25 resultados para Engineering, Civil|Meteorology
Resumo:
This paper provides additional validation to the problem of estimating wave spectra based on the first-order motions of a moored vessel. Prior investigations conducted by the authors have attested that even a large-volume ship, such as an FPSO unit, could be adopted for on-board estimation of the wave field. The obvious limitation of the methodology concerns filtering of high-frequency wave components, for which the vessel has no significant response. As a result, the estimation range is directly dependent on the characteristics of the vessel response. In order to extend this analysis, further small-scale tests were performed with a model of a pipe-laying crane-barge. When compared to the FPSO case, the results attest that a broader range of typical sea states can be accurately estimated, including crossed-sea states with low peak periods. (C) 2012 Elsevier Ltd. All rights reserved.
Resumo:
Mining operations around the world make extensive use of blasthole sampling for short-term planning, which has two undisputed advantages: (1) blastholes are closely spaced providing relatively high sampling density per ton, and (2) there is no additional cost since the blastholes must be drilled anyway. However, blasthole sampling usually presents poor sampling precision, and the inconstant sampling bias caused by particle size and density segregation is an even more serious problem, generally precluding representativeness. One of the main causes of this bias is a highly varying loss of fines, which can lead to both under- and over-estimation of grade depending on the ore type and the gangue. This study validates a new, modified sectorial sampler, designed to reduce the loss of fines and thereby increase sampling accuracy for narrow-diameter blasthole sampling. First results show a significantly improved estimation of gold grade as well as the minimization of the loss of fines.
Resumo:
This paper addressed the problem of water-demand forecasting for real-time operation of water supply systems. The present study was conducted to identify the best fit model using hourly consumption data from the water supply system of Araraquara, Sa approximate to o Paulo, Brazil. Artificial neural networks (ANNs) were used in view of their enhanced capability to match or even improve on the regression model forecasts. The ANNs used were the multilayer perceptron with the back-propagation algorithm (MLP-BP), the dynamic neural network (DAN2), and two hybrid ANNs. The hybrid models used the error produced by the Fourier series forecasting as input to the MLP-BP and DAN2, called ANN-H and DAN2-H, respectively. The tested inputs for the neural network were selected literature and correlation analysis. The results from the hybrid models were promising, DAN2 performing better than the tested MLP-BP models. DAN2-H, identified as the best model, produced a mean absolute error (MAE) of 3.3 L/s and 2.8 L/s for training and test set, respectively, for the prediction of the next hour, which represented about 12% of the average consumption. The best forecasting model for the next 24 hours was again DAN2-H, which outperformed other compared models, and produced a MAE of 3.1 L/s and 3.0 L/s for training and test set respectively, which represented about 12% of average consumption. DOI: 10.1061/(ASCE)WR.1943-5452.0000177. (C) 2012 American Society of Civil Engineers.
Resumo:
An experimental study on Vortex-Induced Motion (VIM) of the semi-submersible platform concept with four square columns is presented. Model tests were carried out to check the influence of different headings and hull appendages (riser supports located at the pontoons; fairleads and the mooring stretches located vertically at the external column faces; and hard pipes located vertically at the internal column faces). The results comprise in-line, transverse and yaw motions, as well as combined motions in the XY plane, drag and lift forces and spectral analysis. The main results showed that VIM in the transverse direction occurred in a range of reduced velocity 4.0 up to 14.0 with amplitude peaks around reduced velocities around 7.0 and 8.0. The largest transverse amplitudes obtained were around 40% of the column width for 30 degrees and 45 degrees incidences. Another important result observed was a considerable yaw motion oscillation, in which a synchronization region could be identified as a resonance phenomenon. The largest yaw motions were verified for the 0 degrees incidence and the maxima amplitudes around 4.5 degrees. The hull appendages located at columns had the greatest influence on the VIM response of the semi-submersible. (C) 2012 Elsevier Ltd. All rights reserved.
Resumo:
A number of autonomous underwater vehicles, AUV, are equipped with commercial ducted propellers, most of them produced originally for the remote operated vehicle, ROV, industry. However, AUVs and ROVs are supposed to work quite differently since the ROV operates in almost the bollard pull condition, while the AUV works at larger cruising speeds. Moreover, they can have an influence in the maneuverability of AUV due to the lift the duct generates in the most distant place of the vehicle's center of mass. In this work, it is proposed the modeling of the hydrodynamic forces and moment on a duct propeller according to a numerical (CFD) simulation, and analytical and semi-empirical, ASE, approaches. Predicted values are compared to experimental results produced in a towing tank. Results confirm the advantages of the symbiosis between CFD and ASE methods for modeling the influence of the propeller duct in the AUV maneuverability. (C) 2012 Elsevier Ltd. All rights reserved.
