29 resultados para Buntin, Bill
Resumo:
Bridge construction responds to the need for environmentally friendly design of motorways and facilitates the passage through sensitive natural areas and the bypassing of urban areas. However, according to numerous research studies, bridge construction presents substantial budget overruns. Therefore, it is necessary early in the planning process for the decision makers to have reliable estimates of the final cost based on previously constructed projects. At the same time, the current European financial crisis reduces the available capital for investments and financial institutions are even less willing to finance transportation infrastructure. Consequently, it is even more necessary today to estimate the budget of high-cost construction projects -such as road bridges- with reasonable accuracy, in order for the state funds to be invested with lower risk and the projects to be designed with the highest possible efficiency. In this paper, a Bill-of-Quantities (BoQ) estimation tool for road bridges is developed in order to support the decisions made at the preliminary planning and design stages of highways. Specifically, a Feed-Forward Artificial Neural Network (ANN) with a hidden layer of 10 neurons is trained to predict the superstructure material quantities (concrete, pre-stressed steel and reinforcing steel) using the width of the deck, the adjusted length of span or cantilever and the type of the bridge as input variables. The training dataset includes actual data from 68 recently constructed concrete motorway bridges in Greece. According to the relevant metrics, the developed model captures very well the complex interrelations in the dataset and demonstrates strong generalisation capability. Furthermore, it outperforms the linear regression models developed for the same dataset. Therefore, the proposed cost estimation model stands as a useful and reliable tool for the construction industry as it enables planners to reach informed decisions for technical and economic planning of concrete bridge projects from their early implementation stages.
Resumo:
This paper looks at the Community Involvement provisions set out in the Planning Bill. It is one of four papers prepared for the Bill, which follow a common format that highlights: the key issues arising in the Bill; summarises the findings of the public consultation and the Government’s response; reviews comparable arrangements in comparable jurisdictions and highlights potential contentious issues that arise.
Resumo:
This paper examines issues of capacity, delivery and quality in relation to the Planning Bill. It is one of four papers and follows a common format highlighting the key issues arising in the Bill; summarising the findings of the public consultation and the Government’s response; reviewing comparable arrangements in comparable jurisdictions and highlighting potential contentious issues.
Resumo:
This Bill marks the first occasion on which the British legislature proposed to confer upon authors a lifetime interest in their literary works (with an additional eleven year post-mortem term vesting in their estates), as well as limited rights of translation and abridgement. In addition the draft legislation proposed to render null and void any contract purporting to assign an author's rights to another for a period of longer than ten years.
The commentary describes the background to the Bill, and in particular the attempts of the London book trade to secure more extensive legislative protection in both 1735 and 1737. It argues that the 1737 Bill is significant precisely because it was never made into law, and because it did not suit the best interests of the metropolitan booksellers. Instead, the book trade increasingly turned to the courts to further secure their commercial interests, giving rise to what is commonly referred to as the ‘battle of the booksellers' throughout the next 40 years.