120 resultados para Canada-U.S. Border


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This single center study is the largest series of renal transplant recipients and donors screened for the commonest prothrombotic genotypes. A total of 562 transplant recipients and 457 kidney donors were genotyped for the factor V Leiden and prothrombin G20210A mutations. The prevalence of heterozygous factor V Leiden was 3.4% and 2.6% and prothrombin G20210A was 2.0% and 1.1% in recipients and donors, respectively, similar frequencies to that of the general U.K. population. The 30-day and 1-year graft survival rates in recipients with thrombophilic mutations were 93% and 93%, compared with 88% and 82% in patients without these mutations (log-rank P =0.34). Thrombophilia in recipients (odds ratio 0.55; confidence interval 0.06-2.29; P =0.56) or in donors (odds ratio 1.53; confidence interval 0.27-5.74; P =0.46) did not correlate with graft loss at 30 days after transplantation. In contrast to recent reports, this study did not demonstrate an association between thrombophilia and renal allograft loss, and routine screening is not recommended.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent experimental data for fully differential cross sections have been compared to various continuum-distorted-wave eikonal-initial-state models without much success, despite good agreement with double-differential cross sections. A four-body model is formulated here and results are presented both when the internuclear potential is omitted and when it is included. They are compared with recent experimental data for fully differential cross sections for 3.6 MeV/u Au-P(Z)++He collisions, Z(P)=24,53.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Both Northern Ireland and Republic of Ireland governments recognise the current infrastructural deficits in their respective jurisdictions which, if not addressed, will undermine the future economic prosperity of both regions. This paper considers the adoption of a collaborative approach on the island to addressing the deficit, using public private partnerships (PPP) as the delivery vehicle. It presents a critical perspective of the challenges and opportunities posed by adopting such a cross-border approach. Whilst PPPs have the potential to bring about North-South co-operation, bridge gaps in infrastructure capacity and facilitate the advancement of sectoral knowledge, their adoption on a cross border basis will require significant reorganisation and change at administrative and sectoral levels. This review concludes that governments and construction sector representatives in Northern Ireland and the Republic of Ireland have still some work to do in order to enhance the capability and readiness of public and private partners to evolve an all-island PPP infrastructure development approach.