25 resultados para Installment schedule


Relevância:

10.00% 10.00%

Publicador:

Resumo:

A new algorithm is proposed for scheduling preemptible arbitrary-deadline sporadic task systems upon multiprocessor platforms, with interprocessor migration permitted. This algorithm is based on a task-splitting approach - while most tasks are entirely assigned to specific processors, a few tasks (fewer than the number of processors) may be split across two processors. This algorithm can be used for two distinct purposes: for actually scheduling specific sporadic task systems, and for feasibility analysis. Simulation- based evaluation indicates that this algorithm offers a significant improvement on the ability to schedule arbitrary- deadline sporadic task systems as compared to the contemporary state-of-art. With regard to feasibility analysis, the new algorithm is proved to offer superior performance guarantees in comparison to prior feasibility tests.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mestrado em Ensino Precoce do Inglês

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, we consider a Cournot competition between a nonprofit firm and a for-profit firm in a homogeneous goods market, with uncertain demand. Given an asymmetric tax schedule, we compute explicitly the Bayesian-Nash equilibrium. Furthermore, we analyze the effects of the tax rate and the degree of altruistic preference on market equilibrium outcomes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The smart grid concept is a key issue in the future power systems, namely at the distribution level, with deep concerns in the operation and planning of these systems. Several advantages and benefits for both technical and economic operation of the power system and of the electricity markets are recognized. The increasing integration of demand response and distributed generation resources, all of them mostly with small scale distributed characteristics, leads to the need of aggregating entities such as Virtual Power Players. The operation business models become more complex in the context of smart grid operation. Computational intelligence methods can be used to give a suitable solution for the resources scheduling problem considering the time constraints. This paper proposes a methodology for a joint dispatch of demand response and distributed generation to provide energy and reserve by a virtual power player that operates a distribution network. The optimal schedule minimizes the operation costs and it is obtained using a particle swarm optimization approach, which is compared with a deterministic approach used as reference methodology. The proposed method is applied to a 33-bus distribution network with 32 medium voltage consumers and 66 distributed generation units.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Demand response concept has been gaining increasing importance while the success of several recent implementations makes this resource benefits unquestionable. This happens in a power systems operation environment that also considers an intensive use of distributed generation. However, more adequate approaches and models are needed in order to address the small size consumers and producers aggregation, while taking into account these resources goals. The present paper focuses on the demand response programs and distributed generation resources management by a Virtual Power Player that optimally aims to minimize its operation costs taking the consumption shifting constraints into account. The impact of the consumption shifting in the distributed generation resources schedule is also considered. The methodology is applied to three scenarios based on 218 consumers and 4 types of distributed generation, in a time frame of 96 periods.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Recent changes of paradigm in power systems opened the opportunity to the active participation of new players. The small and medium players gain new opportunities while participating in demand response programs. This paper explores the optimal resources scheduling in two distinct levels. First, the network operator facing large wind power variations makes use of real time pricing to induce consumers to meet wind power variations. Then, at the consumer level, each load is managed according to the consumer preferences. The two-level resources schedule has been implemented in a real-time simulation platform, which uses hardware for consumer’ loads control. The illustrative example includes a situation of large lack of wind power and focuses on a consumer with 18 loads.