24 resultados para time management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study analysed 22 strawberry and soil samples after their collection over the course of 2 years to compare the residue profiles from organic farming with integrated pest management practices in Portugal. For sample preparation, we used the citrate-buffered version of the quick, easy, cheap, effective, rugged, and safe (QuEChERS) method. We applied three different methods for analysis: (1) 27 pesticides were targeted using LC-MS/MS; (2) 143 were targeted using low pressure GC-tandem mass spectrometry (LP-GC-MS/MS); and (3) more than 600 pesticides were screened in a targeted and untargeted approach using comprehensive, two-dimensional gas chromatography time-of-flight mass spectrometry (GC × GC-TOF-MS). Comparison was made of the analyses using the different methods for the shared samples. The results were similar, thereby providing satisfactory confirmation of both similarly positive and negative findings. No pesticides were found in the organic-farmed samples. In samples from integrated pest management practices, nine pesticides were determined and confirmed to be present, ranging from 2 μg kg−1 for fluazifop-pbutyl to 50 μg kg−1 for fenpropathrin. Concentrations of residues in strawberries were less than European maximum residue limits.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

O presente trabalho de dissertação teve como objetivo a implementação de metodologias de Lean Management e avaliação do seu impacto no processo de Desenvolvimento de Produto. A abordagem utilizada consistiu em efetuar uma revisão da literatura e levantamento do Estado da Arte para obter a fundamentação teórica necessária à implementação de metodologias Lean. Prosseguiu com o levantamento da situação inicial da organização em estudo ao nível das atividades de desenvolvimento de produto, práticas de gestão documental e operacional e ainda de atividades de suporte através da realização de inquéritos e medições experimentais. Este conhecimento permitiu criar um modelo de referência para a implementação de Lean Management nesta área específica do desenvolvimento de produto. Após implementado, este modelo foi validado pela sua experimentação prática e recolha de indicadores. A implementação deste modelo de referência permitiu introduzir na Unidade de Desenvolvimento de Produto e Sistemas (DPS) da organização INEGI, as bases do pensamento Lean, contribuindo para a criação de um ambiente de Respeito pela Humanidade e de Melhoria Contínua. Neste ambiente foi possível obter ganhos qualitativos e quantitativos nas várias áreas em estudo, contribuindo de forma global para um aumento da eficiência e eficácia da DPS. Prevê-se que este aumento de eficiência represente um aumento da capacidade instalada na Organização, pela redução anual de 2290 horas de desperdício (6.5% da capacidade total da unidade) e pela redução significativa em custos operacionais. Algumas das implementações de melhoria propostas no decorrer deste trabalho, após verificado o seu sucesso, extravasaram a unidade em estudo e foram aplicadas transversalmente à da organização. Foram também obtidos ganhos qualitativos, tais como a normalização de práticas de gestão documental e a centralização e agilização de fluxos de informação. Isso permitiu um aumento de qualidade dos serviços prestados pela redução de correções e retrabalho. Adicionalmente, com o desenvolvimento de uma nova ferramenta que permite a monitorização do estado atual dos projetos a nível da sua percentagem de execução (cumprimento de objetivos), prazos e custos, bem como a estimação das datas de conclusão dos projetos possibilitando o replaneamento do projeto bem como a detecção atempada de desvios. A ferramenta permite também a criação de um histórico que identifica o esforço horário associado à realização das atividades/tarefas das várias áreas de Desenvolvimento de Produto e desta forma pode ser usada como suporte à orçamentação futura de atividades similares. No decorrer do projeto, foram também criados os mecanismos que permitem o cálculo de indicadores das competências técnicas e motivações intrínsecas individuais da equipa DPS. Estes indicadores podem ser usados na definição por parte dos gestores dos projetos da composição das equipas de trabalho, dos executantes de tarefas individuais do projeto e dos destinatários de ações de formação. Com esta informação é expectável que se consiga um maior aproveitamento do potencial humano e como consequência um aumento do desempenho e da satisfação pessoal dos recursos humanos da organização. Este caso de estudo veio demonstrar que o potencial de melhoria dos processos associados ao desenvolvimento de produto através de metodologias de Lean Management é muito significativo, e que estes resultam em ganhos visíveis para a organização bem como para os seus elementos individualmente.