79 resultados para business methods


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The development of an intelligent wheelchair (IW) platform that may be easily adapted to any commercial electric powered wheelchair and aid any person with special mobility needs is the main objective of this project. To be able to achieve this main objective, three distinct control methods were implemented in the IW: manual, shared and automatic. Several algorithms were developed for each of these control methods. This paper presents three of the most significant of those algorithms with emphasis on the shared control method. Experiments were performed by users suffering from cerebral palsy, using a realistic simulator, in order to validate the approach. The experiments revealed the importance of using shared (aided) controls for users with severe disabilities. The patients still felt having complete control over the wheelchair movement when using a shared control at a 50% level and thus this control type was very well accepted. Thus it may be used in intelligent wheelchairs since it is able to correct the direction in case of involuntary movements of the user but still gives him a sense of complete control over the IW movement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Forest fires dynamics is often characterized by the absence of a characteristic length-scale, long range correlations in space and time, and long memory, which are features also associated with fractional order systems. In this paper a public domain forest fires catalogue, containing information of events for Portugal, covering the period from 1980 up to 2012, is tackled. The events are modelled as time series of Dirac impulses with amplitude proportional to the burnt area. The time series are viewed as the system output and are interpreted as a manifestation of the system dynamics. In the first phase we use the pseudo phase plane (PPP) technique to describe forest fires dynamics. In the second phase we use multidimensional scaling (MDS) visualization tools. The PPP allows the representation of forest fires dynamics in two-dimensional space, by taking time series representative of the phenomena. The MDS approach generates maps where objects that are perceived to be similar to each other are placed on the map forming clusters. The results are analysed in order to extract relationships among the data and to better understand forest fires behaviour.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Multi-criteria decision analysis(MCDA) has been one of the fastest-growing areas of operations research during the last decades. The academic attention devoted to MCDA motivated the development of a great variety of approaches and methods within the field. These methods distinguish themselves in terms of procedures, theoretical assumptions and type of decision addressed. This diversity poses challenges to the process of selecting the most suited method for a specific real-world decision problem. In this paper we present a case study in a real-world decision problem arising in the painting sector of an automobile plant. We tackle the problem by resorting to the well-known AHP method and to the MCDA method proposed by Pereira and Fontes (2012) (MMASSI). By relying on two, rather than one, MCDA methods we expect to improve the confidence and robustness of the obtained results. The contributions of this paper are twofold: first, we intend to investigate the contrasts and similarities of the results obtained by distinct MCDA approaches (AHP and MMASSI); secondly, we expect to enrich the literature of the field with a real-world MCDA case study on a complex decision making problem since there is a paucity of applied research work addressing real decision problems faced by organizations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A presente dissertação foi realizada em colaboração com o grupo empresarial Monteiro, Ribas, tendo como principal objectivo a realização de uma auditoria à gestão dos resíduos industriais produzidos pelas suas fábricas localizadas na Estrada da Circunvalação, no Porto. Para cumprir este objectivo, inicialmente foi efectuado um levantamento das obrigações legais relativas aos resíduos e foram procuradas práticas aconselhadas para a gestão interna. Para cada uma das fábricas, verificaram-se, quais os resíduos produzidos e analisaram-se os seus percursos, considerando as suas origens, os locais e modos de acondicionamento na origem, os modos de transporte interno, os locais e modos de armazenagem preliminar, e ainda, as quantidades produzidas, os transportadores, os operadores finais e as operações finais de gestão, sendo que estas quatro últimas informações são relativas ao ano 2013. De seguida procedeu-se à realização da auditoria nas diferentes unidades, verificando o cumprimento dos requisitos legais e das boas práticas em matéria de gestão de resíduos. As principais não conformidades detectadas, comuns às várias unidades fabris foram a inexistência de local/recipiente definido para acondicionamento de alguns resíduos, a falta ou insuficiente identificação de recipientes/zonas de acondicionamento, a inexistência de bacias de retenção para resíduos líquidos perigosos, o facto de no transporte interno apenas os resíduos perigosos serem cobertos e, os resíduos líquidos perigosos não serem transportados sobre bacias de retenção móveis nem com o material necessário para absorver