17 resultados para Construction Management, Employees, Job Performance

em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Few studies to date have paid attention to relationship management when addressing performance problems. To bridge the knowledge gap, a questionnaire survey is conducted to analyze the impact of relationship management on project performance in construction. The analysis reveals that the deterioration of working relationships may increase the likelihood of poor performance. Poor performance can be effectively reduced by improving some aspects of working relationships. Collaborative working contributes to performance improvement, in which long-term collaboration is more effective than short-term collaboration. In addition to the questionnaire survey, a series of expert interviews provide a deeper insight into effective relationship management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Regional Cultural Centre in Letterkenny is a new 2000sqm arts center containing theatre, galleries, workshops and ancillary offices. The site is set back from the street, on high ground with good views. The form and envelope of the building was derived from geometrically connecting the site with the town’s two other main public buildings, the Cathedral (1901) and new Civic Offices (2002, also designed by MacGabhann Architects). This geometrical connection or vectors informed the geometry and shape of the building. This urban matrix of geometrically connecting three corner stones of society, namely the ecclesiastical headquarters, the administrative head quarters and the art centre helps to improve the town planning and urban design of the disparate and chaotic development that Letterkenny has become.
The large cantilever, which houses a 300sqm gallery, is aligned towards the Civic Offices, marks the entrance, and signifies a change of direction of the pedestrian route past the building, like a modern day obelisk.
The circulation routes and stairs internally provide views towards the civic offices and cathedral, thus reinforcing the connection between the three buildings and helps visitors make some sense of Letterkenny as an urban center. The main stairs and vertical circulation are contained behind the large glazed foyer, which is framed to be viewed externally like a proscenium stage, with visitors to the building passively acting their routes through the building.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research assesses the effectiveness of current MSc. Construction Project Management programmes within the UK and Ireland. A review of published prospectuses is used to create questionnaires for universities, graduates and employers. Responses provide an insight into programme creation and their relative success in addressing the needs of industry and in achieving other educational objectives. Since the majority of learning institutions have attained professional accreditation, it is useful to review these awards and to assess their potential value to both graduates and industry alike. Interviews are conducted with representatives from the main professional accrediting bodies to understand their procedures and rigour in enforcing standards of education and training. The results show that project management education could be further enhanced by the inclusion of more practical learning and that current programmes place greater emphasis on hard skills at the expense of the softer human skills. There is clearly a need for a closer working relationship between academics and practitioners to tackle the perceived gap between theoretical learning and construction practice. Learning institutions can use the findings to improve their programmes and address the education deficiencies identified by the industry, by the professional institutions and by graduates.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main aim of this study is to investigate the consequences of cross-cultural adjustment in an under researched sample of British expatriates working on International Architectural, Engineering and Construction (AEC) assignments. Adjustment is the primary outcome of an expatriate assignment. According to Bhaskar-Srinivas et al., (2005), Harrison et al., (2004) it is viewed to affect other work related outcomes which could eventually predict expatriate success. To address the scarcity of literature on expatriate management in the AEC sector, an exploratory design was adopted. Phase one is characterised by extensive review of extant literature, whereas phase two was qualitative exploration from British expatriates’ perspective; here seven unstructured interviews were carried out. Further, cognitive mapping analysis through Banaxia decision explorer software was conducted to develop a theoretical framework and propose various hypotheses. The findings imply that British AEC firms could sustain their already established competitive advantage in the global marketplace by acknowledging the complexity of international assignments, prioritising expatriate management and offering a well-rounded support to facilitate expatriate adjustment and ultimately achieve critical outcomes like performance, assignment completion and job satisfaction.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry in Northern Ireland is one of the major contributors of construction waste to landfill each year. The aim of this research paper is to identify the core on-site management causes of material waste on construction sites in Northern Ireland and to illustrate various methods of prevention which can be adopted. The research begins with a detailed literature review and is complemented with the conduction of semi-structured interviews with 6 professionals who are experienced and active within the Northern Ireland construction industry. Following on from the literature review and interviews analysis, a questionnaire survey is developed to obtain further information in relation to the subject area. The questionnaire is based on the key findings of the previous stages to direct the research towards the most influential factors. The analysis of the survey responses reveals that the core causes of waste generation include a rushed program, poor handling and on-site damage of materials, while the principal methods of prevention emerge as the adequate storage, the reuse of material on-site and efficient material ordering. Furthermore, the role of the professional background in the shaping of perceptions relevant to waste management is also investigated and significant differences are identified. The findings of this research are beneficial for the industry as they enhance the understanding of construction waste generation causes and highlight the practices required to reduce waste on-site in the context of sustainable development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Reactive power has become a vital resource in modern electricity networks due to increased penetration of distributed generation. This paper examines the extended reactive power capability of DFIGs to improve network stability and capability to manage network voltage profile during transient faults and dynamic operating conditions. A coordinated reactive power controller is designed by considering the reactive power capabilities of the rotor-side converter (RSC) and the grid-side converter (GSC) of the DFIG in order to maximise the reactive power support from DFIGs. The study has illustrated that, a significant reactive power contribution can be obtained from partially loaded DFIG wind farms for stability enhancement by using the proposed capability curve based reactive power controller; hence DFIG wind farms can function as vital dynamic reactive power resources for power utilities without commissioning additional dynamic reactive power devices. Several network adaptive droop control schemes are also proposed for network voltage management and their performance