30 resultados para plug-in hybrid electric vehicles


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper proposes an energy resources management methodology based on three distinct time horizons: day-ahead scheduling, hour-ahead scheduling, and real-time scheduling. In each scheduling process it is necessary the update of generation and consumption operation and of the storage and electric vehicles storage status. Besides the new operation condition, it is important more accurate forecast values of wind generation and of consumption using results of in short-term and very short-term methods. A case study considering a distribution network with intensive use of distributed generation and electric vehicles is presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years the use of several new resources in power systems, such as distributed generation, demand response and more recently electric vehicles, has significantly increased. Power systems aim at lowering operational costs, requiring an adequate energy resources management. In this context, load consumption management plays an important role, being necessary to use optimization strategies to adjust the consumption to the supply profile. These optimization strategies can be integrated in demand response programs. The control of the energy consumption of an intelligent house has the objective of optimizing the load consumption. This paper presents a genetic algorithm approach to manage the consumption of a residential house making use of a SCADA system developed by the authors. Consumption management is done reducing or curtailing loads to keep the power consumption in, or below, a specified energy consumption limit. This limit is determined according to the consumer strategy and taking into account the renewable based micro generation, energy price, supplier solicitations, and consumers’ preferences. The proposed approach is compared with a mixed integer non-linear approach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The concept of demand response has a growing importance in the context of the future power systems. Demand response can be seen as a resource like distributed generation, storage, electric vehicles, etc. All these resources require the existence of an infrastructure able to give players the means to operate and use them in an efficient way. This infrastructure implements in practice the smart grid concept, and should accommodate a large number of diverse types of players in the context of a competitive business environment. In this paper, demand response is optimally scheduled jointly with other resources such as distributed generation units and the energy provided by the electricity market, minimizing the operation costs from the point of view of a virtual power player, who manages these resources and supplies the aggregated consumers. The optimal schedule is obtained using two approaches based on particle swarm optimization (with and without mutation) which are compared with a deterministic approach that is used as a reference methodology. A case study with two scenarios implemented in DemSi, a demand Response simulator developed by the authors, evidences the advantages of the use of the proposed particle swarm approaches.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a modified Particle Swarm Optimization (PSO) methodology to solve the problem of energy resources management with high penetration of distributed generation and Electric Vehicles (EVs) with gridable capability (V2G). The objective of the day-ahead scheduling problem in this work is to minimize operation costs, namely energy costs, regarding he management of these resources in the smart grid context. The modifications applied to the PSO aimed to improve its adequacy to solve the mentioned problem. The proposed Application Specific Modified Particle Swarm Optimization (ASMPSO) includes an intelligent mechanism to adjust velocity limits during the search process, as well as self-parameterization of PSO parameters making it more user-independent. It presents better robustness and convergence characteristics compared with the tested PSO variants as well as better constraint handling. This enables its use for addressing real world large-scale problems in much shorter times than the deterministic methods, providing system operators with adequate decision support and achieving efficient resource scheduling, even when a significant number of alternative scenarios should be considered. The paper includes two realistic case studies with different penetration of gridable vehicles (1000 and 2000). The proposed methodology is about 2600 times faster than Mixed-Integer Non-Linear Programming (MINLP) reference technique, reducing the time required from 25 h to 36 s for the scenario with 2000 vehicles, with about one percent of difference in the objective function cost value.