derrames. Para cada resíduo e para cada unidade industrial foram propostas medidas correctivas e/ou de melhoria, quando aplicável. Relativamente à armazenagem preliminar, a principal inconformidade detectada foi o facto de todos os parques (quatro) possuírem resíduos perigosos no momento das auditorias, o que não é adequado. Foram propostas medidas correctivas e/ou de melhoria para cada parque. Como proposta global, tendo em conta factores económicos e de segurança, sugeriu-se que apenas o parque de resíduos perigosos possa armazenar este tipo de resíduos, pelo que os procedimentos de transporte interno devem ser melhorados, fazendo com que estes resíduos sejam transportados directamente para o parque de resíduos perigosos. Desta forma dois dos parques devem sofrer algumas remodelações, nomeadamente serem cobertos e fechados, ainda que não totalmente, e o parque de resíduos perigosos deve ser fechado, mantendo aberturas para ventilação, deve ser equipado com kit´s de contenção de derrames, fichas de segurança, procedimentos a realizar em caso de emergência, e ainda, devido ao facto do sistema de contenção de derrames ser pequeno face ao total de armazenamento, aconselha-se o uso de bacias de retenção para alguns dos recipientes de resíduos líquidos perigosos. Ao longo deste processo e em consequência da realização da auditoria, algumas situações consideradas não conformes foram sendo corrigidas. Também foram preparadas instruções de trabalho adequadas que serão posteriormente disponibilizadas. Foi ainda elaborada uma metodologia de avaliação de processos como base de trabalho para redução dos resíduos gerados. A etapa escolhida para a aplicação da mesma foi uma etapa auxiliar do processo produtivo da Monteiro, Ribas - Revestimentos, S.A - a limpeza de cubas com solventes, por forma a tentar minimizar os resíduos de solventes produzidos nesta operação. Uma vez que a fábrica já realiza a operação tendo em consideração medidas de prevenção e reutilização, a reciclagem é neste momento a única forma de tentar minimizar os resíduos de solventes. Foram então estudadas duas opções, nomeadamente a aquisição de um equipamento de regeneração de solventes e a contratação de uma operadora que proceda à regeneração dos resíduos de solventes e faça o retorno do solvente regenerado. A primeira opção poderá permitir uma redução de cerca de 95% na produção de resíduos de solventes e na aquisição de solvente puro, estimando-se uma poupança anual de cerca de **** €, com um período de recuperação do capital de cerca de 16 meses e a segunda pode conduzir a uma redução significativa na aquisição de solvente puro, cerca de 65%, e a uma poupança anual de cerca de **** €.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main objective of this work is to report on the development of a multi-criteria methodology to support the assessment and selection of an Information System (IS) framework in a business context. The objective is to select a technological partner that provides the engine to be the basis for the development of a customized application for shrinkage reduction on the supply chains management. Furthermore, the proposed methodology di ers from most of the ones previously proposed in the sense that 1) it provides the decision makers with a set of pre-defined criteria along with their description and suggestions on how to measure them and 2)it uses a continuous scale with two reference levels and thus no normalization of the valuations is required. The methodology here proposed is has been designed to be easy to understand and use, without a specific support of a decision making analyst.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Relatório de Estágio Apresentado ao Instituto de Contabilidade e Administração do Porto para a obtenção do grau de Mestre em Empreendedorismo e Internacionalização, sob orientação da Mestre Inês Veiga Pereira

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Atualmente, verifica-se um aumento na necessidade de software feito à medida do cliente, que se consiga adaptar de forma rápida as constantes mudanças da sua área de negócio. Cada cliente tem os seus problemas concretos que precisa de resolver, não lhe sendo muitas vezes possível dispensar uma elevada quantidade de recursos para atingir os fins pretendidos. De forma a dar resposta a estes problemas surgiram várias arquiteturas e metodologias de desenvolvimento de software, que permitem o desenvolvimento ágil de aplicações altamente configuráveis, que podem ser personalizadas por qualquer utilizador das mesmas. Este dinamismo, trazido para as aplicações sobre a forma de modelos que são personalizados pelos utilizadores e interpretados por uma plataforma genérica, cria maiores desafios no momento de realizar testes, visto existir um número de variáveis consideravelmente maior que numa aplicação com uma arquitetura tradicional. É necessário, em todos os momentos, garantir a integridade de todos os modelos, bem como da plataforma responsável pela sua interpretação, sem ser necessário o desenvolvimento constante de aplicações para suportar os testes sobre os diferentes modelos. Esta tese debruça-se sobre uma aplicação, a plataforma myMIS, que permite a interpretação de modelos orientados à gestão, escritos numa linguagem específica de domínio, sendo realizada a avaliação do estado atual e definida uma proposta de práticas de testes a aplicar no desenvolvimento da mesma. A proposta resultante desta tese permitiu verificar que, apesar das dificuldades inerentes à arquitetura da aplicação, o desenvolvimento de testes de uma forma genérica é possível, podendo as mesmas lógicas ser utilizadas para o teste de diversos modelos distintos.