has been investigated during variable wind conditions. Furthermore, the influence of reactive power capability on network adaptive droop control strategies has been investigated and it has also been shown that enhanced reactive power capability of DFIGs can substantially improve the voltage control performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The time period bridging the years 2007 to 2012 will be remembered as one characterised by dramatic changes in the Irish and UK construction industries. Construction companies witnessed unprecedented changes in the environment, namely the coincidence of a sharp economic downturn, the significant decline of public works, a reduction in lending, increased competition, and structural changes in the marketplace. Nevertheless, little has been documented on what response strategies construction companies adopt as a result of an economic recession. Based on four exploratory case studies, a taxonomy framework of the response strategies adopted by Irish and UK construction companies during the 2007 economic recession was developed relative to Porter’s (1980) generic strategies of cost leadership, differentiation, and focus. Porter’s model (1980) is a well known theoretical framework among business strategists and industrial economists worldwide. The analysis provides strong support for the adoption of cost leadership strategies as a means to surviving the 2007 economic recession. The case studies further suggest that cost control initiatives are one of the most important attributes in companies’ responses to the 2007 recession. The findings provide valuable assistance for construction contractors in developing effective strategies and thus reducing business failures during recessionary periods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Inner city developments are a common feature within many urban environments. Where these construction sites are not managed effectively, they can negatively impact their surrounding community. The aim of this paper is to identify and document, in an urban context, the numerous issues encounter and subsequent strategies adopted by on-site contractors and local people, in the mitigation of factors which negatively impact their surrounding community. The objectives in achieving this aim are to identify what effect, if any, an urban construction site has on its surrounding environment, the issues and resulting strategies adopted by contractors on the factors identified, and also what measures are put in place to minimise such disturbances to the local community. In order to meet the requirements, a mixed methodology is adopted culminating in a literature review, case study analysis, contractor and community interviews, concluding in the development of two specific questions for both perspectives in question. The data is assessed using severity indices based on mean testing in the development of key findings. The results indicate that the main forms of disturbance to the local community from an urban development include noise, dust and traffic congestion. With respect to a contractor on-site, the key issues include damaging surrounding buildings, noise control and off-site parking. The resulting strategies identified in the mitigation of such issues include the implementation of noise and dust containment measures and minimising disruption to local infrastructure. It is envisaged that the results of this study will provide contractors operating in such environments, with the required information which can assist in minimising disruption and therefore, avoiding disputes with the local community members. By consulting with and surveying those most affected, this research will illustrate to on-site management, the difficulties faced by those who accommodate such developments within their living environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research concentrates on the critical success factors driving construction quality and the barriers that must be overcome to achieve quality in Brunei. It hopes to identify methods of quality improvement and clearly justify investment in this area of local industry. Over the past number of years, Brunei has attempted to diversify its industry from the dominant oil and gas sector into secondary sectors,
including construction. To date, very little research has been carried out in many areas of construction management that take into account the specific industry context in Brunei. A comprehensive literature review has been employed to enable a questionnaire to be constructed and distributed among Brunei construction
professionals. The results have been analyzed through mean testing. This analysis reveals that the key barriers to construction quality in Brunei relate to lack of skills, lack of clarity in responsibility and communication and poor commitment among the design team. The critical success factors include issues relating to competency, capability, commitment and effectiveness, primarily among managers and decision-makers. The results of this study will hopefully contribute to fill the knowledge gap related to construction management in the context of Brunei and facilitate movement towards improved techniques and strategies that will foster higher quality in construction. The findings can be generalised across similar
developing economies and it is suggested that in general, the management concepts governing construction quality remain similar across the borders of East and West.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The sudden change in environmental munificence level in the construction sector
during the period 2007 – 2015 provides a natural experiment to investigate strategic
and operating actions of firms, particularly during an environmental jolt. Statistics on
business failures corroborate that neither academics nor practitioners have succeeded
in guiding strategic action during periods of environmental jolt. Despite the recent
increase of turnaround research in the general management domain, its use in the
construction management realm remains underexplored. To address this research
gap, five exploratory case studies of an ongoing PhD study were used to examine the
turnaround strategies of construction contractors during a period of economic
contraction and growth. The findings show that, although retrenchment is often
considered to be a short-term strategy, this is clearly not the case; with the majority of
contractors maintaining the strategy for 6-7 years. During the same period,
internationalization became critical, with the turnaround process shifting towards
strategic reorientation that altered the firms' market domain. The case studies further
suggest that strategic and operational actions resonate quite well with contemporary
practice-based approaches to strategy making. The findings provide valuable
assistance for construction contractors in dealing with organisational decline and in
developing a successful turnaround response.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study examined the interaction of reaction component of personal need for structure (reaction to lack of structure, RLS) and role perceptions in predicting job satisfaction, job involvement, affective commitment, and occupational identity among employees working in long-term care for elderly people. High-RLS employees experienced more role conflict, had less job satisfaction, and experienced lower levels of occupational identity than did low-RLS employees. We found individual differences in how problems in roles affected employees' job attitudes. High-RLS employees experienced lower levels of job satisfaction, job involvement, and affective commitment, irrespective of role-conflict levels. Low-RLS employees experienced detrimental job attitudes only if role-conflict levels were high. Our results suggest that high-RLS people benefit less from low levels of experienced role conflicts.