883 resultados para contract design

em Queensland University of Technology - ePrints Archive


Relevância:

40.00% 40.00%

Publicador:

Resumo:

For design-build (DB) projects, owners normally use lump sum and Guaranteed Maximum Price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners’ selection of contract arrangement. Project information from Design-build Institute of America (DBIA) database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump sum contract. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently; and qualification-oriented contractor selection process resorts to GMP more often compared with cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many studies have been carried out in relation to construction procurement methods. Evidence shows that there needs to be a change of culture and attitude in the construction industry, moving away from traditional adversarial relationship into cooperative and collaborative relationship. At the same time there is also an increasing concern and discussion on alternative procurement methods, drifting away from traditional procurement systems. Relational contracting approaches have become more popular in recent years, and have appeared in common forms such as partnering, alliancing and relationship management contracts. This paper reports the findings of a survey undertaken with a private organisation based on an alliance project during its design stage, identifying the critical factors that influence the success of the alliance project. Legal aspects focusing on dispute resolution in alliancing are also highlighted.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The transformation of China's urban landscape has witnessed a boom in cultural adaptation, namely the adaptation of a Western idea, the creative cluster. This chapter examines the formatting of hundreds of creative clusters-art centres, animation bases, cultural zones, and incubators. The cluster has important implications for how we understand China going forward into the second decade of the 21st century. The cluster phenomenon has resulted in to a substantive remaking of the social contract, between officials, entrepreneurs, local residents, academics-and most significantly cultural producers. However, these processes of adaption are mostly driven by real estate developers working in partnership with local government officials. Cut and paste design is the fast road to completion. In this sense, the description 'creative' may well be redundant.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The psychological contract has emerged over the past 60 years as a key analytical device for both academics and practitioners to conceptualise and explain the employment relationship. However, despite the recognised import of this field, some authors suggest it has fallen into a ‘methodological rut’ and is neglecting to empirically assess basic theoretical tenets of the concept – such as the temporal and individualised, subjective nature of the construct. This paper describes the research design of a longitudinal, mixed methods study to explore development and change in the psychological contract and outline how the use of individual growth modelling can be a powerful tool in analysing the type of quantitative data collected. Finally, by briefly outlining the benefits of this approach, the paper seeks to offer an alternative methodology to explore the dynamic and intra-individual processes within the psychological contract domain.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The psychological contract is a key analytical device utilised by both academics and practitioners to conceptualise and explore the dynamics of the employment relationship. However, despite the recognised import of the construct, some authors suggest that its empirical investigation has fallen into a 'methodological rut' [Conway & Briner, 2005, p. 89] and is neglecting to assess key tenets of the concept, such as its temporal and dynamic nature. This paper describes the research design of a longitudinal, mixed methods study which draws upon the strengths of both qualitative and quantitative modes of inquiry in order to explore the development of, and changes in, the psychological contract. Underpinned by a critical realist philosophy, the paper seeks to offer a research design suitable for exploring the process of change not only within the psychological contract domain, but also for similar constructs in the human resource management and broader organisational behaviour fields.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Selecting an appropriate design-builder is critical to the success of DB projects. The objective of this study is to identify selection criteria for design-builders and compare their relative importance by means of a robust content analysis of 94 Request For Proposals (RFPs) for public DB projects. These DB projects had an aggregate contract value of over US$3.5 billion and were advertised between 2000 and 2010. This study summarized twenty-six selection criteria and classified into ten categories, i.e.: price, experience, technical approach, management approach, qualification, schedule, past performance, financial capability, responsiveness to the RFP, and legal status in descending order of their relative importance. The results showed that even though price still remains as the most important selection category, its relative importance declines significantly in the last decade. The categories of qualification, experience, past performance, by contrast, have been becoming more important to DB owners for selecting design-builders. Finally, it is found that the importance weighting of price in large projects is significantly higher than that in small projects. This study provides a useful reference for owners in selecting their preferred design-builders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose-- DB clients play a vital role in the delivery of DB system and the clients’ competences are critical to the success of DB projects. Most of DB clients, however, remain inexperienced with the DB system. This study, therefore, aims to identify the key competences that DB clients should possess to ensure the success of DB projects in the construction market of China. Design/Methodology/Approach -- Five semi-structured face-to-face interviews and two rounds Delphi questionnaire survey were conducted in the construction market of China to identify the key competences of DB clients. Rankings have been assigned to these key competences on the basis of their relative importance. Findings-- Six ranked key competences of DB clients have been identified, which are, namely, (1) the ability to clearly define project scope and objectives; (2) financial capacity for the projects; (3) capacity in contract management; (4) adequate staff or consulting team; (5) effective coordination with DB contractors and (6) experience with similar design-build projects. Calculation of Kendall’s Coefficient of Concordance (W) indicates a statistically significant consensus of panel experts on these top six key competences. Practical implications—Clients should clearly understand the competence requirements in DB projects and should assess their DB capability before going for the DB option. Originality/Value-- The examination of DB client’s key competences will help the client deepen the understanding of the DB system. DB clients can also make use of the research findings as guidelines to improve their DB competence.