22 resultados para timetable
em Queensland University of Technology - ePrints Archive
Resumo:
From the business viewpoint, the railway timetable is a list of the products presented by the railway transportation operators to the customers, specifying the schedules of all the train services on a railway line or network. In order to evaluate the quality of the train service schedules, a number of indices are proposed in this paper. These indices primarily take the passengers’ needs, such as waiting time, transfer time and transport capacity into consideration. Delay rate is usually used in post-evaluation. In this study, we propose to give an evaluation on the probability that the scheduled train services are likely to be delayed and the recovery ability of the timetable after delay has occurred. The evaluation identifies the possible problems in the services, such as excessive waiting time, non-seamless transfer, and high possibility of delay. This paper also discusses the improvement of these problems through certain adjustments on the timetable. The indices for evaluation and the adjustment method on timetable are then applied to a case study on the Hu-Ning-Hang railway in China, followed by the discussions of the merits of the proposed indices for timetable evaluation and possible improvement.
Resumo:
Teaching literacy requires accurate and current knowledge in the field (Commonwealth of Australia, 2005). There have been persistent inquiries into what constitutes specialist knowledge and skills for teaching students to be literate. Preservice teacher education is fundamental to literacy development, which includes the approaches universities employ to prepare graduates for teaching literacy. Indeed, preservice teacher programs and literacy education also elicit insatiable media coverage. There is a continued push to improve literacy outcomes for school students across the nation and prepare the literacy knowledge and skills of Australian teachers. This study mainly focuses on 10 final-year preservice teachers attending a regional university campus who volunteered for further experiences to teach students to read traditional texts. These preservice teachers completed three university literacy units before commencing with practical applications. A literacy program, titled Reading Squadron, was developed in partnership between a local primary school and the university. Primary students were identified by the school as requiring literacy support. Preservice teachers attended a whole day training session run by school staff at the university and then visited the school for two one-hour sessions each week over a six-week period. Each preservice teacher was assigned two students and worked with each student for half an hour twice a week. The aim of this small-scale qualitative study was to investigate the perceptions of the preservice teachers and school staff as a result of their involvement in the Reading Squadron program. The preservice teachers completed a questionnaire to determine their views of the program and ascertain how it assisted their development. Further data were gathered from the preservice teachers through individual face-to-face interviews. Three school staff involved in the program also completed a questionnaire to determine the value of the program. Results indicated that the preservice teachers made links between theory and practice, and felt they gained knowledge about teaching reading. Three preservice teachers noted it was difficult to work around timetable commitments but gained from the experience and suggested embedding such experiences into university literacy units. Data gathered from school staff indicated that six-weeks was not sufficient time to measure improvements in the school students, however, they were supportive of such a program, particularly for its continuation. Collaborations between schools and universities can provide opportunities for preservice teachers to use theoretical knowledge gained from core university subjects with application to assist primary students’ literacy development in schools. Teachers in this study were supportive of the Reading Squadron program, however, more data needed to be collected to understand the literacy improvement of students. Longitudinal studies are required to ascertain specific knowledge and skills gained by preservice teachers to teach reading and how these programs enhance students’ literacy levels.
Resumo:
There has been increased research interest in Co-operative Vehicle Infrastructure Systems (CVIS) from the eld of Intelligent Transport Systems (ITS). However most of the research have focused on the engineering aspects and overlooked their relevance to the drivers' behaviour. This paper argues that the priority for cooperative systems is the need to improve drivers decision making and reduce drivers' crash risk exposure to improve road safety. Therefore any engineering solutions need to be considered in conjuction with traffic psychology theories on driver behaviour. This paper explores the advantages and limitations of existing systems and emphasizes various theoretical issues that arise in articulating cooperative systems' capabilities and drivers' behaviour.
Resumo:
In an open railway access market, the Infrastructure Provider (IP), upon the receipts of service bids from the Train Service Providers (TSPs), assigns track access rights according to its own business objectives and the merits of the bids; and produces the train service timetable through negotiations. In practice, IP chooses to negotiate with the TSPs one by one in such a sequence that IP optimizes its objectives. The TSP bids are usually very complicated, containing a large number of parameters in different natures. It is a difficult task even for an expert to give a priority sequence for negotiations from the contents of the bids. This study proposes the application of fuzzy ranking method to compare and prioritize the TSP bids in order to produce a negotiation sequence. The results of this study allow investigations on the behaviors of the stakeholders in bid preparation and negotiation, as well as evaluation of service quality in the open railway market.
Resumo:
The track allocation problem (TAP) at a multi-track, multi-platform mainline railway station is defined by the station track layout and service timetable, which implies combinations of spatial and temporal conflicts. Feasible solutions are available from either traditional planning or advanced intelligent searching methods and their evaluations with respect to operational requirements are essential for the operators. To facilitate thorough analysis, a timed Coloured Petri Nets (CPN) model is presented here to encapsulate the inter-relationships of the spatial and temporal constraints in the TAP.
