46 resultados para Bridge construction industry


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Self-consolidating concrete (SCC) developed in Japan in the late 80s has enabled the construction industry to reduce demand on the resources, improve the work conditions and also reduce the impact on the environment by elimination of the need for compaction. This investigation aimed at exploring the potential use of the neurofuzzy (NF) approach to model the fresh and hardened properties of SCC containing pulverised fuel ash (PFA) as based on experimental data investigated in this paper. Twenty six mixes were made with water-to-binder ratio ranging from 0.38 to 0.72, cement content ranging from 183 to 317 kg/m3 , dosage of PFA ranging from 29 to 261 kg/m3 , and percentage of superplasticizer, by mass of powder, ranging from 0 to 1%. Nine properties of SCC mixes modeled by NF were the slump flow, JRing combined to the Orimet, JRing combined to cone, V-funnel, L-box blocking ratio, segregation ratio, and the compressive strength at 7, 28, and 90 days. These properties characterized the filling ability, the passing ability, the segregation resistance of fresh SCC, and the compressive strength. NF model is constructed by training and testing data using the experimental results obtained in this study. The results of NF models were compared with experimental results and were found to be quite accurate. The proposed NF models offers useful modeling approach of the fresh and hardened properties of SCC containing PFA.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The election of February 2011 was dominated by the International Monetary Fund/European Central Bank bailout of November 2010, the state of the public finances, the ongoing Irish banking crisis, and the disastrous state of the economy with rising unemployment, emigration and collapsing international competiveness. After years of phenomenal economic growth (at least as measured by orthodox economic measurements such as gross domestic product (GDP) and foreign direct investment), known as the 'Celtic Tiger‘, during which a bloated construction industry accounted for a quarter of GDP and Irish banks sank nearly a third of their lending in construction projects, Ireland has entered a 'post-Celtic Tiger‘ era. This article offers a critical analysis outlining some political, economic and cultural issues of this election as heralding a decisive stage in the 'post-Celtic Tiger' development of the Republic of Ireland, and suggests that what is required at this present historical moment is that a different development model be articulated by the Irish state and wider society.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose: This paper investigates the link between two knowledge areas that have not been previously linked conceptually; stakeholder management and corporate culture. Focussing on the UK Construction Industry, the research study demonstrates mutual dependency of each of these areas on the other and establishes a theoretical framework with real potential to impact positively upon industry.

Design/methodology/approach: The study utilises both qualitative and quantitative data collection and then analysis to produce results contributing to the final framework. Semi-structured interviews were used and analysed through a cognitive mapping procedure. The result of this stage, set in the context of previous research, facilitated a questionnaire to be developed which helped gather quantitative values from a larger sample to enhance the final framework.

Findings: The data suggests that stakeholder management and corporate culture are key areas of an organisation’s success, and that this importance will only grow in future. A clearly identifiable relationship was established between the two theoretical areas and a framework developed and quantified.

Originality/value: It is evident that change is needed within the UK Construction Industry. Companies must employ ethical and social stakeholder management and manage their corporate culture like any other aspect of their business. Successfully doing this will lead to more successful projects, better reputation and survival. The findings of this project begin to show how change may occur and how companies might intentionally deploy advantageous configurations of corporate culture and stakeholder management.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The commonly used British Standard constant head triaxial permeability (BS) test, for permeability testing of fine grained soils, is known to have a relatively long test duration. Consequently, a reduction in the required time for permeability test provides potential cost savings, to the construction industry (specifically, for use during Construction Quality Control (CQA) of landfill mineral liners). The purpose of this article is to investigate and evaluate alternative short duration testing methods for the measurement of the permeability of fine grained soils.

