122 resultados para 340209 Public Sector Economics


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper analyses some key features of Irish public administration as it has developed since the foundation of the state, paying particular attention to the period from the late 1950s onward. During these decades, notwithstanding successive waves of concern expressed over the need for public sector reform, the evidence suggests an underlying lack of coherence in the evolution of the public administrationsystem that resulted in a poor capacity for effective policy coordination. Yet the drive toward economic modernisation also resulted in the creation of new state competence to support industrial development both directly and indirectly. These changes can be tracked organisationally, drawing on the database of the IRCHSS-funded Mapping the Irish State project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Considerable time, research money and expertise has been spent exploring the complex reality of ethno nationalist conflict and the role that public management plays in supporting the transition from violent conflict to stability, order and prosperity (Esman 1999; Guelke and Milton-Edwards 2000; Brinkerhoff 2005; Brinkerhoff, Wetterberg et al. 2012; Rao 2014). However, there seems to be a gap in relation to the practical challenges of managing change within, through and beyond such conflict. This paper aims to begin the process of putting a framework around the real experience of public management in conflict and transition by shifting the lens of analysis from macros concerns about sequencing interventions (Rao 2014) and legitimate requirements of security, stability and service delivery (Brinkerhoff, Wetterberg et al. 2012) to a micro analysis of the attitudes, behaviours, challenges and compromises held and faced by those public servants on the front line of conflict management and conflict transformation processes. Using senior managers as the unit of analysis and Northern Ireland as an embryonic case study, this paper discusses the links between ethno nationalist societal conflict, public sector reform and manager behaviour. In doing so, it highlights some initial data from an early pilot study into the experiences of individuals in significant public service roles at various stages of the NI conflict / peace process and draws some tentative conclusions about the viability of a wider study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK government introduced the Private Finance Initiative (PFI) and, latterly, the Local Improvement Finance Trust (LIFT) in an attempt to improve public service provision. As a variant of PFI, LIFT seeks to create a framework for the effective provision of primary care facilities. Like conventional PFI procurement, LIFT projects involve long-term contracts, complex multi-party interactions and thus create various risks to public sector clients. This paper investigates the advantages and disadvantages of LIFT with a focus on how this approach facilitates or impedes risk management from the public sector client perspective. Our paper concludes that LIFT has a potential for creating additional problems, including the further reduction of public sector control, conflicts of interest, the inappropriate use of enabling funds, and higher than market rental costs affecting the uptake of space in the buildings by local health care providers. However, there is also evidence that LIFT has facilitated new investment and that Primary Care Trusts (PCTs) have themselves started addressing some of the weaknesses of this procurement format through the bundling of projects and other forms of regional co-operation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

During the past twenty years, the UK has relied heavily on Public Private Partnerships (PPP) and especially the Private Finance Initiative in the procurement of infrastructure and services. Discussing the causes of the credit crunch and its effects on PPP, this paper notes that the provision of new public sector infrastructure and related services has been adversely affected by the impact of the credit crunch on Private Finance Initiatives (PFIs). These problems have arisen primarily from the unwillingness of commercial banks to replace collapsed PFI bond financing unless new PFI contracts reduce financial risks; which, in turn, is likely to increase the cost of these projects to the public sector. Additional financial strains have arisen for the UK government from the need to bail out collapsed PFI projects. Overall we find evidence that the UK commitment to PFI has not only increased immediate fiscal pressures on the UK when these have become least palatable, but has also created fiscal vulnerabilities at local and national levels which are likely to hamper the country’s ability to launch counter-cyclical responses to the ongoing crisis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In many developed and developing countries there has been a move toward an increased reliance on Public Private Partnerships (PPPs) for infrastructure development. This involves an engagement with, or participation of, private companies and the public sector in the financing and provision of infrastructure. In most countries these PPP arrangements have been aimed at overcoming broad public sector constraints in relation to either a lack of public capital; and/or a lack of public sector capacity, resources and specialized expertise to develop, manage, and operate infrastructure assets.
In a number of countries Public Private Partnerships are now commonly used to accelerate economic growth, development and infrastructure delivery and to achieve quality service delivery and good governance. The spectrum of nature and types of public private partnerships (PPPs) are vast, making a precise and complete definition of a PPP difficult. However, significant developments in the use of PPP in many countries have made it increasingly important to understand these practices, as well as to unveil any underlying common principles and problems and to capture and develop a body of good practices, where such can be achieved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose
The study contributes to the literature on public value and performance examining politicians’ and managers’ perspectives by investigating the importance they attach to the different facets of performance information (i.e. budgetary, accrual based- and non-financial information (NFI)).