Resumo:
Planning on utilization of train-set is one of the key tasks of transport organization for passenger dedicated railway in China. It also has strong relationships with timetable scheduling and operation plans at a station. To execute such a task in a railway hub pooling multiple railway lines, the characteristics of multiple routing for train-set is discussed in term of semicircle of train-sets' turnover. In programming the described problem, the minimum dwell time is selected as the objectives with special derive constraints of the train-set's dispatch, the connecting conditions, the principle of uniqueness for train-sets, and the first plus for connection in the same direction based on time tolerance σ. A compact connection algorithm based on time tolerance is then designed. The feasibility of the model and the algorithm is proved by the case study. The result indicates that the circulation model and algorithm about multiple routing can deal with the connections between the train-sets of multiple directions, and reduce the train's pulling in or leaving impact on the station's throat.
Resumo:
Railway timetabling is an important process in train service provision as it matches the transportation demand with the infrastructure capacity while customer satisfaction is also considered. It is a multi-objective optimisation problem, in which a feasible solution, rather than the optimal one, is usually taken in practice because of the time constraint. The quality of services may suffer as a result. In a railway open market, timetabling usually involves rounds of negotiations among a number of self-interested and independent stakeholders and hence additional objectives and constraints are imposed on the timetabling problem. While the requirements of all stakeholders are taken into consideration simultaneously, the computation demand is inevitably immense. Intelligent solution-searching techniques provide a possible solution. This paper attempts to employ a particle swarm optimisation (PSO) approach to devise a railway timetable in an open market. The suitability and performance of PSO are studied on a multi-agent-based railway open-market negotiation simulation platform.
Resumo:
In this paper, a generic and flexible optimisation methodology is developed to represent, model, solve and analyse the iron ore supply chain system by integrating of iron ore shipment, stockpiles and railing within a whole system. As a result, an integrated train-stockpile-ship timetable is created and optimised for improving efficiency of overall supply chain system. The proposed methodology provides better decision making on how to significantly improve rolling stock utilisation with the best cost-effectiveness ratio. Based on extensive computational experiments and analysis, insightful and quantitative advices are suggested for iron ore mine industry practitioners. The proposed methodology contributes to the sustainability of the environment by reducing pollution due to better utilisation of transportation resources and fuel.
Resumo:
The paper investigates train scheduling problems when prioritised trains and non-prioritised trains are simultaneously traversed in a single-line rail network. In this case, no-wait conditions arise because the prioritised trains such as express passenger trains should traverse continuously without any interruption. In comparison, non-prioritised trains such as freight trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available, which is thought of as a relaxation of no-wait conditions. With thorough analysis of the structural properties of the No-Wait Blocking Parallel-Machine Job-Shop-Scheduling (NWBPMJSS) problem that is originated in this research, an innovative generic constructive algorithm (called NWBPMJSS_Liu-Kozan) is proposed to construct the feasible train timetable in terms of a given order of trains. In particular, the proposed NWBPMJSS_Liu-Kozan constructive algorithm comprises several recursively-used sub-algorithms (i.e. Best-Starting-Time-Determination Procedure, Blocking-Time-Determination Procedure, Conflict-Checking Procedure, Conflict-Eliminating Procedure, Tune-up Procedure and Fine-tune Procedure) to guarantee feasibility by satisfying the blocking, no-wait, deadlock-free and conflict-free constraints. A two-stage hybrid heuristic algorithm (NWBPMJSS_Liu-Kozan-BIH) is developed by combining the NWBPMJSS_Liu-Kozan constructive algorithm and the Best-Insertion-Heuristic (BIH) algorithm to find the preferable train schedule in an efficient and economical way. Extensive computational experiments show that the proposed methodology is promising because it can be applied as a standard and fundamental toolbox for identifying, analysing, modelling and solving real-world scheduling problems.
Resumo:
Traffic safety studies demand more than what current micro-simulation models can provide as they presume that all drivers of motor vehicles exhibit safe behaviours. Several car-following models are used in various micro-simulation models. This research compares the mainstream car following models’ capabilities of emulating precise driver behaviour parameters such as headways and Time to Collisions. The comparison firstly illustrates which model is more robust in the metric reproduction. Secondly, the study conducted a series of sensitivity tests to further explore the behaviour of each model. Based on the outcome of these two steps exploration of the models, a modified structure and parameters adjustment for each car-following model is proposed to simulate more realistic vehicle movements, particularly headways and Time to Collision, below a certain critical threshold. NGSIM vehicle trajectory data is used to evaluate the modified models performance to assess critical safety events within traffic flow. The simulation tests outcomes indicate that the proposed modified models produce better frequency of critical Time to Collision than the generic models, while the improvement on the headway is not significant. The outcome of this paper facilitates traffic safety assessment using microscopic simulation.