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a modified Particle Swarm Optimization (PSO) methodology to solve the problem of energy resources management with high penetration of distributed generation and Electric Vehicles (EVs) with gridable capability (V2G). The objective of the day-ahead scheduling problem in this work is to minimize operation costs, namely energy costs, regarding the management of these resources in the smart grid context. The modifications applied to the PSO aimed to improve its adequacy to solve the mentioned problem. The proposed Application Specific Modified Particle Swarm Optimization (ASMPSO) includes an intelligent mechanism to adjust velocity limits during the search process, as well as self-parameterization of PSO parameters making it more user-independent. It presents better robustness and convergence characteristics compared with the tested PSO variants as well as better constraint handling. This enables its use for addressing real world large-scale problems in much shorter times than the deterministic methods, providing system operators with adequate decision support and achieving efficient resource scheduling, even when a significant number of alternative scenarios should be considered. The paper includes two realistic case studies with different penetration of gridable vehicles (1000 and 2000). The proposed methodology is about 2600 times faster than Mixed-Integer Non-Linear Programming (MINLP) reference technique, reducing the time required from 25 h to 36 s for the scenario with 2000 vehicles, with about one percent of difference in the objective function cost value.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents the first phase of the redevelopment of the Electric Vehicle Scenario Simulator (EVeSSi) tool. A new methodology to generate traffic demand scenarios for the Simulation of Urban MObility (SUMO) tool for urban traffic simulation is described. This methodology is based on a Portugal census database to generate a synthetic population for a given area under study. A realistic case study of a Portuguese city, Vila Real, is assessed. For this area the road network was created along with a synthetic population and public transport. The traffic results were obtained and an electric buses fleet was evaluated assuming that the actual fleet would be replaced in a near future. The energy requirements to charge the electric fleet overnight were estimated in order to evaluate the impacts that it would cause in the local electricity network.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Energy resource scheduling is becoming increasingly important, such as the use of more distributed generators and electric vehicles connected to the distribution network. This paper proposes a methodology to be used by Virtual Power Players (VPPs), regarding the energy resource scheduling in smart grids and considering day-ahead, hour-ahead and realtime time horizons. This method considers that energy resources are managed by a VPP which establishes contracts with their owners. The full AC power flow calculation included in the model takes into account network constraints. In this paper, distribution function errors are used to simulate variations between time horizons, and to measure the performance of the proposed methodology. A 33-bus distribution network with large number of distributed resources is used.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Os combustíveis fósseis, como o carvão, o petróleo e o gás, constituem fontes de energia que em breve se esgotarão e que são demasiado caras para serem desperdiçadas pelas centrais elétricas na produção de electricidade. Para além desse facto, existem outros argumentos (sobretudo económicos) que inviabilizam a utilização destas fontes de energia em algumas regiões, abrindo caminho a fontes de energia alternativas (e.g. solar, eólica, biomassa, mini-hídricas, geotérmicas, etc) e preferencialmente com contornos locais. No caso particular de Moçambique, tem-se verificado um interesse crescente por parte do governo e de várias ONGs na promoção do uso de energias alternativas para as zonas onde a energia convencional não chega e não chegará, devido aos custos muito elevados que esse processo acarretaria. Esta dissertação apresenta um estudo aprofundado do dimensionamento dum sistema híbrido de geração de energia elétrica envolvendo gerador FV e grupo eletrogéneo de emergência para a Escola Rural da Nangade, situada no Distrito de Nangade, na Província do Cabo Delgado. São também descritos os diversos componentes e as tecnologias associadas a um sistema deste género, com a inclusão de sistemas inteligentes de controlo de energia com a utilização de inversores bidireccionais (inversores de bateria e carregadores) para sistemas isolados. Os resultados são apresentados de forma a facilitar a aplicação e montagem deste tipo de sistemas in loco. Espera-se que esta dissertação possa servir de base no futuro próximo, para a implementação deste tipo de sistemas para permitir a melhoria da qualidade de ensino através de melhores infraestruturas, democratizando desta forma o acesso à educação para as crianças das zonas rurais das várias províncias de Moçambique. Como as energias renováveis são parte integrante do Sistema Elétrico Nacional, apresenta-se resumidamente, no anexo 17, o “Plano de Desenvolvimento na Área de Energia de Moçambique”.