3 resultados para Logistics platforms

em Biblioteca Digital da Produção Intelectual da Universidade de São Paulo


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Vortex-induced motions (VIM) of floating structures are very relevant for the design of mooring and riser systems. In the design phase, spar and monocolumn VIM behavior, as well as semisubmersible and tension leg platform flow-induced motions, is studied and evaluated. This paper provides a checklist of topics and evidence from a number of sources to justify the selection that should be considered when designing spars or monocolumn platforms regarding the VIM phenomenon. An overview of the influential aspects of the VIM is presented such as heading, external appendages of the hull, concomitant presence of waves and currents, motion suppressor, draft condition (immersed portion of the hull), and external damping due to the presence of risers. Previous works concerning the VIM studies on spar and monocolumn platforms are also addressed. Whenever possible, the results of experiments from diverse authors on this matter are presented and compared. [DOI: 10.1115/1.4003698]

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A versatile and concise approach for the stereoselective synthesis of mono-, di-, and trihydroxylated indolizidines is presented in four to six steps from Cbz-prolinal and a diazophosphonate. The key steps involved a Wolff rearrangement, followed by a stereoselective dihydroxylation/epoxidation reaction, from an alpha,beta-unsaturated diazoketone. The strategy also permits extension to the synthesis of many natural hydroxylated indolizidine alkaloids as demonstrated in the formal synthesis of pumiliotoxin 251D.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Supply chain starts with a demand arisen and ends with material transport and delivery at its final destination. With this in mind, most of manufacturing, processors or distribution companies of consumer goods, spare parts and components for production, processing and finished goods, within national or international markets, may not have information and control over its supply chain performance. This article presents concept and logistics models evolution, purchase order and international supplier management, control tower and its logistics information systems. This also presents a real process implementation for a global high tech manufacturer company.