Resumo:
Organizations invest heavily in Supply Chain Management Systems expecting the benefits promised by the software vendors and the implementation partners. However, both academic and industry reports suggest that there is growing dissatisfaction among client organizations due to an increasing gap in benefits purported by the software vendors and benefits realised by the client. In order to better manage expectations of the client organization, this study proposes a Benefit Expectation Management Framework for Supply Chain Management Systems, based on Expectation-Confirmation Theory. This study derives 60 expected benefits of Supply Chain Management Systems through 41 vendor-reported customer stories and academic papers. Through comparing those benefits with the received benefits by a case organization that has implemented SAP Supply Chain Management Systems for seven years, two salient factors – long timetable and multiple stakeholders – have been identified as the controlling factors affecting the confirmation level of Supply Chain Management System expectations and further impacting the satisfaction of a client organization. The case study also highlights the likely causes for realized benefits and enduring issues in relation to the Supply Chain Management Systems.
Resumo:
Aim: To describe the positioning of patients managed in an intensive care unit (ICU); assess how frequently these patients were repositioned; and determine if any specific factors influenced how, why or when patients were repositioned in the ICU. Background: Alterations in body position of ICU patients are important for patient comfort and are believed to prevent and/or treat pressure ulcers, improve respiratory function and combat the adverse effects of immobility. There is a paucity of research on the positioning of critically ill patients in Saudi Arabian ICUs. Design and Methods: A prospective observational study was undertaken. Participant demographic data were collected as were clinical factors (i.e. ventilation status, primary diagnosis, co-morbidities and Ramsay sedation score) and organizational factors (i.e. time of day, type of mattress or beds used, nurse/patient ratio and the patient's position). Clinical and some organization data were recorded over a continuous 48 hour period. Result: Twenty-eight participants were recruited to the study. No participant was managed in either a flat or prone position. Obese participants were most likely to be managed in a supine position. The mean time between turns was two hours. There was no significant association between the mean time between turns and the recorded variables related to patients' demographic and organizational considerations. Conclusion: Results indicate that patient positioning in the ICU was a direct result of unit policy - it appeared that patients were not repositioned based upon evaluation of their clinical condition but rather according to a two-hour ICU timetable
Resumo:
Eco-driving instructions could reduce fuel consumption to up to 20% (EcoMove, 2010). Participants (N=13) drove an instrumented vehicle (i.e. Toyota Camry 2007) with an automatic transmission. Fuel consumption of the participants were compared before and after they received eco-driving instructions. Participants drove the same vehicle on the same urban route under similar traffic conditions. Results show that, on free flow sections of the track, all participants drove slightly faster (on average, 0.7 Km/h faster), during the lap for which they were instructed to drive in an eco-friendly manner as compared to when they were not given the eco-driving instruction. Suprisingly, eco-driving instructions increased the RPM significantly in most cases. Fuel consumption slightly decreased (6%) after the eco-driving instructions. We have found strong evidence showing that the fuel saving observed in our experiment (urban environment, automatic transmission) fall short of the 20% reduction claimed in other international trials.
Resumo:
OBJECTIVE: School-aged youth spend a significant amount of time either in transit to and from school, or within school settings performing a range of varying learning-based activities. Adolescent physical activity has also been shown to increase the likelihood of maintaining physical activity throughout adulthood. The purpose of this study is to investigate adolescents’ perceived school-based barriers and facilitators to engagement in physical activity. METHODS: One-hundred and twenty four participants (38 males and 86 females) were recruited from two non-denominational same-sex private schools, in Brisbane, Australia. The mean age and standard deviation (SD) was 13.83 (0.56) and 14.40 (2.33) for males and females respectively. Participants responded to a series questions regarding perceived barriers and facilitators to engagement in physical activity. Quantitative data was analysed using descriptive statistics and frequency distributions, and qualitative data with thematic analysis. RESULTS: A total of 121 (97.6%) participants had complete data sets and were included in the analysis. School timetable (44.6%), homework (81.8%), and assessment (81.0%) were identified as the most prominent perceived factors, increasing the difficulty of physical activity engagement. Physical Education classes (71.9%) and school sport programs (80.2%) were identified as the most prominent perceived factors that facilitate engagement in physical activity. There was no significant gender effect. CONCLUSIONS: Each of the identified factors perceived by adolescent's as either barriers or facilitators to engagement in physical activity may be addressed by administrators at a school and government policy level. These may include strategies such as; increasing the assigned hours to physical education classes, providing additional extra-curricular sporting opportunities, and reviewing the time allocated to homework and assessment items. This may provide a simpler, low-cost solution to increasing youth physical activity, as opposed to contemporary higher-cost strategies utilising increased staff commitment, mass media, provision of equipment and counsellors and other health professionals.