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Smart Grids (SGs) have emerged as the new paradigm for power system operation and management, being designed to include large amounts of distributed energy resources. This new paradigm requires new Energy Resource Management (ERM) methodologies considering different operation strategies and the existence of new management players such as several types of aggregators. This paper proposes a methodology to facilitate the coalition between distributed generation units originating Virtual Power Players (VPP) considering a game theory approach. The proposed approach consists in the analysis of the classifications that were attributed by each VPP to the distributed generation units, as well as in the analysis of the previous established contracts by each player. The proposed classification model is based in fourteen parameters including technical, economical and behavioural ones. Depending of the VPP strategies, size and goals, each parameter has different importance. VPP can also manage other type of energy resources, like storage units, electric vehicles, demand response programs or even parts of the MV and LV distribution network. A case study with twelve VPPs with different characteristics and one hundred and fifty real distributed generation units is included in the paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A liberalização dos mercados de energia elétrica e a crescente integração dos recursos energéticos distribuídos nas redes de distribuição, nomeadamente as unidades de produção distribuída, os sistemas de controlo de cargas através dos programas de demand response, os sistemas de armazenamento e os veículos elétricos, representaram uma evolução no paradigma de operação e gestão dos sistemas elétricos. Este novo paradigma de operação impõe o desenvolvimento de novas metodologias de gestão e controlo que permitam a integração de todas as novas tecnologias de forma eficiente e sustentável. O principal contributo deste trabalho reside no desenvolvimento de metodologias para a gestão de recursos energéticos no contexto de redes inteligentes, que contemplam três horizontes temporais distintos (24 horas, 1 hora e 5 minutos). As metodologias consideram os escalonamentos anteriores assim como as previsões atualizadas de forma a melhorar o desempenho total do sistema e consequentemente aumentar a rentabilidade dos agentes agregadores. As metodologias propostas foram integradas numa ferramenta de simulação, que servirá de apoio à decisão de uma entidade agregadora designada por virtual power player. Ao nível das metodologias desenvolvidas são propostos três algoritmos de gestão distintos, nomeadamente para a segunda (1 hora) e terceira fase (5 minutos) da ferramenta de gestão, diferenciados pela influência que os períodos antecedentes e seguintes têm no período em escalonamento. Outro aspeto relevante apresentado neste documento é o teste e a validação dos modelos propostos numa plataforma de simulação comercial. Para além das metodologias propostas, a aplicação permitiu validar os modelos dos equipamentos considerados, nomeadamente, ao nível das redes de distribuição e dos recursos energéticos distribuidos. Nesta dissertação são apresentados três casos de estudos, cada um com diferentes cenários referentes a cenários de operação futuros. Estes casos de estudos são importantes para verificar a viabilidade da implementação das metodologias e algoritmos propostos. Adicionalmente são apresentadas comparações das metodologias propostas relativamente aos resultados obtidos, complexidade de gestão em ambiente de simulação para as diferentes fases da ferramenta proposta e os benefícios e inconvenientes no uso da ferramenta proposta.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

PM motors are suitable for nearly all applications, like pumps, elevators, compressors, blowers, extruders, generators, electric vehicles, servodrives, cooling towers, household appliances, etc. This paper will present some applications where the use of PM motors allowed for enhancements in energy efficiency and process quality.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent decades, all over the world, competition in the electric power sector has deeply changed the way this sector’s agents play their roles. In most countries, electric process deregulation was conducted in stages, beginning with the clients of higher voltage levels and with larger electricity consumption, and later extended to all electrical consumers. The sector liberalization and the operation of competitive electricity markets were expected to lower prices and improve quality of service, leading to greater consumer satisfaction. Transmission and distribution remain noncompetitive business areas, due to the large infrastructure investments required. However, the industry has yet to clearly establish the best business model for transmission in a competitive environment. After generation, the electricity needs to be delivered to the electrical system nodes where demand requires it, taking into consideration transmission constraints and electrical losses. If the amount of power flowing through a certain line is close to or surpasses the safety limits, then cheap but distant generation might have to be replaced by more expensive closer generation to reduce the exceeded power flows. In a congested area, the optimal price of electricity rises to the marginal cost of the local generation or to the level needed to ration demand to the amount of available electricity. Even without congestion, some power will be lost in the transmission system through heat dissipation, so prices reflect that it is more expensive to supply electricity at the far end of a heavily loaded line than close to an electric power