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The overall objective of this thesis is to explore how and why the content of individuals' psychological contracts changes over time. The contract is generally understood as "individual beliefs, shaped by the organisation, regarding the terms of an exchange agreement between individuals and their organisation" (Rousseau, 1995, p. 9). With an overall study sampling frame of 320 graduate organisational newcomers, a mixed method longitudinal research design comprised of three sequential, inter-related studies is employed in order to capture the change process. From the 15 semi-structured interviews conducted in Study 1, the key findings included identifying a relatively high degree of mutuality between employees' and their managers' reciprocal contract beliefs around the time of organisational entry. Also, at this time, individuals had developed specific components of their contract content through a mix of social network information (regarding broader employment expectations) and perceptions of various elements of their particular organisation's reputation (for more firm-specific expectations). Study 2 utilised a four-wave survey approach (available to the full sampling frame) over the 14 months following organisational entry to explore the 'shape' of individuals' contract change trajectories and the role of four theorised change predictors in driving these trajectories. The predictors represented an organisational-level informational cue (perceptions of corporate reputation), a dyadic-level informational cue (perceptions of manager-employee relationship quality) and two individual difference variables (affect and hardiness). Through the use of individual growth modelling, the findings showed differences in the general change patterns across contract content components of perceived employer (exhibiting generally quadratic change patterns) and employee (exhibiting generally no-change patterns) obligations. Further, individuals differentially used the predictor variables to construct beliefs about specific contract content. While both organisational- and dyadic-level cues were focused upon to construct employer obligation beliefs, organisational-level cues and individual difference variables were focused upon to construct employee obligation beliefs. Through undertaking 26 semi-structured interviews, Study 3 focused upon gaining a richer understanding of why participants' contracts changed, or otherwise, over the study period, with a particular focus upon the roles of breach and violation. Breach refers to an employee's perception that an employer obligation has not been met and violation refers to the negative and affective employee reactions which may ensue following a breach. The main contribution of these findings was identifying that subsequent to a breach or violation event a range of 'remediation effects' could be activated by employees which, depending upon their effectiveness, served to instigate either breach or contract repair or both. These effects mostly instigated broader contract repair and were generally cognitive strategies enacted by an individual to re-evaluate the breach situation and re-focus upon other positive aspects of the employment relationship. As such, the findings offered new evidence for a clear distinction between remedial effects which serve to only repair the breach (and thus the contract) and effects which only repair the contract more broadly; however, when effective, both resulted in individuals again viewing their employment relationships positively. Overall, in response to the overarching research question of this thesis, how and why individuals' psychological contract beliefs change, individuals do indeed draw upon various information sources, particularly at the organisational-level, as cues or guides in shaping their contract content. Further, the 'shapes' of the changes in beliefs about employer and employee obligations generally follow different, and not necessarily linear, trajectories over time. Finally, both breach and violation and also remedial actions, which address these occurrences either by remedying the breach itself (and thus the contract) or the contract only, play central roles in guiding individuals' contract changes to greater or lesser degrees. The findings from the thesis provide both academics and practitioners with greater insights into how employees construct their contract beliefs over time, the salient informational cues used to do this and how the effects of breach and violation can be mitigated through creating an environment which facilitates the use of effective remediation strategies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reports on a study of the voluntary provision of inclusive housing. The impetus for the study is the Livable Housing Design initiative, an agreement among Australian housing industry and community leaders in 2010 to a national guideline and voluntary strategy with a target to provide minimum access features in all new housing by 2020. Situated in and around Brisbane, Australia, the study problematises the assumption that the housing industry will respond voluntarily; an assumption which this study concludes is unfounded. The Livable Housing Design initiative asks individual agents to consider the needs of people beyond the initial contract, to proceed with objective reasoning and to do the right thing voluntarily. Instead, the study found that interviewees focused on their immediate contractual obligations, were reluctant to change established practices and saw little reason to do more than was legally required of them. This paper argues that the highly-competitive and risk-averse nature of the industry works against a voluntary approach for inclusive housing and, if the 2020 target of the Livable Housing Design initiative is to be reached, a mandated approach through legislation will be necessary. The Livable Housing Design initiative, however, has an important role to play in preparing the Australian housing industry to accept further regulation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The type of contract model may have a significant influence on achieving project objectives, including environmental and climate change goals. This research investigates non-standard contract models impacting greenhouse gas emissions (GHG) in transport infrastructure construction in Australia. The research is based on the analysis of two case studies: an Early Contractor Involvement (ECI) contract and a Design and Construct (D&C) contract with GHG reduction requirements embedded in the contractor selection. Main findings support the use of ECIs for better integrating decisions made during the planning phase with the construction activities, and improve environmental outcomes while achieving financial and time savings. Key words: greenhouse gases reduction; road construction; contracting; ECI; D&C

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article discusses the design of interactive online activities that introduce problem solving skills to first year law students. They are structured around the narrative framework of ‘Ruby’s Music Festival’ where a young business entrepreneur encounters various issues when organising a music festival and students use a generic problem solving method to provide legal solutions. These online activities offer students the opportunity to obtain early formative feedback on their legal problem solving abilities prior to undertaking a later summative assessment task. The design of the activities around the Ruby narrative framework and the benefits of providing students with early formative feedback will be discussed.