15 resultados para Student BIM project
em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast
Resumo:
The cycle of the academic year impacts on efforts to refine and improve major group design-build-test (DBT) projects since the time to run and evaluate projects is generally a full calendar year. By definition these major projects have a high degree of complexity since they act as the vehicle for the application of a range of technical knowledge and skills. There is also often an extensive list of desired learning outcomes which extends to include professional skills and attributes such as communication and team working. It is contended that student project definition and operation, like any other designed product, requires a number of iterations to achieve optimisation. The problem however is that if this cycle takes four or more years then by the time a project’s operational structure is fine tuned it is quite possible that the project theme is no longer relevant. The majority of the students will also inevitably experience a sub-optimal project experience over the 5 year development period. It would be much better if the ratio were flipped so that in 1 year an optimised project definition could be achieved which had sufficient longevity that it could run in the same efficient manner for 4 further years. An increased number of parallel investigators would also enable more varied and adventurous project concepts to be examined than a single institution could undertake alone in the same time frame.
This work-in-progress paper describes a parallel processing methodology for the accelerated definition of new student DBT project concepts. This methodology has been devised and implemented by a number of CDIO partner institutions in the UK & Ireland region. An agreed project theme was operated in parallel in one academic year with the objective of replacing a multi-year iterative cycle. Additionally the close collaboration and peer learning derived from the interaction between the coordinating academics facilitated the development of faculty teaching skills in line with CDIO standard 10.
Resumo:
To determine the feasibility of educating adults about their risk of prediabetes/diabetes in a community pharmacy, to determine the common risk factors for prediabetes/diabetes in adults visiting a community pharmacy, and to assess any association between risk factors and age.
Resumo:
Design-build experiences (DBEs) are an essential element of any programme based on the CDIO methodology. They enable students to develop practical hands-on skills, they enable the learning of theory by stealth and they provide a forum for developing professional skills such as team working and project management. The hands-on aspect of certain DBEs has significant risk associated with it, which must be addressed through the formal evaluation of risks and the development of a methodology for controlling them. This paper considers the aspects of design-build experiences that may impact on student safety. In particular, it examines the risk associated with each of the four stages of CDIO and gives examples of risks which may commonly apply across engineering disciplines. A system for assessing and controlling the risks in any particular DBE is presented and the paper finishes by discussing the significance of health and safety in the educational environment.
Resumo:
We describe here a method of assessment for students. A number of short-comings of traditional assessment methods, especially essays and examinations, are discussed and an alternative assessment method, the student project, is suggested. The method aims not just to overcome the short-comings of more traditional methods, but also to provide over-worked and under-resourced academics with viable primary data for socio-legal research work. Limitations to the method are discussed, with proposals for minimising the impact of these limitations. The whole �student project� approach is also discussed with reference to the Quality Assurance Agency benchmark standards for law degrees, standards which are expected of all institutions in the UK.
Resumo:
In this article the authors explore and evaluate developments in the use of information and communications technologies (ICT) within social work education at Queen's University Belfast since the inception of the new degree in social work. They look at the staff development strategy utilised to increase teacher confidence and competence in use of the Queen's Online virtual learning environment tools as well as the student experience of participation in modules involving online discussions. The authors conclude that the project provided further opportunity to reflect on how ICT can be used as a platform to support a whole course in a systematic and coordinated way and to ensure all staff remained abreast of ongoing developments in the use of ICT to support learning which is a normative expectation of students entering universities. A very satisfying outcome for the leaders is our observation of the emergence of other 'experts' in different aspects of use of ICT amongst the staff team. This project also shows that taking a team as opposed to an individual approach can be particularly beneficial
Resumo:
Practice learning is viewed as one of the most important components of social work education wherever in the world social work is practised. Northern Ireland and the Republic of Ireland provide an interesting case example of the educational impact on students resulting from their experience of different models of practice learning. Although sharing a common historical legacy, recent developments in policy in both jurisdictions have tended to engender greater divergences in how programmes organise and deliver social work education and practice learning. Drawing on findings from a joint-research project with students in Queen’s University, Belfast and Trinity College, Dublin, the authors highlight significant cross-border similarities as well as differences in the way practice learning is conceptualised, organised and delivered. Through comparing and contrasting student experiences, the authors reflect on how the findings might help to inform the future development of practice learning standards in both jurisdictions.
Resumo:
Live projects adopt a wide range of approaches: design/ build, community engagement, participation, protest, analysis, etc. They are driven by tutors with passion, expertise and the ability to manage risk, in ways that exhibit fluency and high levels of skill. They also offer sites of student-led and community co-learning, can support research, demonstrate ‘impact’ and satisfy universities’ policies on outreach. Whilst the breadth and reach of Live Projects is now demonstrably wide, we still fail to fully locate Live Projects within a pedagogical context, tending instead to limit our descriptions and hence analysis to the architectural process and outcome. This failure to locate Live Projects within a pedagogical framework means we still struggle to encapsulate, critique, progress, and indeed, elevate the work.
