23 resultados para team experience


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the past few years we have witnessed astonishing developments on distance learning tools, in particular on Open Educational Resources (OER) such as Massive Open Online Courses (MOOC). In this paper we present the “Mathematics without STRESS”, a MOOC Project, which has been a collaborative volunteer effort that brought together professors, from four schools of the Polytechnic Institute of Oporto (IPP), in Portugal. Some concepts directly associated with MOOC and their quickly growing popularity are complemented with a discussion of some particular MOOC characterizations. The design process of this project is revealed by focusing on the MOOC structure we used, as well as on the several types of course materials that were produced. At last, we undertake a short discussion about some of the problems, achievements and challenges met throughout this project development, giving a special attention to the motivational aim of this work - hoping to contribute to a change in the way of teaching and learning Mathematics is seen and practiced nowadays.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

O presente Relatório de estágio enquadra-se no âmbito da disciplina de Dissertação / Projeto / Estágio, do Curso de Mestrado em Engenharia Civil, do Instituto Superior de Engenharia do Porto subordinado ao tema “Gestão de Obras: Aplicação prática em ambiente empresarial”. O estágio foi realizado na empresa NEGRO S.A., empresa que atua no mercado Francês, no sector da construção civil no âmbito de obras públicas e privadas. Foi com grande satisfação que o estagiário abraçou esta oportunidade de poder realizar um estágio neste setor da engenharia civil, integrando uma equipa de trabalho com uma ampla experiência no mercado. Foi igualmente gratificante poder aplicar os conhecimentos adquiridos ao longo do curso e enriquecedor adquirir novas competências, através da resolução das dificuldades ocorridas no dia-a-dia durante o estágio. Considera-se assim esta experiencia como uma mais-valia para ingressar com êxito na futura vida profissional. Este documento descreve essencialmente as tarefas realizadas ao longo do estágio. Estas tarefas foram executadas recorrendo aos conhecimentos adquiridos durante a formação académica, nomeadamente no que se refere a planeamento, qualidade, gestão de obra e segurança e saúde no trabalho e com finalidade de alcançar os seguintes objetivos: - Proporcionar a integração do aluno no ambiente empresarial, realizando as atividades planeadas; - Propiciar a aplicação dos conhecimentos e competências adquiridas ao longo do curso, utilizando os casos reais durante o estágio; - Resolver problemas concretos de engenharia civil em meio profissional e empresarial; - Proceder a recolha de informação com vista a resolução dos problemas que surgem ao longo do estágio; - Analisar as situações que surgem durante a realização do estágio, estabelecendo conclusões; - Desenvolver metodologias aplicáveis no contexto do estágio; - Recolher dados e interpretar os mesmos no contexto do estágio; - Estabelecer conclusões sobre as experiências vividas durante o estágio; - Analisar o impacto do trabalho realizado na instituição de acolhimento.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The goal of this EPS@ISEP project proposed in the Spring of 2014 was to develop a flapping wing flying robot. The project was embraced by a multinational team composed of four students from different countries and fields of study. The team designed and implemented a robot inspired by a biplane design, constructed from lightweight materials and battery powered. The prototype, called MyBird, was built with a 250 € budget, reuse existing materials as well as low cost solutions. Although the team's initial idea was to build a light radio controlled robot, time limitations along with setbacks involving the required electrical components led to a light but not radio controlled prototype. The team, from the experience gathered, made a number of future improvement suggestions, namely, the addition of radio control and a camera and the adoption of articulated monoplane design instead of the current biplane design for the wings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Proceedings of the 10th Mediterranean Conference on Control and Automation - MED2002 Lisbon, Portugal, July 9-12, 2002

Relevância:

20.00% 20.00%

Publicador:

Resumo:

International Conference on Advanced Robotics, Coimbra, Portugal, Julho 2003

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Proceedings of the Scientific Meeting of the Portuguese Robotics Open 2004

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dadas as condições actuais do mercado de trabalho, o conhecimento empírico é cada vez mais um factor distintivo na carteira de habilitações de um engenheiro recém-graduado. Desta forma, a possibilidade de realização de um estágio em ambiente empresarial ganha toda uma nova dimensão no panorama académico, apresentando-se como uma excelente oportunidade de obtenção de experiência e conhecimento de causa num momento imediatamente anterior à saída da universidade e à entrada no mundo profissional. Neste âmbito, apresenta-se o presente relatório, referente ao estágio desenvolvido sob alçada da empresa Electrolinhas S. A. durante a construção do Parque Eólico do Pisco. Este estágio enquadra-se no 2º Ano do Mestrado em Engenharia Civil – ramo de Infraestruturas, do departamento de Engenharia Civil do Instituto Superior de Engenharia do Porto. Ao longo de 6 meses, de Fevereiro a Julho de 2015, foi possível acompanhar o desenrolar da obra de construção de um parque eólico, da perspectiva da fiscalização. Este estágio tem especial interesse dado tratar-se de uma obra de grande dimensão, com diversas particularidades ao nível do planeamento e da execução, descritas ao longo dos próximos capítulos.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A manutenção é uma área extremamente importante, principalmente na indústria. Devidamente organizada, permitirá um fluxo produtivo devidamente planeado e executado, que permitirá a qualquer empresa manter o nível de facturação desejado e o prazo de entrega acordado com os clientes. De outra forma, poderá originar o caos. No entanto, os desafios de gestão da produção mais correntes, nomeadamente através do Lean Manufacturing, passam a exigir um pouco mais do que uma simples manutenção. Torna-se obrigatório fazer análises económicas que permitam averiguar quando cada equipamento passa a exigir custos de manutenção excessivos, os quais poderão obrigar a um recondicionamento mais acentuado do equipamento, o qual pode passar inclusivamente por uma melhoria da sua performance. Nestes casos, terá que existir uma “cumplicidade” entre a Direcção de Produção e a Manutenção, no sentido de averiguar o melhor momento para proceder a uma melhoria do equipamento, numa perspectiva de funcionamento global em linha de produção, adaptando-o à performance que será exigida ao conjunto. Neste domínio, o Projecto passa a prestar um serviço valiosíssimo à empresa, integrando-se no conjunto Produção + Manutenção, criando valor na intervenção, através do desenvolvimento de um trabalho que permite não só repor o estado natural da produção, mas sim promover uma melhoria sustentada da mesma. Este trabalho pretende reflectir e avaliar a relevância do Projecto neste tipo de operações, contribuindo de uma forma sistemática e sustentada para a melhoria contínua dos processos de fabrico. É apresentado um caso de estudo que pretende validar todo o desenvolvimento anteriormente realizado na matéria.