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The implementation of smart homes allows the domestic consumer to be an active player in the context of the Smart Grid (SG). This paper presents an intelligent house management system that is being developed by the authors to manage, in real time, the power consumption, the micro generation system, the charge and discharge of the electric or plug-in hybrid vehicles, and the participation in Demand Response (DR) programs. The paper proposes a method for the energy efficiency analysis of a domestic consumer using the SCADA House Intelligent Management (SHIM) system. The main goal of the present paper is to demonstrate the economic benefits of the implemented method. The case study considers the consumption data of some real cases of Portuguese house consumption over 30 days of June of 2012, the Portuguese real energy price, the implementation of the power limits at different times of the day and the economic benefits analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Demand response concept has been gaining increasing importance while the success of several recent implementations makes this resource benefits unquestionable. This happens in a power systems operation environment that also considers an intensive use of distributed generation. However, more adequate approaches and models are needed in order to address the small size consumers and producers aggregation, while taking into account these resources goals. The present paper focuses on the demand response programs and distributed generation resources management by a Virtual Power Player that optimally aims to minimize its operation costs taking the consumption shifting constraints into account. The impact of the consumption shifting in the distributed generation resources schedule is also considered. The methodology is applied to three scenarios based on 218 consumers and 4 types of distributed generation, in a time frame of 96 periods.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The use of Electric Vehicles (EVs) will change significantly the planning and management of power systems in a near future. This paper proposes a real-time tariff strategy for the charge process of the EVs. The main objective is to evaluate the influence of real-time tariffs in the EVs owners’ behaviour and also the impact in load diagram. The paper proposes the energy price variation according to the relation between wind generation and power consumption. The proposed strategy was tested in two different days in the Danish power system. January 31st and August 13th 2013 were selected because of the high quantities of wind generation. The main goal is to evaluate the changes in the EVs charging diagram with the energy price preventing wind curtailment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Energy resource scheduling is becoming increasingly important, such as the use of more distributed generators and electric vehicles connected to the distribution network. This paper proposes a methodology to be used by Virtual Power Players (VPPs), regarding the energy resource scheduling in smart grids and considering day-ahead, hour-ahead and realtime time horizons. This method considers that energy resources are managed by a VPP which establishes contracts with their owners. The full AC power flow calculation included in the model takes into account network constraints. In this paper, distribution function errors are used to simulate variations between time horizons, and to measure the performance of the proposed methodology. A 33-bus distribution network with large number of distributed resources is used.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The recent changes on power systems paradigm requires the active participation of small and medium players in energy management. With an electricity price fluctuation these players must manage the consumption. Lowering costs and ensuring adequate user comfort levels. Demand response can improve the power system management and bring benefits for the small and medium players. The work presented in this paper, which is developed aiming the smart grid context, can also be used in the current power system paradigm. The proposed system is the combination of several fields of research, namely multi-agent systems and artificial neural networks. This system is physically implemented in our laboratories and it is used daily by researchers. The physical implementation gives the system an improvement in the proof of concept, distancing itself from the conventional systems. This paper presents a case study illustrating the simulation of real-time pricing in a laboratory.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many-core platforms are an emerging technology in the real-time embedded domain. These devices offer various options for power savings, cost reductions and contribute to the overall system flexibility, however, issues such as unpredictability, scalability and analysis pessimism are serious challenges to their integration into the aforementioned area. The focus of this work is on many-core platforms using a limited migrative model (LMM). LMM is an approach based on the fundamental concepts of the multi-kernel paradigm, which is a promising step towards scalable and predictable many-cores. In this work, we formulate the problem of real-time application mapping on a many-core platform using LMM, and propose a three-stage method to solve it. An extended version of the existing analysis is used to assure that derived mappings (i) guarantee the fulfilment of timing constraints posed on worst-case communication delays of individual applications, and (ii) provide an environment to perform load balancing for e.g. energy/thermal management, fault tolerance and/or performance reasons.