10 resultados para Project Management Maturity Model

em Biblioteca Digital da Produção Intelectual da Universidade de São Paulo (BDPI/USP)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

We describe administrative reform involving management innovation undertaken at the Superior Tribunal of Justice, Brazil`s highest appellate court for infra-constitutional cases. The innovation is the introduction of a new management model based on strategic planning and a process management approach to work processes. Introduction of the new model has been supported by the use of information technology and project management techniques. Qualitative methods were used for data collection and analysis. Findings reveal that the innovation is contributing to the development of a systemic overview of key processes, reducing the fragmenting effects of the division of work activities within the Tribunal. At least three new organizational routines or capabilities have been developed as a result of the innovation studied: Electronic Court Management, Project Management, and Process Management. The paper contributes to knowledge about court management, a field that has received little research attention in the public administration literature.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The health sector requires continuous investments to ensure the improvement of products and services from a technological standpoint, the use of new materials, equipment and tools, and the application of process management methods. Methods associated with the process management approach, such as the development of reference models of business processes, can provide significant innovations in the health sector and respond to the current market trend for modern management in this sector (Gunderman et al. (2008) [4]). This article proposes a process model for diagnostic medical X-ray imaging, from which it derives a primary reference model and describes how this information leads to gains in quality and improvements. (C) 2010 Elsevier Ireland Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article presents a proposal of a systemic model composed for the micro and small companies (MSE) of the region of Ribeiro Preto and the agents which influenced their environment. The proposed model was based on Stafford Beer`s (Diagnosing the system for organizations. Chichester, Wiley, 1985) systemic methodologies VSM (Viable System Model) and on Werner Ulrich`s (1983) CSH (Critical Systems Heuristics). The VSM is a model for the diagnosis of the structure of an organization and of its flows of information through the application of the cybernetics concepts (Narvarte, In El Modelo del Sistema Viable-MSV: experiencias de su aplicacin en Chile. Proyecto Cerebro Colectivo del IAS, Santiago, 2001). On the other hand, CSH focus on the context of the social group applied to the systemic vision as a counterpoint to the organizational management view considered by the VSM. MSE of Ribeiro Preto and Sertozinho had been analyzed as organizations inserted in systems that relate and integrate with other systems concerning the public administration, entities of representation and promotion agencies. The research questions: which are the bonds of interaction among the subsystems in this process and who are the agents involved? The systemic approach not only diagnosed a social group, formed by MSE of Ribeiro Preto and Sertozinho, public authorities and support entities, but could also delineate answers that aimed the clarification of obscure questions generating financial assistance to the formularization of efficient actions for the development of this system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Thousands of Free and Open Source Software Projects (FSP) were, and continually are, created on the Internet. This scenario increases the number of opportunities to collaborate to the same extent that it promotes competition for users and contributors, who can guide projects to superior levels, unachievable by founders alone. Thus, given that the main goal of FSP founders is to improve their projects by means of collaboration, the importance to understand and manage the capacity of attracting users and contributors to the project is established. To support researchers and founders in this challenge, the concept of attractiveness is introduced in this paper, which develops a theoretical-managerial toolkit about the causes, indicators and consequences of attractiveness, enabling its strategic management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article presents an extensive investigation carried out in two technology-based companies of the So Carlos technological pole in Brazil. Based on this multiple case study and literature review, a method, entitled hereafter IVPM2, applying agile project management (APM) principles was developed. After the method implementation, a qualitative evaluation was carried out by a document analysis and questionnaire application. This article shows that the application of this method at the companies under investigation evidenced the benefits of using simple, iterative, visual, and agile techniques to plan and control innovative product projects combined with traditional project management best practices, such as standardization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A procedure to evaluate mine rehabilitation practices during the operational phase was developed and validated. It is based on a comparison of actually observed or documented practices with internationally recommended best practices (BP). A set of 150 BP statements was derived from international guides in order to establish the benchmark. The statements are arranged in six rehabilitation programs under three categories: (1) planning (2) operational and (3) management, corresponding to the adoption of the plan-do-check-act management systems model to mine rehabilitation. The procedure consists of (i) performing technical inspections guided by a series of field forms containing BP statements; (ii) classifying evidences in five categories; and (iii) calculating conformity indexes and levels. For testing and calibration purposes, the procedure was applied to nine limestone quarries and conformity indexes were calculated for the rehabilitation programs in each quarry. Most quarries featured poor planning practices, operational practices reached high conformity levels in 50% of the cases and management practices scored moderate conformity. Despite all quarries being ISO 14001 certified, their management systems pay low attention to issues pertaining to land rehabilitation and biodiversity. The best results were achieved by a quarry whose expansion was recently submitted to the environmental impact