Resumo:
This paper reports the results of full-scale tests in beam-to-column connections for composite slim floor systems, including tests on Bare Steel connection and composite connection. The tested system consists of a concrete-filled composite column and a composite floor where an asymmetric steel beam is connected to a composite column by shear steel plates. Tests results previously obtained on partially encased composite beams were used to define the position of the headed studs in the slim floor system. Based on the obtained results of connections, the composite and Bare Steel connection behaved as semi-rigid and nominally pinned respectively. The tests results also indicated a significant contribution of the slim floor to the moment capacity of the connection. (C) 2011 Elsevier Ltd. All rights reserved.
Resumo:
This paper presents preliminary results to determine small displacements of a global positioning system (GPS) antenna fastened to a structure using only one L1 GPS receiver. Vibrations, periodic or not, are common in large structures, such as bridges, footbridges, tall buildings, and towers under dynamic loads. The behavior in time and frequency leads to structural analysis studies. The hypothesis of this article is that any large structure that presents vibrations in the centimeter-to-millimeter range can be monitored by phase measurements of a single L1 receiver with a high data rate, as long as the direction of the displacement is pointing to a particular satellite. Within this scenario, the carrier phase will be modulated by antenna displacement. During a period of a few dozen seconds, the relative displacement to the satellite, the satellite clock, and the atmospheric phase delays can be assumed as a polynomial time function. The residuals from a polynomial adjustment contain the phase modulation owing to small displacements, random noise, receiver clock short time instabilities, and multipath. The results showed that it is possible to detect displacements of centimeters in the phase data of a single satellite and millimeters in the difference between the phases of two satellites. After applying a periodic nonsinusoidal displacement of 10 m to the antenna, it is clearly recovered in the difference of the residuals. The time domain spectrum obtained by the fast Fourier transform (FFT) exhibited a defined peak of the third harmonic much more than the random noise using the proposed third-degree polynomial model. DOI: 10.1061/(ASCE)SU.1943-5428.0000070. (C) 2012 American Society of Civil Engineers.
Resumo:
Binary and ternary systems of Ni2+, Zn2+, and Pb2+ were investigated at initial metal concentrations of 0.5, 1.0 and 2.0 mM as competitive adsorbates using Arthrospira platensis and Chlorella vulgaris as biosorbents. The experimental results were evaluated in terms of equilibrium sorption capacity and metal removal efficiency and fitted to the multi-component Langmuir and Freundlich isotherms. The pseudo second order model of Ho and McKay described well the adsorption kinetics, and the FT-IR spectroscopy confirmed metal binding to both biomasses. Ni2+ and Zn2+ interference on Pb2+ sorption was lower than the contrary, likely due to biosorbent preference to Pb. In general, the higher the total initial metal concentration, the lower the adsorption capacity. The results of this study demonstrated that dry biomass of C. vulgaris behaved as better biosorbent than A. platensis and suggest its use as an effective alternative sorbent for metal removal from wastewater. (C) 2012 Elsevier B.V. All rights reserved.
Resumo:
Produced water in oil fields is one of the main sources of wastewater generated in the industry. It contains several organic compounds, such as benzene, toluene, ethyl benzene and xylene (BTEX), whose disposal is regulated by law. The aim of this study is to investigate a treatment of produced water integrating two processes, i.e., induced air flotation (IAF) and photo-Fenton. The experiments were conducted in a column flotation and annular lamp reactor for flotation and photodegradation steps, respectively. The first order kinetic constant of IAF for the wastewater studied was determined to be 0.1765 min(-1) for the surfactant EO 7. Degradation efficiencies of organic loading were assessed using factorial planning. Statistical data analysis shows that H2O2 concentration is a determining factor in process efficiency. Degradations above 90% were reached in all cases after 90 min of reaction, attaining 100% mineralization in the optimized concentrations of Fenton reagents. Process integration was adequate with 100% organic load removal in 20 min. The results of the integration of the IAF with the photo-Fenton allowed to meet the effluent limits established by Brazilian legislation for disposal. (C) 2011 Elsevier B.V. All rights reserved.
Resumo:
The results of a pedagogical strategy implemented at the University of Sao Paulo at Sao Carlos are presented and discussed. The initiative was conducted in a transportation course offered to Civil Engineering students. The approach is a combination of problem-based learning and project-based learning (PBL) and blended-learning (B-learning). Starting in 2006, a different problem was introduced every year. From 2009 on, however, the problem-based learning concept was expanded to project-based learning. The performance of the students was analyzed using the following elements: (1) grades in course activities; (2) answers from a questionnaire designed for course evaluation; and (3) cognitive maps made to assess the effects of PBL through the comparison of the responses provided by the students involved and those not involved in the experiment. The results showed positive aspects of the method, such as a strong involvement of several students with the subject. A gradual increase in the average scores obtained by the students in the project activities (from 6.77 in 2006 to 8.24 in 2009) was concomitant with a better evaluation of these activities and of the course as a whole (90 and 97% of options "Good" or "Very good" in 2009, respectively). A growing interest in the field of transportation engineering as an alternative for further studies was also noticed. DOI: 10.1061/(ASCE)EI.1943-5541.0000115. (C) 2012 American Society of Civil Engineers.