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This communication aims to present some reflections regarding the importance of information in organizational context, especially in business context. The ability to produce and to share expertise and knowledge among its employees is now a key factor in the success of any organization. However, it’s also true that workers are increasingly feeling that too much information can hurt their performance. The existence of skilled professionals able to organize, evaluate, select and disseminate information in organizations appears to be a prerequisite for success. The skills necessary for the formation of a professional devoted to the management of information and knowledge in the context of business organizations will be analysed. Then data collected in two focus group discussion with students from a graduate course in Business Information, from Polytechnic Institute of Porto, Portugal, a will be examined.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

No panorama socioeconómico atual, a contenção de despesas e o corte no financiamento de serviços secundários consumidores de recursos conduzem à reformulação de processos e métodos das instituições públicas, que procuram manter a qualidade de vida dos seus cidadãos através de programas que se mostrem mais eficientes e económicos. O crescimento sustentado das tecnologias móveis, em conjunção com o aparecimento de novos paradigmas de interação pessoa-máquina com recurso a sensores e sistemas conscientes do contexto, criaram oportunidades de negócio na área do desenvolvimento de aplicações com vertente cívica para indivíduos e empresas, sensibilizando-os para a disponibilização de serviços orientados ao cidadão. Estas oportunidades de negócio incitaram a equipa do projeto a desenvolver uma plataforma de notificação de problemas urbanos baseada no seu sistema de informação geográfico para entidades municipais. O objetivo principal desta investigação foca a idealização, conceção e implementação de uma solução completa de notificação de problemas urbanos de caráter não urgente, distinta da concorrência pela facilidade com que os cidadãos são capazes de reportar situações que condicionam o seu dia-a-dia. Para alcançar esta distinção da restante oferta, foram realizados diversos estudos para determinar características inovadoras a implementar, assim como todas as funcionalidades base expectáveis neste tipo de sistemas. Esses estudos determinaram a implementação de técnicas de demarcação manual das zonas problemáticas e reconhecimento automático do tipo de problema reportado nas imagens, ambas desenvolvidas no âmbito deste projeto. Para a correta implementação dos módulos de demarcação e reconhecimento de imagem, foram feitos levantamentos do estado da arte destas áreas, fundamentando a escolha de métodos e tecnologias a integrar no projeto. Neste contexto, serão apresentadas em detalhe as várias fases que constituíram o processo de desenvolvimento da plataforma, desde a fase de estudo e comparação de ferramentas, metodologias, e técnicas para cada um dos conceitos abordados, passando pela proposta de um modelo de resolução, até à descrição pormenorizada dos algoritmos implementados. Por último, é realizada uma avaliação de desempenho ao par algoritmo/classificador desenvolvido, através da definição de métricas que estimam o sucesso ou insucesso do classificador de objetos. A avaliação é feita com base num conjunto de imagens de teste, recolhidas manualmente em plataformas públicas de notificação de problemas, confrontando os resultados obtidos pelo algoritmo com os resultados esperados.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The smart grid concept is a key issue in the future power systems, namely at the distribution level, with deep concerns in the operation and planning of these systems. Several advantages and benefits for both technical and economic operation of the power system and of the electricity markets are recognized. The increasing integration of demand response and distributed generation resources, all of them mostly with small scale distributed characteristics, leads to the need of aggregating entities such as Virtual Power Players. The operation business models become more complex in the context of smart grid operation. Computational intelligence methods can be used to give a suitable solution for the resources scheduling problem considering the time constraints. This paper proposes a methodology for a joint dispatch of demand response and distributed generation to provide energy and reserve by a virtual power player that operates a distribution network. The optimal schedule minimizes the operation costs and it is obtained using a particle swarm optimization approach, which is compared with a deterministic approach used as reference methodology. The proposed method is applied to a 33-bus distribution network with 32 medium voltage consumers and 66 distributed generation units.