53 resultados para Method of production
Resumo:
(EN)Disclosed is a method of detecting bioproducts using Localized Surface Plasmon Resonance (LSPR) of gold nanoparticles, which can diagnose bioproducts based on changes in the maximum wavelength occurred by an antigen-antibody reaction after immobilization of the gold nanoparticles onto a glass panel. A sensor using such method exhibits high sensitivity, is low in price, and makes quick diagnosis possible, thereby being applicable to various biological fields associated with environmental contaminants, pathogens and the like, as well as diagnosis of diseases. Further, it provides a technology for manufacturing a sensor having higher sensitivity, low price and quick performance, as compared to conventional methods using SPR.
Resumo:
The modern stereologic method of vertical sections was applied to the retina as a means of generating unbiased estimates of three-dimensional structure. The method is illustrated with real data on the volume and surface area of the capillary basement membrane from the central retina of the rat. Novel methods of estimating the volume of retina sampled and of creating accurate vertical sections are described. The advantages of using stereologic methods to generate quantitative information on the three-dimensional structure of the retina are discussed and compared to those of previous quantitative methods that provide data on two-dimensional structure only.
Resumo:
Gastro-oesophageal reflux (GOR)-related aspiration is associated with respiratory disease, but the current "gold standard" investigation, the lipid-laden macrophage index (LLMI), is flawed. A specific marker of GOR-related aspiration should originate in the stomach, but not the lung. An assay to detect gastric pepsin in the bronchoalveolar lavage (BAL) of children was developed and validated.
Resumo:
The cycle of the academic year impacts on efforts to refine and improve major group design-build-test (DBT) projects since the time to run and evaluate projects is generally a full calendar year. By definition these major projects have a high degree of complexity since they act as the vehicle for the application of a range of technical knowledge and skills. There is also often an extensive list of desired learning outcomes which extends to include professional skills and attributes such as communication and team working. It is contended that student project definition and operation, like any other designed product, requires a number of iterations to achieve optimisation. The problem however is that if this cycle takes four or more years then by the time a project’s operational structure is fine tuned it is quite possible that the project theme is no longer relevant. The majority of the students will also inevitably experience a sub-optimal project experience over the 5 year development period. It would be much better if the ratio were flipped so that in 1 year an optimised project definition could be achieved which had sufficient longevity that it could run in the same efficient manner for 4 further years. An increased number of parallel investigators would also enable more varied and adventurous project concepts to be examined than a single institution could undertake alone in the same time frame.
This work-in-progress paper describes a parallel processing methodology for the accelerated definition of new student DBT project concepts. This methodology has been devised and implemented by a number of CDIO partner institutions in the UK & Ireland region. An agreed project theme was operated in parallel in one academic year with the objective of replacing a multi-year iterative cycle. Additionally the close collaboration and peer learning derived from the interaction between the coordinating academics facilitated the development of faculty teaching skills in line with CDIO standard 10.
Resumo:
A method of manufacturing a composite concrete article comprising affixing at least one layer of textile to a base layer and incorporating the base layer into a body of wet uncured concrete such that the base layer becomes embedded in the concrete, whereby at least a portion of the at least one textile layer defines at least a portion of a surface of the cured concrete article with the base layer embedded within the concrete to anchor the textile layer to the concrete.