2 resultados para Policy-based management

em Repositório Científico do Instituto Politécnico de Lisboa - Portugal


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Mestrado em Controlo e Gestão dos Negócios

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper, a novel mixed-integer nonlinear approach is proposed to solve the short-term hydro scheduling problem in the day-ahead electricity market, considering not only head-dependency, but also start/stop of units, discontinuous operating regions and discharge ramping constraints. Results from a case study based on one of the main Portuguese cascaded hydro energy systems are presented, showing that the proposedmixed-integer nonlinear approach is proficient. Conclusions are duly drawn. (C) 2010 Elsevier Ltd. All rights reserved.