This chapter draws on some of the case studies presented in recent papers and international conferences in order to provide educators with signposts and important overviews around which and in respect to they can develop their own pedagogical frameworks.
Resumo:
This report presents the results of a collaborative project between Queens University, Belfast and the Robert Gordon University, Aberdeen, and builds on a dialogue initiated during Session 2009-10 through which course guidance and feedback received by students was identified as an area requiring deeper understanding in order to enhance current practice
Resumo:
The ability of building information modeling (BIM) to positively impact projects in the AEC through greater collaboration and integration is widely acknowledged. This paper aims to examine the development of BIM and how it can contribute to the cold-formed steel (CFS) building industry. This is achieved through the adoption of a qualitative methodology encompassing a literature review, exploratory interviews with industry experts, culminating in the development of e-learning material for the sector. In doing so, the research team have collaborated with one of the United Kingdom’s largest cold-formed steel designer/fabricators. By demonstrating the capabilities of BIM software and providing technical and informative videos in its creation, this project has found two key outcomes. Firstly, to provide invaluable assistance in the transition from traditional processes to a fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. Secondly, to demonstrate BIM’s potential not only within CFS companies, but also within the AEC sector as a whole. As the flexibility, adaptability and interoperability of BIM software is alluded to, the results indicate that the introduction and development of BIM and the underlying ethos suggests that it is a key tool in the development of the industry as a whole.
Resumo:
Nurse lecturer Siobhan McCullough developed a project to help her students become more politically aware. ‘What has politics got to do with nursing?’ This is a question I hear often as a lecturer in nursing with a specialist interest in politics, as is the comment: ‘I did not come into nursing to learn about politics.’
Resumo:
Building Information Modelling (BIM) is continuing to evolve and develop as the construction industry progresses towards level 2 maturity. However, one of the core barriers in this progression is the aspect of interoperability between software packages. This research and paper stems from a Knowledge Transfer Partnership (KTP) where both industry and academia come together to address this shortcoming within the sector. One of the core objectives of this partnership and the aim of this study is investigating potential solutions to this barrier, while also developing best working practices to be applied in industry. Using one of the case studies from this partnership (a temporary steel structure), this paper demonstrates a potential solution to addressing interoperability within structural analysis and detailing packages, MasterSeries and Revit respectively. The findings of the research indicate that a process based approach rather than that of additional software coding as being the preferred solution. The results of this preliminary research will aid in the development of the topic of interoperability within the sector, while also developing the knowledge and competencies of the parties within the KTP. The findings are explored further, by providing an overview of the resolution process adopted in this case study, in overcoming the interoperability that arose as the project progressed. It is envisaged that this study will assist the construction sector and its adoption of BIM technologies, while also addressing the critical aspect of operability between software.
Resumo:
Comparisons of international child welfare systems have identified two basic orientations to practice; a ‘child protection’ orientation and a ‘child welfare’ orientation, which are founded upon fundamentally different values and assumptions regarding the family, the origins of child care problems, and the proper role of the state in relation to the family. This paper describes a project which sought to compare how undergraduate social work students from three European Universities perceive risk in referrals about the welfare of children and to explore the impact of different cultural, ideological and educational contexts on the way in which risk is constructed by students. Students from Northern Ireland, Germany and Poland examined three vignettes via ten online discussion fora each of which provided a narrative summary of their discussion. The paper presents some findings from the analysis of the qualitative data emerging from the student discussions and draws out the lessons learned in terms of how the project was designed and implemented using online discussion fora.
Resumo:
There is a broad consensus surrounding the ability of building information modelling (BIM) to positively impact a project by enabling greater collaboration. This paper aims to examine the development of BIM and how it can contribute to the evermore present and growing cold-formed steel (CFS) industry. This is achieved thorough a comprehensive literature review and four exploratory interviews with industry experts. Work has been carried out, for the first time, alongside one of the UK’s largest CFS Designer/Fabricators in conjunction with Northern Ireland’s leading Architectural and Town Planning Consultants in the identification and dissemination of information. The capabilities of BIM have been investigated through modeling of simple CFS structures n consultation with the project partners. By scrutinising the literature and associated interviews, the primary opportunities, as well as barriers, of BIM implementation have been investigated in the context of these companies. It is essential to develop greater understanding of the flexibility, adaptability and interoperability of BIM software as the UK construction industry faces a daunting challenge; fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. This paper, and the wider study that it stems from, approaches the problem from a new angle, from sections of the construction industry that have not yet fully embedded BIM.