve Constrained Problems. There are several Penalty/Barrier Methods and they are used in several areas from Engineering to Economy, through Biology, Chemistry, Physics among others. In these areas it often appears Optimization Problems in which the involved functions (objective and constraints) are non-smooth and/or their derivatives are not know. In this work some Penalty/Barrier functions are tested and compared, using in the internal process, Derivative-free, namely Direct Search, methods. This work is a part of a bigger project involving the development of an Application Programming Interface, that implements several Optimization Methods, to be used in applications that need to solve constrained and/or unconstrained Nonlinear Optimization Problems. Besides the use of it in applied mathematics research it is also to be used in engineering software packages.
Resumo:
A construction project is a group of discernible tasks or activities that are conduct-ed in a coordinated effort to accomplish one or more objectives. Construction projects re-quire varying levels of cost, time and other resources. To plan and schedule a construction project, activities must be defined sufficiently. The level of detail determines the number of activities contained within the project plan and schedule. So, finding feasible schedules which efficiently use scarce resources is a challenging task within project management. In this context, the well-known Resource Constrained Project Scheduling Problem (RCPSP) has been studied during the last decades. In the RCPSP the activities of a project have to be scheduled such that the makespan of the project is minimized. So, the technological precedence constraints have to be observed as well as limitations of the renewable resources required to accomplish the activities. Once started, an activity may not be interrupted. This problem has been extended to a more realistic model, the multi-mode resource con-strained project scheduling problem (MRCPSP), where each activity can be performed in one out of several modes. Each mode of an activity represents an alternative way of combining different levels of resource requirements with a related duration. Each renewable resource has a limited availability for the entire project such as manpower and machines. This paper presents a hybrid genetic algorithm for the multi-mode resource-constrained pro-ject scheduling problem, in which multiple execution modes are available for each of the ac-tivities of the project. The objective function is the minimization of the construction project completion time. To solve the problem, is applied a two-level genetic algorithm, which makes use of two separate levels and extend the parameterized schedule generation scheme. It is evaluated the quality of the schedules and presents detailed comparative computational re-sults for the MRCPSP, which reveal that this approach is a competitive algorithm.
Resumo:
This paper presents a genetic algorithm for the resource constrained multi-project scheduling problem. The chromosome representation of the problem is based on random keys. The schedules are constructed using a heuristic that builds parameterized active schedules based on priorities, delay times, and release dates defined by the genetic algorithm. The approach is tested on a set of randomly generated problems. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
This paper presents a genetic algorithm-based approach for project scheduling with multi-modes and renewable resources. In this problem activities of the project may be executed in more than one operating mode and renewable resource constraints are imposed. The objective function is the minimization of the project completion time. The idea of this approach is integrating a genetic algorithm with a schedule generation scheme. This study also proposes applying a local search procedure trying to yield a better solution when the genetic algorithm and the schedule generation scheme obtain a solution. The experimental results show that this algorithm is an effective method for solving this problem.
Resumo:
The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.
Resumo:
- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm
Resumo:
This paper presents a biased random-key genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. Active schedules are constructed using a priority-rule heuristic in which the priorities of the activities are defined by the genetic algorithm. A forward-backward improvement procedure is applied to all solutions. The chromosomes supplied by the genetic algorithm are adjusted to reflect the solutions obtained by the improvement procedure. The heuristic is tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.