As part of the investigation the feasibility of an existing method of short duration permeability test, known as the Accelerated Permeability (AP) test was assessed and compared with permeability measured using British Standard method (BS) and Ramp Accelerated Permeability (RAP). Four different fine grained materials, of a variety of physical properties were compacted at various moisture contents to produced analogous samples for testing using three the three different methodologies. Fabric analysis was carried out on specimens derived from post-test samples using Mercury Intrusion Porosimetry (MIP) and Scanning Electron Microscope (SEM) to assess the effects of testing methodology on soil structure. Results showed that AP testing in general under predicts permeability values derived from the BS test due to large changes in structure of the soil caused by AP test methodology, which is also validated using MIP and SEM observations. RAP testing, in general provides an improvement to the AP test but still under-predicts permeability values. The potential savings in test duration are shown to be relatively minimal for both the AP and RAP tests.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The commonly used British Standard constant head triaxial permeability test for testing of fine-grained soils is relatively time consuming. A reduction in the required time for soil permeability testing would provide potential cost savings to the construction industry, particularly in the construction quality assurance of landfill clay liners. The purpose of this paper is to evaluate an alternative approach of measuring permeability of fine-grained soils benefiting from accelerated time scaling for seepage flow when testing specimens in elevated gravity conditions provided by a centrifuge. As part of the investigation, an apparatus was designed and produced to measure water flow through soil samples under conditions of elevated gravitational acceleration using a small desktop laboratory centrifuge. A membrane was used to hydrostatically confine the test sample. A miniature data acquisition system was designed and incorporated in the apparatus to monitor and record changes in head and flow throughout the tests. Under enhanced gravity in the centrifuge, the flow through the sample was under ‘variable head' conditions as opposed to ‘constant head' conditions as in the classic constant head permeability tests conducted at 1 g . A mathematical model was developed for analysis of Darcy's coefficient of permeability under conditions of elevated gravitational acceleration and verified using the results obtained. The test data compare well with the results on analogous samples obtained using the classical British Standard constant head permeability tests.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The mining/quarrying industry is a sector of industry where there are very few Life Cycle Assessment (LCA) tools, and where the role of LCA has been poorly investigated. A key issue is the integration of three inter-dependent life cycles: Project, Asset and Product. Given the unique features of mining LCAs, this Note from the Field presents a common methodology implemented within the Sustainable Aggregates Resource Management (SARMa) Project (www.sarmaproject.eu) in order to boost adoption of LCA in the aggregate industry in South Eastern Europe. The proposed methodology emphasises the importance of resource efficiency and recycling in the context of a Sustainable Supply Mix of aggregates for the construction industry. Through its adoption, aggregate producers, recyclers, and governmental planners would gain confidence with LCA tools and conduct consistent and meaningful life cycle analyses of natural and recycled aggregates. © 2011 Elsevier Ltd. All rights reserved.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Since the first launch of the new engineering contract (NEC) in 1993, early warning of problems has been widely recognized as an important approach of proactive management during a construction or engineering project. Is early warning really effective for the improvement of problem solving and project performance? This is a research question that still lacks a good answer. For this reason, an empirical investigation was made in the United Kingdom (U.K.) to answer the question. This study adopts a combination of literature review, expert interview, and questionnaire survey. Nearly 100 questionnaire responses were collected from the U.K. construction industry, based on which the use of early warning under different forms of contract is compared in this paper. Problem solving and project performance are further compared between the projects using early warning and the projects not using early warning. The comparison provides clear evidence for the significant effect of early warning on problem solving and project performance in terms of time, cost, and quality. Subsequently, an input-process-output model is developed in this paper to explore the relationship among early warning, problem solving, and project
performance. All these help construction researchers and practitioners to better understand the role of early warning in ensuring project success.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The purpose of this research is to identify and assess the opportunities and challenges of implementing a Site Waste Management Plan (SWMP) on projects irrespective of size. In the UK, construction and demolition waste accounts for a third of all UK waste. There are a number of factors that influence the implementation of SWMPs. In order to identify and analyse these factors, 4 unstructured interviews were carried out and a sample of 56 participants completed a questionnaire survey. The scope of the study was limited to UK
construction industry professionals. The analysis revealed that more needs to be done if the industry is to meet government targets of reduction in construction related waste going to landfill. In addition, although SWMP may not yet be legally required on all construction projects, clients and contractors need to realise
the benefits to cut costs and implement best practice by adopting a SWMP. The benefits of implementing a SWMP will not only help to achieve this but also gain significant cost savings on projects and is also extremely beneficial to the environment. This study presents evidence that contractors need to do more to reduce waste and draws a clear link between waste reduction and the implementation of SWMPs. The findings are useful in the ongoing efforts to encourage the industry to find smarter, more efficient and less
damaging ways to operate