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Demand response is an energy resource that has gained increasing importance in the context of competitive electricity markets and of smart grids. New business models and methods designed to integrate demand response in electricity markets and of smart grids have been published, reporting the need of additional work in this field. In order to adequately remunerate the participation of the consumers in demand response programs, improved consumers’ performance evaluation methods are needed. The methodology proposed in the present paper determines the characterization of the baseline approach that better fits the consumer historic consumption, in order to determine the expected consumption in absent of participation in a demand response event and then determine the actual consumption reduction. The defined baseline can then be used to better determine the remuneration of the consumer. The paper includes a case study with real data to illustrate the application of the proposed methodology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Electric power networks, namely distribution networks, have been suffering several changes during the last years due to changes in the power systems operation, towards the implementation of smart grids. Several approaches to the operation of the resources have been introduced, as the case of demand response, making use of the new capabilities of the smart grids. In the initial levels of the smart grids implementation reduced amounts of data are generated, namely consumption data. The methodology proposed in the present paper makes use of demand response consumers’ performance evaluation methods to determine the expected consumption for a given consumer. Then, potential commercial losses are identified using monthly historic consumption data. Real consumption data is used in the case study to demonstrate the application of the proposed method.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Esta tese descreve um projeto desenvolvido na sua maioria durante o segundo semestre do ano letivo 2013/2014 nas instalações da Bosch Security Systems ST em Ovar, uma empresa do Grupo Bosch. Este projeto resultou de uma cooperação existente entre a Avans University of Applied Sciences (AUAS) e o Instituto Superior de Engenharia do Porto (ISEP), bem como entre a fábrica Bosch ST Ovar e o Centro de Desenvolvimento Bosch situado em Eindhoven, Holanda. O objetivo é o estudo dos processos colaborativos de comunicação que se realizam entre a R&D (Research and Development/Centro de Desenvolvimento) e a MP (Manufacturing Plant/Fábrica). O sucesso das organizações empresariais só é possível se se alcançar a satisfação das expectativas do mercado. Assim, para o sucesso de uma empresa, temos de ter em conta a sua eficiência para conseguir obter o máximo rendimento da sua missão, que só é possível através de comunicações e de processos produtivos/serviços que acrescentem valor ao bem que disponibilizam. Tendo sempre em vista este princípio, o Grupo Bosch tem vindo a adotar metodologias com o intuito de eliminar os desperdícios existentes nos seus negócios aumentando o máximo possível os seus rendimentos. O desafio foi encontrar problemas ou dificuldades que levam com que a comunicação não seja realizada eficazmente, o que origina, na maioria dos casos, atrasos nos projetos realizados nesta parceria. Com a orientação do diretor técnico da fábrica e observando o trabalho realizado por 2 MBI’s (Manufacturing Business Interface), iniciou-se a compreensão do meio e os métodos de trabalho da empresa, a forma como é que é feita a parceria com os centros de desenvolvimento, como também as responsabilidades e funções de cada um. O estudo desenvolvido teve como base a metodologia Soft Systems Methodology com envolvimento de um questionário submetido aos colaboradores Bosch, realizando-se no final as sugestões de melhoria. Este relatório apresenta assim o estudo dos processos colaborativos e de comunicação entre a fábrica e o centro de desenvolvimento.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

O constante crescimento dos produtores em regime especial aliado à descentralização dos pontos injetores na rede, tem permitido uma redução da importação de energia mas também tem acarretado maiores problemas para a gestão da rede. Estes problemas estão relacionados com o facto da produção estar dependente das condições climatéricas, como é o caso dos produtores eólicos, hídricos e solares. A previsão da energia produzida em função da previsão das condições climatéricas tem sido alvo de atenção por parte da comunidade empresarial do setor, pelo facto de existir modelos razoáveis para a previsão das condições climatéricas a curto prazo, e até a longo prazo. Este trabalho trata, em concreto, do problema da previsão de produção em centrais mini-hídricas, apresentando duas propostas para essa previsão. Em ambas as propostas efetua-se inicialmente a previsão do caudal que chega à central, sendo esta depois convertida em potência que é injetada na rede. Para a previsão do caudal utilizaram-se dois métodos estatísticos: o método Holt-Winters e os modelos ARMAX. Os dois modelos de previsão propostos consideram um horizonte temporal de uma semana, com discretização horária, para uma central no norte de Portugal, designadamente a central de Penide. O trabalho também contempla um pequeno estudo da bibliografia existente tanto para a previsão da produção como de afluências de centrais hidroelétricas. Aborda, ainda, conceitos relacionados com as mini-hídricas e apresenta uma caraterização do parque de centrais mini-hídricas em Portugal.