5 resultados para Design Factors

em CiencIPCA - Instituto Politécnico do Cávado e do Ave, Portugal


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: The aim of this paper is to analyse the development of environmental management practices by Portuguese local entities and their determining factors. Design/methodology/approach: The data were collected by sending a postal questionnaire. In order to measure the degree of development of environmental management practices an index of environmental management practices (EMPI) was developed, which reflects the extent to which a set of 16 environmental management practices have been implemented by the entities included in the sample. Four variables are considered in this study as possible factors that drive the development of environmental management practices by local entities, namely type of entity, size, proactive environmental strategy and Local Agenda 21 Findings: Results indicate the degree of development of environmental management practices in Portuguese local entities is low. Additionally, entity size, the adoption of proactive environmental strategies and the implementation of Local Agenda 21 are explaining factors of the degree of development of such practices. Originality/value: This study adds to the international research on environmental management in public sector by providing empirical data from a country, Portugal, where empirical evidence is still relatively limited.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to analyse the development of environmental management practices by Portuguese local entities and their determining factors. Design/methodology/approach – The data were collected by sending a postal questionnaire. In order to measure the degree of development of environmental management practices, an index of environmental management practices (EMPI) was developed, which reflects the extent to which a set of 16 environmental management practices have been implemented by the entities included in the sample. In total, four variables are considered in this study as possible factors that drive the development of environmental management practices by local entities: type of entity; size; proactive environmental strategy; and Local Agenda 21. Findings – Results indicate the degree of development of environmental management practices in Portuguese local entities is low. Additionally, entity size, the adoption of proactive environmental strategies and the implementation of Local Agenda 21 are explaining factors of the degree of development of such practices. Originality/value – The paper adds to the international research on environmental management in the public sector by providing empirical data from a country, Portugal, where empirical evidence is still relatively limited.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays, different techniques are available for manufacturing full-arch implant-supported prosthesis, many of them based on an impression procedure. Nevertheless, the long-term success of the prosthesis is highly influenced by the accuracy during such process, being affected by factors such as the impression material, implant position, angulation and depth. This paper investigates the feasibility of a 3D electromagnetic motion tracking system as an acquisition method for modeling such prosthesis. To this extent, we propose an implant acquisition method at the patient mouth, using a specific prototyped tool coupled with a tracker sensor, and a set of calibration procedures (for distortion correction and tool calibration), that ultimately obtains combined measurements of the implant’s position and angulation, and eliminating the use of any impression material. However, in the particular case of the evaluated tracking system, the order of magnitude of the obtained errors invalidates its use for this specific application.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The success of the osseointegration concept and the Brånemark protocol is highly associated to the accuracy in the production of an implant-supported prosthesis. One of most critical steps for long-term success of these prosthesis is the accuracy obtained during the impression procedure, which is affected by factors such as the impression material, implant position, angulation and depth. This paper investigates the feasibility of 3D electromagnetic motion tracking systems as an acquisition method for modeling full-arch implant-supported prosthesis. To this extent, we propose an implant acquisition method at the patient mouth and a calibration procedure, based on a 3D electromagnetic tracker that obtains combined measurements of implant’s position and angulation, eliminating the use of any impression material. Three calibration algorithms (namely linear interpolation, higher-order polynomial and Hardy multiquadric) were tested to compensate for the electromagnetic tracker distortions introduced by the presence of nearby metals. Moreover, implants from different suppliers were also tested to study its impact on tracking accuracy. The calibration methodology and the algorithms employed proved to implement a suitable strategy for the evaluation of novel dental impression techniques. However, in the particular case of the evaluated electromagnetic tracking system, the order of magnitude of the obtained errors invalidates its use for the full-arch modeling of implant-supported prosthesis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Performance measurement is seen as a main pillar of public management reforms. However, prior research did not mitigate the level of ambiguity on PMS development and use and many questions left unanswered. Our findings provide knowledge on the design and use of PMS in the public sector answer- ing to calls for a complementary approach among institutional and contingency factors. The authors find that the design of PMS and the use of performance information for external purposes are increased to legitimate the organizational’ work and to obtain external support. Moreover, structural variables such as type of agency and management autonomy are also determinants on the organizational responses. Finally, the authors find some coupling between the design of PMS and outcomes. So, both contingent and institutional approaches play an important role on the empirical model.