4 resultados para boîte à outils

em Queensland University of Technology - ePrints Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper sets out to contribute to the literature on the design and the implementation of management control systems. To this end, we question what is discussed when a management control system is to be chosen and on what decision-making eventually rests. This study rests upon an ethnomethodology of the Salvation Army’s French branch. Operating in the dual capacity of a researcher and a counsellor to management, between 2000 and 2007, we have unrestricted access to internal data revealing the backstage of management control: discussions and interactions surrounding the choosing of control devices. We contribute to understanding the arising of a need for control, the steps and process followed to decide upon a management control system, and controls in nonprofits. [Cet article vise à contribuer à la littérature sur la mise en place des systèmes de contrôle de gestion. À cette fin, nous questionnons ce qui est discuté lors du choix d’un système de contrôle et sur quoi repose in fine la décision. Cet article est fondé sur une approche ethnométhodologique de l’Armée du Salut en France permise par notre double qualité de chercheurs mais également de conseiller auprès de la direction de l’organisation entre 2000 et 2007. Un accès illimité à des données internes nous permet ainsi de mettre en lumière les aspects méconnus et invisibles du contrôle de gestion : les discussions et interactions entourant le choix d’outils. Nous contribuons à la compréhension de l’émergence du besoin de contrôle, des étapes et du processus de choix d’outils et enfin du contrôle de gestion dans une organisation à but non lucratif.]

Relevância:

10.00% 10.00%

Publicador:

Resumo:

What is the secret mesmerism that death possesses and under the operation of which a modern architect – strident, confident, resolute – becomes rueful, pessimistic, or melancholic?1 Five years before Le Corbusier’s death at sea in 1965, the architect reluctantly agreed to adopt the project for L’Église Saint-Pierre de Firminy in Firminy-Vert (1960–2006), following the death of its original architect, André Sive, from leukemia in 1958.2 Le Corbusier had already developed, in 1956, the plan for an enclave in the new “green” Firminy town, which included his youth and culture center and a stadium and swimming pool; the church and a “boîte à miracles” near the youth center were inserted into the plan in the ’60s. (Le Corbusier was also invited, in 1962, to produce another plan for three Unités d’Habitation outside Firminy-Vert.) The Saint-Pierre church should have been the zenith of the quartet (the largest urban concentration of works by Le Corbusier in Europe, and what the architect Henri Ciriani termed Le Corbusier’s “acropolis”3) but in the early course of the project, Le Corbusier would suffer the diocese’s serial objections to his vision for the church – not unlike the difficulties he experienced with Notre Dame du Haut at Ronchamp (1950–1954) and the resistance to his proposed monastery of Sainte-Marie de la Tourette (1957–1960). In 1964, the bishop of Saint-Étienne requested that Le Corbusier relocate the church to a new site, but Le Corbusier refused and the diocese subsequently withdrew from the project. (With neither the approval, funds, nor the participation of the bishop, by then the cardinal archbishop of Lyon, the first stone of the church was finally laid on the site in 1970.) Le Corbusier’s ambivalence toward the project, even prior to his quarrels with the bishop, reveals...

Relevância:

10.00% 10.00%

Publicador:

Resumo:

L'intérêt suscité par la ré-ingénierie des processus et les technologies de l'information révèle l'émergence du paradigme du management par les processus. Bien que beaucoup d'études aient été publiées sur des outils et techniques alternatives de modélisation de processus, peu d'attention a été portée à l'évaluation post-hoc des activités de modélisation de processus ou à l'établissement de directives sur la façon de conduire efficacement une modélisation de processus. La présente étude a pour objectif de combler ce manque. Nous présentons les résultats d'une étude de cas détaillée, conduite dans une organisation leader australienne dans le but de construire un modèle de réussite de la modélisation des processus.