Design/methodology/approach
We survey politicians and managers in all Italian municipalities of at least 80,000 inhabitants.

Findings
Overall, NFI is more appreciated than financial information (FI). Moreover, budgetary accounting is preferred to accrual accounting. Politicians’ and managers’ preferences are generally aligned.

Research limitations/implications
NFI as a measure of public value is not alternative, but rather complementary, to FI. The latter remains a fundamental element of public sector accounting due to its role in resource allocation and control.

Practical implications
The preference for NFI over FI and of budgetary over accruals accounting suggests that the current predominant emphasis on (accrual-based) financial reporting might be misplaced.

Originality/value
Public value and performance are multi-faceted concepts. They can be captured by different types of information and evaluated according to different criteria, which will also depend on the category of stakeholders or users who assesses public performance. So far, most literature has considered the financial and non-financial facets of performance as virtually separate. Similarly, in the practice, financial management tends to be decoupled from non-financial performance management. However, this research shows that only by considering their joint interactions we can achieve an accurate representation of what public value really is.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper relates to work supported by the Joseph Rowntree Foundation which examines the way Scottish Local Authorities have approached budget cuts (Asenova, et. al., 2013). Starting with a discussion of notions of social risk, we discuss the heightened challenges faced by local authorities. We note that the literature on public sector innovation predict such pressures would cause local authorities to engage in short term decision making and adopt a static coping approach to risk mitigation which is likely to stifle innovation and obstruct the creation of more coherent and resilient localities. Although we find this to have happened in some areas, we discuss two cases where these challenges have promoted innovative and inclusive approaches to service re-design and delivery.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In May 2006, the NEC contract was introduced as the preferred contract for Northern Ireland public sector works. This was subsequently followed by the 2007 economic crash and ensuing recession, which continues to affect the Northern Ireland Construction Industry, to a greater extent than the remainder of the United Kingdom (UK). However, use of the NEC contract has increased during this period, particularly in the public sector. There has been debate in the literature regarding the impact of the NEC contract on adversarial behaviour, but little consideration of the impact of external economic factors on the use of the NEC contract. Using a sequential mixed method approach, the study aims to fill this gap in knowledge, through examination of the impact the economic downturn has had on the operation of the NEC contract in Northern Ireland. Qualitative and quantitative findings show that the demands placed by the NEC contract, and the effects of the economic recession, have exerted opposing forces contract implementation, thus hindering its execution. The findings can lead to a deeper understanding, in the context of both industry and academia, of situations where a lack of resources may negatively impact the operation of the NEC contract.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There has been private sector involvement in the delivery of public services in the Irish State since its foundation. This involvement was formalised in 1998 when Public Private Partnership (PPP) was officially introduced. Ireland is a latecomer to PPP and, prior to the credit crisis, was seen as a ‘rapid follower’ relying primarily on the UK PPP model in the procurement of infrastructure in transport, education, housing/urban regeneration and water/wastewater.  PPP activity in Ireland stalled during the credit crisis, and some projects were cancelled, but it has taken off again recently with part of the Infrastructure and Capital Investment Plan 2016 – 2021 to be delivered through PPP showing continuing political commitment to PPP.  Ireland’s interest in PPP cannot be explained by economic rationale alone, as PPP was initiated during a period of prosperity. We consider three alternative explanations: voluntary adoption – where the UK model was closely followed; coercive adoption – where PPP policy was forced upon Ireland; and institutional isomorphism – where institutional creation and change was promoted to aid public sector organisations in gaining institutional legitimacy. We find evidence of all three patterns, with coercive adoption becoming more relevant in recent years. Ireland’s rapid uptake of PPP differs from other European countries, mostly because when PPP was introduced in 1998, the Irish State was in an economic position where it could have directly procured necessary infrastructure. This paper therefore asks why PPP was adopted and how this adoption pattern has affected the sustainability of PPP in Ireland.  This paper defines PPP; examines the background to the PPP approach adopted in Ireland; outlines the theoretical framework of the paper: transfer theory and institutional theory; discusses the methodology; reports on findings and gives conclusions.   

