15 resultados para economic constraints
em Repositório Científico do Instituto Politécnico de Lisboa - Portugal
Resumo:
We write down the renormalization-group equations for the Yukawa-coupling matrices in a general multi-Higgs-doublet model. We then assume that the matrices of the Yukawa couplings of the various Higgs doublets to right-handed fermions of fixed quantum numbers are all proportional to each other. We demonstrate that, in the case of the two-Higgs-doublet model, this proportionality is preserved by the renormalization-group running only in the cases of the standard type-I, II, X, and Y models. We furthermore show that a similar result holds even when there are more than two Higgs doublets: the Yukawa-coupling matrices to fermions of a given electric charge remain proportional under the renormalization-group running if and only if there is a basis for the Higgs doublets in which all the fermions of a given electric charge couple to only one Higgs doublet.
Resumo:
This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning head-dependent reservoirs under competitive environment. We propose a novel method, based on mixed-integer nonlinear programming (MINLP), for optimising power generation efficiency. This method considers hydroelectric power generation as a nonlinear function of water discharge and of the head. The main contribution of this paper is that discharge ramping constraints and start/stop of units are also considered, in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve two case studies based on Portuguese cascaded hydro systems, providing a higher profit at an acceptable computation time in comparison with classical optimisation methods based on mixed-integer linear programming (MILP).
Resumo:
Os sistemas de armas da Força Aérea Portuguesa (FAP) têm por missão a defesa militar de Portugal, através de operações aéreas e da defesa do espaço aéreo nacional, sendo o F-16 o principal avião de ataque em uso nesta organização. Neste sentido, e tendo em conta o actual contexto económico mundial, as organizações devem rentabilizar todos os recursos disponíveis, custos associados e optimizar processos de trabalho. Tendo por base os pressupostos anteriores, o presente estudo pretende analisar a implementação de lean na FAP, uma vez que esta filosofia assenta na eliminação de desperdícios com vista a uma melhoria da qualidade e diminuição de tempos e custos. Posto isto, a análise deste trabalho vai recair sobre a área de manutenção do F-16, em concreto na Inspeção de Fase (IF), um tipo de manutenção que esta aeronave realiza a cada trezentas horas de voo. O estudo de caso vai incidir em dois momentos da IF: o primeiro ponto relaciona-se com o processamento da recolha de dados para a reunião preliminar onde são definidas, para as áreas de trabalho executantes, as ações de manutenção a realizar com a paragem da aeronave. Deste modo, pretende-se averiguar as causas inerentes aos atrasos verificados para a realização desta reunião. O segundo ponto em observação compreende a informação obtida através da aplicação informática SIAGFA, em uso na FAP, para o processamento de dados de manutenção das quatro aeronaves que inauguraram a IF com a filosofia lean. Esta análise permitiu perceber o número de horas de trabalho dispendidas (em média pelas quatro aeronaves) por cada uma das cartas de trabalho, verificando-se que as cartas adicionais comportam mais horas; foi possível compreender quais as áreas de trabalho consideradas críticas; foram identificados os dias de trabalho realizado e tempos de paragem sem qualquer tipo de intervenção. Foi ainda avaliado, por aeronave, o número de horas de trabalho realizadas na IF e quais os constrangimentos que se verificaram nas aeronaves, que não realizaram a IF no tempo definido para tal.
Resumo:
This paper is on the unit commitment problem, considering not only the economic perspective, but also the environmental perspective. We propose a bi-objective approach to handle the problem with conflicting profit and emission objectives. Numerical results based on the standard IEEE 30-bus test system illustrate the proficiency of the proposed approach.
Resumo:
It is shown that type I seesaw models based on the standard model Lagrangian extended with three heavy Majorana right-handed fields do not have leptogenesis in leading order, if the symmetries of mass matrices are also the residual symmetry of the Lagrangian. In particular, flavor models that lead to a mass-independent leptonic mixing have a vanishing leptogenesis CP asymmetry. Based on symmetry arguments, we prove that in these models the Dirac-neutrino Yukawa coupling combinations relevant for leptogenesis are diagonal in the physical basis where the charged leptons and heavy Majorana neutrinos are diagonal.
Resumo:
This work addresses the present-day (<100 ka) mantle heterogeneity in the Azores region through the study of two active volcanic systems from Terceira Island. Our study shows that mantle heterogeneities are detectable even when "coeval" volcanic systems (Santa Barbara and Fissural) erupted less than 10 km away. These volcanic systems, respectively, reflect the influence of the Terceira and D. Joao de Castro Bank end-members defined by Beier et at (2008) for the Terceira Rift Santa Barbara magmas are interpreted to be the result of mixing between a HIMU-type component, carried to the upper mantle by the Azores plume, and the regional depleted MORB magmas/source. Fissural lavas are characterized by higher Ba/Nb and Nb/U ratios and less radiogenic Pb-206/Pb-204, Nd-143/Nd-144 and Hf-176/Hf-177, requiring the small contribution of delaminated sub-continental lithospheric mantle residing in the upper mantle. Published noble gas data on lavas from both volcanic systems also indicate the presence of a relatively undegassed component, which is interpreted as inherited from a lower mantle reservoir sampled by the ascending Azores plume. As inferred from trace and major elements, melting began in the garnet stability field, while magma extraction occurred within the spinel zone. The intra-volcanic system's chemical heterogeneity is mainly explained by variable proportions of the above-mentioned local end-members and by crystal fractionation processes. (C) 2011 Elsevier By. All rights reserved.
