3 resultados para Hydro power reliability
em Biblioteca Digital da Produção Intelectual da Universidade de São Paulo
Resumo:
In October 2008, the Brazilian Government announced plans to invest US$212 billion in the construction of nuclear power plants, totaling a joint capacity of 60,000 MW. Apart from this program, officials had already announced the completion of the construction of the nuclear plant Angra III; the construction of large-scale hydroelectric plans in the Amazon and the implantation of natural gas, biomass and coal thermoelectric plants in other regions throughout the country. Each of these projects has its proponents and its opponents, who bring forth concerns and create heated debates in the specialized forums. In this article, some of these concerns are explained, especially under the perspective of the comparative analysis of costs involved. Under such merit figures, the nuclear option, when compared to hydro plants, combined with conventional thermal and biomass-fueled plants, and even wind, to expand Brazilian power-generation capacity, does not appear as a priority. (C) 2009 Elsevier Ltd. All rights reserved.
Resumo:
A power transformer needs continuous monitoring and fast protection as it is a very expensive piece of equipment and an essential element in an electrical power system. The most common protection technique used is the percentage differential logic, which provides discrimination between an internal fault and different operating conditions. Unfortunately, there are some operating conditions of power transformers that can mislead the conventional protection affecting the power system stability negatively. This study proposes the development of a new algorithm to improve the protection performance by using fuzzy logic, artificial neural networks and genetic algorithms. An electrical power system was modelled using Alternative Transients Program software to obtain the operational conditions and fault situations needed to test the algorithm developed, as well as a commercial differential relay. Results show improved reliability, as well as a fast response of the proposed technique when compared with conventional ones.
Resumo:
Objective To evaluate the intra- and interobserver reliability of assessment of three-dimensional power Doppler (3D-PD) indices from single spherical samples of the placenta. Methods Women with singleton pregnancies at 2440 weeks' gestation were included. Three scans were independently performed by two observers; Observer 1 performed the first and third scan, intercalated by the scan of Observer 2. The observers independently analyzed the 3D-PD datasets that they had previously acquired using four different methods, each using a spherical sample: random sample extending from basal to chorionic plate; random sample with 2 cm3 of volume; directed sample to the region subjectively determined as containing more color Doppler signals extending from basal to chorionic plate; or directed sample with 2 cm3 of volume. The vascularization index (VI), flow index (FI) and vascularization flow index (VFI) were evaluated in each case. The observers were blinded to their own and each other's results. Additional evaluation was performed according to placental location: anterior, posterior and fundal or lateral. Intra- and interobserver reliability was assessed by intraclass correlation coefficients (ICC). Results Ninety-five pregnancies were included in the analysis. All three placental 3D-PD indices showed only weak to moderate reliability (ICC < 0.66 and ICC < 0.48, intra- and interobserver, respectively). The highest values of ICC were observed when using directed spherical samples from basal to chorionic plate. When analyzed by placental location, we found lower ICCs for lateral and fundal placentae compared to anterior and posterior ones. Conclusion Intra- and interobserver reliability of assessment of placental 3D-PD indices from single spherical samples in pregnant women greater than 24 weeks' gestation is poor to moderate, and clinical usefulness of these indices is likely to be limited. Copyright (c) 2012 ISUOG. Published by John Wiley & Sons, Ltd.