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Over the last thirty years, there has been an increased demand for better management of public sector organisations (PSOs). This requires that they are answerable for the inputs that they are given but also for what they achieve with these inputs (Hood 1991; Hood 1995). It is suggested that this will improve the management of the organisation through better planning and control, and the achievement of greater accountability (Smith 1995). However, such a rational approach with clear goals and the means to measure achievement can cause difficulties for many PSOs. These difficulties include the distinctive nature of the public sector due to the political environment within which the public sector manager operates (Stewart and Walsh 1992) and the fact that PSOs will have many stakeholders, each of whom will have their own specific objectives based on their own perspective (Boyle 1995). This can
result in goal ambiguity which means that there is leeway in interpreting the results of the PSO. The National Asset Management Agency (NAMA) was set up to bring stability to the financial system by buying loans from the banks (which were in most cases, non-performing loans). The intention was to cleanse the banks of these loans so that they could return to their normal business of taking deposits and making loans. However, the legislation, also gave NAMA a wide range of other responsibilities including responsibility for facilitating credit in the economy and protecting the interests of taxpayers. In more recent times, NAMA has been given responsibility for building social housing. This wide-range of activities is a clear example of a PSO being given multiple goals which may conflict and is therefore likely to lead to goal ambiguity. This makes it very difficult to evaluate NAMA’s performance as they are attempting to meet numerous goals at the same time and also highlights the complexity of policy making in the public sector. The purpose of this paper is to examine how NAMA dealt with goal ambiguity. This will be done through a thematic analysis of its annual reports over the last five years. The paper’s will contribute to the ongoing debate about the evaluation of PSOs and the complex environment within which they operate which makes evaluation difficult as they are
answerable to multiple stakeholders who have different objectives and different criteria for measuring success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

New Public Management (NPM) has aroused significant interest amongst academe, policy makers and practitioners, since its first articulation in the seminal articles by Hood (1991 and 1995). However, in the 21st century, a body of opinion has developed which asserts that the NPM is passé. This paper seeks to determine the contemporary status of NPM in the context of the UK, one of the early adopters of NPM. Close inspection of UK Government policy underlines the importance of NPM ideas in the New Labour Government modernisation policy (1997-2010). Furthermore, the policy actions of the 2010–2015 UK Coalition Government reveal that the global financial crisis intensified the drive for NPM in the UK’s public sector. This discussion reveals no evidence in support of the demise of NPM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Both Northern Ireland and Republic of Ireland governments recognise the current infrastructural deficits in their respective jurisdictions which, if not addressed, will undermine the future economic prosperity of both regions. This paper considers the adoption of a collaborative approach on the island to addressing the deficit, using public private partnerships (PPP) as the delivery vehicle. It presents a critical perspective of the challenges and opportunities posed by adopting such a cross-border approach. Whilst PPPs have the potential to bring about North-South co-operation, bridge gaps in infrastructure capacity and facilitate the advancement of sectoral knowledge, their adoption on a cross border basis will require significant reorganisation and change at administrative and sectoral levels. This review concludes that governments and construction sector representatives in Northern Ireland and the Republic of Ireland have still some work to do in order to enhance the capability and readiness of public and private partners to evolve an all-island PPP infrastructure development approach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

To help design an environment in which professionals without legal training can make effective use of public sector legal information on planning and the environment - for Add-Wijzer, a European e-government project - we evaluated their perceptions of usefulness and usability. In concurrent think-aloud usability tests, lawyers and non-lawyers carried out information retrieval tasks on a range of online legal databases. We found that non-lawyers reported twice as many difficulties as those with legal training (p = 0.001), that the number of difficulties and the choice of database affected successful completion, and that the non-lawyers had surprisingly few problems understanding legal terminology. Instead, they had more problems understanding the syntactical structure of legal documents and collections. The results support the constraint attunement hypothesis (CAH) of the effects of expertise on information retrieval, with implications for the design of systems to support the effective understanding and use of information.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article examines the processes and outcomes of community involvement in six Irish urban regeneration case studies, three in Dublin and three in Belfast. The findings are part of a wider study using a Complex Adaptive Systems perspective to analyse public sector decision making. Key points included: (1) the community ‘vision’ of the regeneration as an emergent property, which converged towards the vision held by the implementing agencies in the four most successful programmes; and (2) the identification of three features that contribute to non-linear (unpredictable) behaviour: a history of community involvement; the availability of resources; and the intervention of key individuals at crisis points.