Resumo:
Dissertação apresentada à Escola Superior de Comunicação Social como parte dos requisitos para obtenção de grau de mestre em Jornalismo.
Resumo:
Mestrado em Contabilidade
Resumo:
Mestrado em Contabilidade e Gestão das Instituições Financeiras
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil na Área de Vias de Comunicação e Transportes
Resumo:
The present work aims to study the feasibility of deploying a farm of sea current turbines for electricity generation in Portugal. An approach to the tides, which are they, how they are formed, its prediction, is held. It is also conducted a study about the energy of sea currents and it is presented some technology about ocean currents too. A model of tidal height and velocity of the currents it is also developed. The energy produced by a hypothetical park, built in Sines (Portugal), is calculated and afterwards, an economical assessment is performed for two possible scenarios and a sensitivity analysis of NVP (Net Present Value) and LCOE (Levelized Cost of Energy) is figured. The conclusions about the feasibility of the projects are also presented. Despite being desired due to its predictability, this energy source is not yet economically viable as it is in an initial state of development. To push investment in this technology a feed-in tariff of, at least €200/MWh, should be considered.
Resumo:
The present work aims to study the feasibility of deploying a farm of sea current turbines for electricity generation in Portugal. An approach to the tides, which are they, how they are formed, its prediction, is held. It is also conducted a study about the energy of sea currents and it is presented some technology about ocean currents too. A model of tidal height and velocity of the currents it is also developed. The energy produced by a hypothetical park, built in Sines (Portugal), is calculated and afterwards, an economical assessment is performed for two possible scenarios and a sensitivity analysis of NVP (Net Present Value) and LCOE (Levelized Cost of Energy) is figured. The conclusions about the feasibility of the projects are also presented. Despite being desired due to its predictability, this energy source is not yet economically viable as it is in an initial state of development. To push investment in this technology a feed-in tariff of, at least €200/MWh, should be considered.
Resumo:
The purpose of this paper is to discuss the linear solution of equality constrained problems by using the Frontal solution method without explicit assembling. Design/methodology/approach - Re-written frontal solution method with a priori pivot and front sequence. OpenMP parallelization, nearly linear (in elimination and substitution) up to 40 threads. Constraints enforced at the local assembling stage. Findings - When compared with both standard sparse solvers and classical frontal implementations, memory requirements and code size are significantly reduced. Research limitations/implications - Large, non-linear problems with constraints typically make use of the Newton method with Lagrange multipliers. In the context of the solution of problems with large number of constraints, the matrix transformation methods (MTM) are often more cost-effective. The paper presents a complete solution, with topological ordering, for this problem. Practical implications - A complete software package in Fortran 2003 is described. Examples of clique-based problems are shown with large systems solved in core. Social implications - More realistic non-linear problems can be solved with this Frontal code at the core of the Newton method. Originality/value - Use of topological ordering of constraints. A-priori pivot and front sequences. No need for symbolic assembling. Constraints treated at the core of the Frontal solver. Use of OpenMP in the main Frontal loop, now quantified. Availability of Software.
Resumo:
This paper is on the self-scheduling problem for a thermal power producer taking part in a pool-based electricity market as a price-taker, having bilateral contracts and emission-constrained. An approach based on stochastic mixed-integer linear programming approach is proposed for solving the self-scheduling problem. Uncertainty regarding electricity price is considered through a set of scenarios computed by simulation and scenario-reduction. Thermal units are modelled by variable costs, start-up costs and technical operating constraints, such as: forbidden operating zones, ramp up/down limits and minimum up/down time limits. A requirement on emission allowances to mitigate carbon footprint is modelled by a stochastic constraint. Supply functions for different emission allowance levels are accessed in order to establish the optimal bidding strategy. A case study is presented to illustrate the usefulness and the proficiency of the proposed approach in supporting biding strategies. (C) 2014 Elsevier Ltd. All rights reserved.
Resumo:
In the framework of multibody dynamics, the path motion constraint enforces that a body follows a predefined curve being its rotations with respect to the curve moving frame also prescribed. The kinematic constraint formulation requires the evaluation of the fourth derivative of the curve with respect to its arc length. Regardless of the fact that higher order polynomials lead to unwanted curve oscillations, at least a fifth order polynomials is required to formulate this constraint. From the point of view of geometric control lower order polynomials are preferred. This work shows that for multibody dynamic formulations with dependent coordinates the use of cubic polynomials is possible, being the dynamic response similar to that obtained with higher order polynomials. The stabilization of the equations of motion, always required to control the constraint violations during long analysis periods due to the inherent numerical errors of the integration process, is enough to correct the error introduced by using a lower order polynomial interpolation and thus forfeiting the analytical requirement for higher order polynomials.