assessment process, suggesting that public scrutiny may play a positive role in enhancing rehabilitation practices. Conformity indexes and levels can be used to chart the evolution of rehabilitation practices at regular intervals, to establish corporate goals and for communication with stakeholders. (C) 2010 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The diffusion of Pollution Prevention faces organizational barriers as for instance resistance to change, insufficient support from decision-makers, unclear project leadership, insufficient employee accountability and inflexible organizational structures. To understand how to overcome such barriers, the performance of a Pollution Prevention program of a multinational corporation is analyzed. The quantitative analyses of 2096 Pollution Prevention projects conducted between 1995 and 2007 support the conclusion that the performance of the Pollution Prevention program increased after the implementation of the Six Sigma program. Moreover, the analyses of 1906 Pollution Prevention projects and 31,133 Six Sigma projects for cost reduction in 27 countries indicate that in countries where the implementation of Six Sigma is more expressive, pollution is prevented more than in countries with less expressive Six Sigma implementation. In fact, the Six Sigma implementation improved the organizational capability for data based project management. Therefore, comparing six years before and six years after the Six Sigma implementation, the total number of Pollution Prevention projects recognized increased 6.9 times and the total amount of pollution prevented increased by 62%. The qualitative analysis describes how the Six Sigma program interacts with the Pollution Prevention program in the studied company. (C) 2009 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - The purpose of this paper is to verify if Brazilian companies are adopting environmental requirements in the supplier selection process. Further, this paper intends to analyze whether there is a relation between the level of environmental management maturity and the inclusion of environmental criteria in the companies` selection of suppliers. Design/methodology/approach - A review of mainstream literature on environmental management, traditional criteria in the supplier selection process and the incorporation of environmental requirements in this context. The empirical study`s strategy is based on five Brazilian case studies with industrial companies. Face-to-face interviews and informal conversations are to be held, explanations made by e-mail with representatives from the purchasing, environmental management, logistics and other areas, and observation and the collection of company documents are also employed. Findings - Based on the cases, it is concluded that companies still use traditional criteria to select suppliers, such as quality and cost, and do not adopt environmental requirements in the supplier selection process in a uniform manner. Evidence found shows that the level of environmental management maturity influences the depth with which companies adopt environmental criteria when selecting suppliers. Thus, a company with more advanced environmental management adopts more formal procedures for selecting environmentally appropriate suppliers than others. Originality/value - This is the first known study to verify if Brazilian companies are adopting environmental requirements in the supplier selection process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article aims to analyse the introduction of environmental issues in the context of the production function, which has been referred to as the organisational area to lead corporate environmental management. With that purpose, the theoretical references for corporate environmental management and the necessary alterations in production function have been organised to include environmental aspects, especially in terms of product and process development, quality management, and logistics. Considering that this research field still lacks empirical evidence for Brazilian companies, four case studies were conducted using companies located in the country. The environmental management maturity level of those companies tends to follow the rate with which the environmental issue is introduced in production sub-areas, especially in the product development process. However, in most cases we found that the companies had difficulties in structuring the insertion of the environmental dimension in logistics. The final notes point out the distance observed between what is recommended by international literature and the reality of Brazilian companies in the challenge of making the production function environmentally friendly.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background-The effectiveness of heart failure disease management proarams in patients under cardiologists` care over long-term follow-up is not established. Methods and Results-We investigated the effects of a disease management program with repetitive education and telephone monitoring on primary (combined death or unplanned first hospitalization and quality-of-life changes) and secondary end points (hospitalization, death, and adherence). The REMADHE [Repetitive Education and Monitoring for ADherence for Heart Failure] trial is a long-term randomized, prospective, parallel trial designed to compare intervention with control. One hundred seventeen patients were randomized to usual care, and 233 to additional intervention. The mean follow-up was 2.47 +/- 1.75 years, with 54% adherence to the program. In the intervention group, the primary end point composite of death or unplanned hospitalization was reduced (hazard ratio, 0.64; confidence interval, 0.43 to 0.88; P=0.008), driven by reduction in hospitalization. The quality-of-life questionnaire score improved only in the intervention group (P<0.003). Mortality was similar in both groups. Number of hospitalizations (1.3 +/- 1.7 versus 0.8 +/- 1.3, P<0.0001), total hospital days during the follow-up (19.9 +/- 51 versus 11.1 +/- 24 days, P<0.0001), and the need for emergency visits (4.5 +/- 10.6 versus 1.6 +/- 2.4, P<0.0001) were lower in the intervention group. Beneficial effects were homogeneous for sex, race, diabetes and no diabetes, age, functional class, and etiology. Conclusions-For a longer follow-up period than in previous studies, this heart failure disease management program model of patients under the supervision of a cardiologist is associated with a reduction in unplanned hospitalization, a reduction of total hospital days, and a reduced need for emergency care, as well as improved quality of life, despite modest program adherence over time. (Circ Heart Fail. 2008;1:115-124.)