generation. Locational marginal pricing (LMP), resulting from bidding competition, represents electrical and economical values at nodes or in areas that may provide economical indicator signals to the market agents. This article proposes a data-mining-based methodology that helps characterize zonal prices in real power transmission networks. To test our methodology, we used an LMP database from the California Independent System Operator for 2009 to identify economical zones. (CAISO is a nonprofit public benefit corporation charged with operating the majority of California’s high-voltage wholesale power grid.) To group the buses into typical classes that represent a set of buses with the approximate LMP value, we used two-step and k-means clustering algorithms. By analyzing the various LMP components, our goal was to extract knowledge to support the ISO in investment and network-expansion planning.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A tese de mestrado teve como objetivo o estudo e análise do funcionamento das centrais de cogeração e térmica da fábrica da Unicer em Leça do Balio, com o intuito de melhorar a sua eficiência, propondo alterações processuais. O trabalho realizado consistiu no reconhecimento das instalações, seguido da formulação e resolução dos balanços de energia globais. Com o acompanhamento diário do funcionamento foi possível propor melhorias sem custos que se revelaram muito benéficas, registando-se um aumento nas recuperações térmicas e por consequência no Rendimento Elétrico Equivalente (R.E.E.), na eficiência da instalação da cogeração e da central térmica. Na cogeração registou-se um aumento de 36,2% na potência recuperada em água quente, aproximadamente 600 kW, sendo já superior à prevista pelo projeto. Na caldeira recuperativa registou-se um ligeiro aumento de 4,0% na potência recuperada. Deste modo o rendimento térmico da central aumentou 6,4%, atingindo os 40,8% e superando os 40,4% projetados. O rendimento global final foi de 83,1% o que representa um aumento de 6,3%. O R.E.E. em Maio de 2014 foi de 76,3%, superior ao valor em Junho de 2013 em 8,7%. Tendo como referência o valor alvo de 70,5% para o R.E.E. apontado no início do estágio, nos últimos 8 meses o seu valor tem sido sempre superior e em crescimento. Existe ainda a possibilidade de aproveitar a energia térmica de baixa temperatura que está a ser dissipada numa torre de arrefecimento, no mínimo 40 kW, num investimento com um período de retorno de investimento máximo de 8,1 meses. Na central térmica registou-se um aumento do rendimento para a mesma quantidade de energia produzida na central, pois esta é a principal variável do processo. Em 2014 a produção de energia apresentou um valor inferior a 2013, 6,9%, e a eficiência registou um acréscimo de 2,0%. A incorporação de biogás na alimentação de combustível à caldeira bifuel não pareceu comprometer significativamente a eficiência da central térmica, pelo que a sua utilização é benéfica. Com o aumento das recuperações térmicas na central de cogeração foram estimadas poupanças de gás natural equivalentes a 3,3 GWh, o que significa 120.680€ economizados nos últimos 11 meses do trabalho. É esperado uma poupança de 18.000€ mensais com a melhoria do funcionamento obtida nas duas centrais.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Atualmente existe uma grande variedade de programas de cálculo automático de estruturas de betão armado disponíveis no mercado, pois estes, cada vez mais, são inerentes ao desenvolvimento de cada projeto de estruturas. O PAC-Pórticos foi um dos primeiros a chegar ao mercado nacional surgindo no início da década de noventa. Foi totalmente desenvolvido em Portugal, tendo tido bastante sucesso nas suas vendas a nível nacional. O PAC-Pórticos não está preparado para operar diretamente nos mais recentes sistemas operativos nem foi programado para dimensionar os diversos elementos de betão armado seguindo os termos das normas mais recentes (Eurocódigos). O tema do presente trabalho vai de encontro aos atuais problemas do programa, assim sendo, definiu-se como primeiro objetivo a adaptação do PAC-Pórticos à regulamentação europeia para o betão armado. Numa 1ª fase, para a adaptação do PAC-Pórticos aos novos códigos, foi necessário estudar o programa em si, perceber o seu funcionamento e posteriormente realizar uma comparação entre a legislação para qual o software está programado, o Regulamento de Estruturas de Betão Armado e Pré-Esforçado (ainda em vigor) e a Norma Europeia correspondente a EN 1992-1-1 (Eurocódigo 2). Seguidamente, procedeu-se ao estudo e adaptação de todas as sub-rotinas de cálculo do PAC-Pórticos para o dimensionamento de vigas e pilares, tendo finalmente sido testado o novo código e comprovados os resultados obtidos com o mesmo. Na realização do presente trabalho, não foi ignorada a importância crescente da metodologia BIM que, nos dias de hoje, tende a ser implementada nos programas de cálculo de engenharia civil. Neste âmbito, o segundo objetivo é o de conseguir visualizar uma solução obtida do PAC-Pórticos numa qualquer ferramenta tridimensional BIM. Para tal, foram ponderadas várias hipóteses, mas optou-se por criar dois plug-in para o programa AutoCAD da Autodesk. O primeiro destes plug-in contempla o desenho das vigas e o segundo para os pilares, ambos em 3D e elaborados de forma automática.