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In comparison to the rest of the United Kingdom (UK) the Northern Irish Construction Industry was disproportionately affected by the recent economic recession. During this period, use of the New Engineering Contract (NEC) has proliferated in the public sector, however no study has been undertaken to examine the impact of the recession on this contract in Northern Ireland. The aim of this paper is to explore NEC contract implementation in Northern Ireland and the impact of the recession on its operation. A qualitative methodology is adopted using a literature review and semi structured interviews with six construction professionals. A qualitative analysis identifies themes and issues arising exploring connections and links between them using thematic coding. The initial findings are that the introduction of the NEC contract in Northern Ireland makes demands of contractors and consultants in terms of additional resources and training. Some consultants show a clear lack of understanding of the contract and its provisions. Whilst there is general agreement that the contract does help to stimulate good project management, the interviewees find the contract time consuming and complicated to administer, describing it as “unforgiving for the architect and unforgiving to the contractor.” Due to the impact of the recession, both contractors and consultants are still reporting a drop in income from pre-recession levels. Project resourcing levels have dropped significantly since the onset of the recession. Adversarial and opportunistic behaviour has increased. Many consultants and contractors are struggling to adequately administer the NEC contract at current income levels. The introduction of the NEC contract and the economic recession have exerted opposing forces on the implementation of the contract, hindering its execution. As the pressures exerted by the economic recession abate and a greater understanding of the contract develops, these opposing forces will ease leading to a more consistent implementation of the contract.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The importance of inter-organizational trust to project success has been increasingly highlighted in the construction industry. This study aims to explore the role of trust between project parties. It adopts a combination of quantitative and qualitative methodologies. Based on the analysis of the responses of a questionnaire survey, trust is demonstrated to have a significant contribution to the development of cooperative or collaborative relationships; fostering trust proves to have a major influence on the improvement of project performance; and some relationship and performance indicators are found to have closer associations with trust than others so that trust is more important to
the development of relationship and the improvement of performance in these aspects. The analysis of questionnaire responses also provides significant evidence for the reduction in monitoring and control following the increase of mutual trust. The questionnaire survey is followed by a series of expert interviews, both of which contribute to the establishment of a model that links trust with relationship and performance and distinguishes the new approach that is based on trust from the traditional mechanism that relies on monitoring and control.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The growth of the construction industry worldwide poses a serious concern on the sustainability of the building material production chain, mainly due to the carbon emissions related to the production of Portland cement. On the other hand, valuable materials from waste streams, particularly from the metallurgical industry, are not used at their full potential. Alkali activated concrete (AAC) has emerged in the last years as a promising alternative to traditional Portland cement based concrete for some applications. However, despite showing remarkable strength and durability potential, its utilisation is not widespread, mainly due to the lack of broadly accepted standards for the selection of suitable mix recipes fulfilling design requirements, in particular workability, setting time and strength. In this paper, a contribution towards the design development of AAC synthetized from pulverised fuel ash (60%) and ground granulated blast furnace slag (40%) activated with a solution of sodium hydroxide and sodium silicate is proposed. Results from a first batch of mixes indicated that water content influences the setting time and that paste content is a key parameter for controlling strength development and workability. The investigation indicated that, for the given raw materials and activator compositions, a minimum water to solid (w/s) ratio of 0.37 was needed for an initial setting time of about 1 hour. Further work with paste content in the range of 30% to 33% determined the relationship between workability and strength development and w/s ratio and paste content. Strengths in the range of 50 - 60 MPa were achieved.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Environmental problems, especially climate change, have become a serious global issue waiting for people to solve. In the construction industry, the concept of sustainable building is developing to reduce greenhouse gas emissions. In this study, a building information modeling (BIM) based building design optimization method is proposed to facilitate designers to optimize their designs and improve buildings’ sustainability. A revised particle swarm optimization (PSO) algorithm is applied to search for the trade-off between life cycle costs (LCC) and life cycle carbon emissions (LCCE) of building designs. In order tovalidate the effectiveness and efficiency of this method, a case study of an office building is conducted in Hong Kong. The result of the case study shows that this method can enlarge the searching space for optimal design solutions and shorten the processing time for optimal design results, which is really helpful for designers to deliver an economic and environmental friendly design scheme.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Early contractor involvement is a topic that has attracted attention from construction practitioners and researchers in the UK since the 1990s. It has been adopted to introduce construction knowledge and experience to the design process, and to integrate design with construction. In contrast with the limited number of previous studies on early contractor involvement, which used case studies, a questionnaire survey was conducted in this study, to investigate the application of early contractor involvement in current practice and its impact on project performance in terms of time, cost and quality. From an analysis of the questionnaire results, early contractor involvement is found to be increasingly used in the construction industry, and to have a significant impact on cost and time performance. This research provides empirical evidence related to the practice of early contractor involvement. It demonstrates the major influence of early contractor involvement on management processes and working relationships during a project, which contribute to performance improvement and project success.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

There is a broad consensus surrounding the ability of building information modelling (BIM) to positively impact a project by enabling greater collaboration. This paper aims to examine the development of BIM and how it can contribute to the evermore present and growing cold-formed steel (CFS) industry. This is achieved thorough a comprehensive literature review and four exploratory interviews with industry experts. Work has been carried out, for the first time, alongside one of the UK’s largest CFS Designer/Fabricators in conjunction with Northern Ireland’s leading Architectural and Town Planning Consultants in the identification and dissemination of information. The capabilities of BIM have been investigated through modeling of simple CFS structures n consultation with the project partners. By scrutinising the literature and associated interviews, the primary opportunities, as well as barriers, of BIM implementation have been investigated in the context of these companies. It is essential to develop greater understanding of the flexibility, adaptability and interoperability of BIM software as the UK construction industry faces a daunting challenge; fully collaborative 3D BIM as required by the UK Government under the “Government Construction Strategy” by 2016 in all public sector projects. This paper, and the wider study that it stems from, approaches the problem from a new angle, from sections of the construction industry that have not yet fully embedded BIM.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In May 2006, the NEC contract was introduced as the preferred contract for Northern Ireland public sector works. This was subsequently followed by the 2007 economic crash and ensuing recession, which continues to affect the Northern Ireland Construction Industry, to a greater extent than the remainder of the United Kingdom (UK). However, use of the NEC contract has increased during this period, particularly in the public sector. There has been debate in the literature regarding the impact of the NEC contract on adversarial behaviour, but little consideration of the impact of external economic factors on the use of the NEC contract. Using a sequential mixed method approach, the study aims to fill this gap in knowledge, through examination of the impact the economic downturn has had on the operation of the NEC contract in Northern Ireland. Qualitative and quantitative findings show that the demands placed by the NEC contract, and the effects of the economic recession, have exerted opposing forces contract implementation, thus hindering its execution. The findings can lead to a deeper understanding, in the context of both industry and academia, of situations where a lack of resources may negatively impact the operation of the NEC contract.