2 resultados para elsmoreite group

em Portal de Revistas Científicas Complutenses - Espanha


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Tutoring Group-hour in Compulsory Secondary Education and Post-Compulsory Schooling has been eliminated in a number of autonomous communities. Given the importance of the tutorial act as one of the fundamental pillars in students overall development, its disappearance has created considerable disturbance in the educational institutions, sparking a debate regarding the role of the tutor and the impact and effectiveness of their actions. In this survey, teachers from two different schools in the Community of Madrid maintain that they are properly trained to perform the various duties required for a tutor, show strong disagreement to the elimination of the Tutoring Group-hour in secondary schools, advocate incorporating it at a primary school level, and consider one of the main consequences of its disappearance to be less personalized attention for students. In short, an educational response that is less effective.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this study was to analyze if the perceptions of students before and after carrying out the work, that is, their perception of different aspects of the functioning of the group, the working skills acquired as well as those they think that need to be improved, varied depending on whether the contribution of the different members of the group was being co-evaluated or not. 144 students of Physical Activity and Sport Sciences participated in this study. In order to analyze the students' perception of group work the adapted questionnaire by Bourne et al. (2001) was used. Results showed that groups which implemented co-evaluation assessed more negatively the experience in general than those which did not. However, co-evaluation groups perceived their competence to work as a team had improved to a greater extent than the groups without co-evaluation, evaluating more positively both the performance and the result of work and increasing their knowledge of the other team members. Using a co-evaluation system seems to generate both a better assessment of the running of the team and the result of its work.