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Objectives To evaluate the feasibility and acceptability of an exergame intervention as a tool to promote physical activity in outpatients with schizophrenia. Design Feasibility/Acceptability Study and Quasi-Experimental Trial. Method Sixteen outpatients with schizophrenia received treatment as usual and they all completed an 8-week exergame intervention using Microsoft Kinect® (20 min sessions, biweekly). Participants completed pre and post treatment assessments regarding functional mobility (Timed Up and Go Test), functional fitness performance (Senior Fitness Test), motor neurological soft signs (Brief Motor Scale), hand grip strength (digital dynamometer), static balance (force plate), speed of processing (Trail Making Test), schizophrenia-related symptoms (Positive and Negative Syndrome Scale) and functioning (Personal and Social Performance Scale). The EG group completed an acceptability questionnaire after the intervention. Results Attrition rate was 18.75% and 69.23% of the participants completed the intervention within the proposed schedule. Baseline clinical traits were not related to game performance indicators. Over 90% of the participants rated the intervention as satisfactory and interactive. Most participants (76.9%) agreed that this intervention promotes healthier lifestyles and is an acceptable alternative to perform physical activity. Repeated-measures MANOVA analyses found no significant multivariate effects for combined outcomes. Conclusion This study established the feasibility and acceptability of an exergame intervention for outpatients with schizophrenia. The intervention proved to be an appealing alternative to physical activity. Future trials should include larger sample sizes, explore patients' adherence to home-based exergames and consider greater intervention dosage (length, session duration, and/or frequency) in order to achieve potential effects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A liberalização dos mercados de energia elétrica e a crescente integração dos recursos energéticos distribuídos nas redes de distribuição, nomeadamente as unidades de produção distribuída, os sistemas de controlo de cargas através dos programas de demand response, os sistemas de armazenamento e os veículos elétricos, representaram uma evolução no paradigma de operação e gestão dos sistemas elétricos. Este novo paradigma de operação impõe o desenvolvimento de novas metodologias de gestão e controlo que permitam a integração de todas as novas tecnologias de forma eficiente e sustentável. O principal contributo deste trabalho reside no desenvolvimento de metodologias para a gestão de recursos energéticos no contexto de redes inteligentes, que contemplam três horizontes temporais distintos (24 horas, 1 hora e 5 minutos). As metodologias consideram os escalonamentos anteriores assim como as previsões atualizadas de forma a melhorar o desempenho total do sistema e consequentemente aumentar a rentabilidade dos agentes agregadores. As metodologias propostas foram integradas numa ferramenta de simulação, que servirá de apoio à decisão de uma entidade agregadora designada por virtual power player. Ao nível das metodologias desenvolvidas são propostos três algoritmos de gestão distintos, nomeadamente para a segunda (1 hora) e terceira fase (5 minutos) da ferramenta de gestão, diferenciados pela influência que os períodos antecedentes e seguintes têm no período em escalonamento. Outro aspeto relevante apresentado neste documento é o teste e a validação dos modelos propostos numa plataforma de simulação comercial. Para além das metodologias propostas, a aplicação permitiu validar os modelos dos equipamentos considerados, nomeadamente, ao nível das redes de distribuição e dos recursos energéticos distribuidos. Nesta dissertação são apresentados três casos de estudos, cada um com diferentes cenários referentes a cenários de operação futuros. Estes casos de estudos são importantes para verificar a viabilidade da implementação das metodologias e algoritmos propostos. Adicionalmente são apresentadas comparações das metodologias propostas relativamente aos resultados obtidos, complexidade de gestão em ambiente de simulação para as diferentes fases da ferramenta proposta e os benefícios e inconvenientes no uso da ferramenta proposta.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Este relatório diz respeito ao trabalho desenvolvido em ambiente de estágio curricular na construção de um empreendimento comercial na zona de Oeiras, compreendendo a construção de um edifício, infra-estruturas enterradas e arranjos exteriores. O estágio foi realizado na Volare – Gestão de Projectos, S.A., empresa dedicada à execução de obras de construção civil destinadas ao grupo Ibersol. Embora todas as áreas de gestão abordadas no estudo sejam de extrema importância, as áreas de gestão do custo, gestão das compras e gestão do tempo revelam-se ainda extremamente valorizadas pelas empresas de construção – o que faz com continuem a existir derrapagens orçamentais e incumprimento de prazos. Só uma gestão rigorosa, eficiente e capaz de abraçar todas as áreas de conhecimentos abordadas, tornará possível alcançar os patamares de satisfação das empresas e dos clientes. O presente relatório mostra que o gestor de obras deve possuir grande capacidade de liderança, de comunicação e negociação O objectivo deste relatório, para além da descrição de todos os trabalhos práticos de execução da obra, é de transcrever os conhecimentos aplicados ao longo do estágio, nomeadamente no que concerne aos dos processos de ‘Gestão, Coordenação e Planeamento’, directamente ligados as funções da ‘Direcção Técnica de Obra’ durante toda a fase de execução da empreitada, estando o principal foco na descrição das actividades referentes ao controlo da obra.