5 resultados para project management processes

em Biblioteca Digital da Produção Intelectual da Universidade de São Paulo (BDPI/USP)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

We describe administrative reform involving management innovation undertaken at the Superior Tribunal of Justice, Brazil`s highest appellate court for infra-constitutional cases. The innovation is the introduction of a new management model based on strategic planning and a process management approach to work processes. Introduction of the new model has been supported by the use of information technology and project management techniques. Qualitative methods were used for data collection and analysis. Findings reveal that the innovation is contributing to the development of a systemic overview of key processes, reducing the fragmenting effects of the division of work activities within the Tribunal. At least three new organizational routines or capabilities have been developed as a result of the innovation studied: Electronic Court Management, Project Management, and Process Management. The paper contributes to knowledge about court management, a field that has received little research attention in the public administration literature.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The scavenging processes of chemical species have been previously studied with numerical modeling, in order to understand the gas and particulate matter intra-reservoir transferences. In this study, the atmospheric (RAMS) and scavenging (B.V.2) models were used, in order to simulate sulfate concentrations in rainwater using scavenging processes as well as the local atmospheric conditions obtained within the LBA Project in the State of Rondonia, during a dry-to-wet transition season. Two case studies were conducted. The RAMS atmospheric simulation of these events presented satisfactory results, showing the detailed microphysical processes of clouds in the Amazonian region. On the other hand, with cloud entrainments, observed values have been overestimated. Modeled sulfate rainwater concentration, using exponential decay and cloud heights of 16 km and no entrainments, presented the best results, reaching 97% of the observed value. The results, using shape parameter 5, are the best, improving the overall result. (C) 2008 Elsevier Ltd. All rights reserved.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Thousands of Free and Open Source Software Projects (FSP) were, and continually are, created on the Internet. This scenario increases the number of opportunities to collaborate to the same extent that it promotes competition for users and contributors, who can guide projects to superior levels, unachievable by founders alone. Thus, given that the main goal of FSP founders is to improve their projects by means of collaboration, the importance to understand and manage the capacity of attracting users and contributors to the project is established. To support researchers and founders in this challenge, the concept of attractiveness is introduced in this paper, which develops a theoretical-managerial toolkit about the causes, indicators and consequences of attractiveness, enabling its strategic management.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This article presents an extensive investigation carried out in two technology-based companies of the So Carlos technological pole in Brazil. Based on this multiple case study and literature review, a method, entitled hereafter IVPM2, applying agile project management (APM) principles was developed. After the method implementation, a qualitative evaluation was carried out by a document analysis and questionnaire application. This article shows that the application of this method at the companies under investigation evidenced the benefits of using simple, iterative, visual, and agile techniques to plan and control innovative product projects combined with traditional project management best practices, such as standardization.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The diffusion of Pollution Prevention faces organizational barriers as for instance resistance to change, insufficient support from decision-makers, unclear project leadership, insufficient employee accountability and inflexible organizational structures. To understand how to overcome such barriers, the performance of a Pollution Prevention program of a multinational corporation is analyzed. The quantitative analyses of 2096 Pollution Prevention projects conducted between 1995 and 2007 support the conclusion that the performance of the Pollution Prevention program increased after the implementation of the Six Sigma program. Moreover, the analyses of 1906 Pollution Prevention projects and 31,133 Six Sigma projects for cost reduction in 27 countries indicate that in countries where the implementation of Six Sigma is more expressive, pollution is prevented more than in countries with less expressive Six Sigma implementation. In fact, the Six Sigma implementation improved the organizational capability for data based project management. Therefore, comparing six years before and six years after the Six Sigma implementation, the total number of Pollution Prevention projects recognized increased 6.9 times and the total amount of pollution prevented increased by 62%. The qualitative analysis describes how the Six Sigma program interacts with the Pollution Prevention program in the studied company. (C) 2009 Elsevier Ltd. All rights reserved.