251 resultados para World Heritage Site

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Memory, time and metaphor are central triggers for artists in exploring and shaping their creative work. This paper examines the place of artists as ‘memory-keepers’, and ‘memory-makers’, in particular through engagement with the time-based art of site-specific performance. Naik Naik (Ascent) was a multi-site performance project in the historic setting of Melaka, Malaysia, and is partially recaptured through the presence and voices of its collaborating artists. Distilled from moments recalled, this paper seeks to uncover the poetics of memory to emerge from the project; one steeped in metaphor rather than narrative. It elicits some of the complex and interdependent layers of experience revealed by the artists in Naik Naik; cultural, ancestral, historical, personal, instinctual and embodied memories connected to sound, smell, touch, sensation and light, in a spatiotemporal context for which site is the catalyst. The liminal nature of memory at the heart of Naik Naik, provides a shared experience of past and present and future, performatively interwoven.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

World Heritage Landscapes (WHLs) are receiving increased attention from researchers, urban planners, managers, and policy makers and many heritage values and resources are becoming irreversibly lost. This phenomenon is especially prominent for WHLs located in cities, where greater development opportunities are involved. Decision making for sustainable urban landscape planning, conservation and management of WHLs often takes place from an economic perspective, especially in developing countries. This, together with the uncertain source of funding to cover WHL operating and maintenance costs, has resulted in many urban managers seeking private sector funding either in the form of visitor access fees or leasing part of the site for high-rental facilities such as five star hotels, clubs and expensive restaurants. For the former, this can result in low-income urban citizens being unable to afford the access fees and hence contradicting the principle of equal access for all; while, for the latter, the principle of open access for all is equally violated. To resolve this conflict, a game model is developed to determine how urban managers should allocate WHL spaces to maximize the combination of economic, social and ecological benefits and cultural values. A case study is provided of the Hangzhou's West Lake Scenic Area, a WHL located at the centre of Hangzhou city, in which several high-rental facilities have recently been closed down by the local authorities due to charges of elitism and misuse of public funds by government officials. The result shows that the best solution is to lease a small space with high rents and leave the remainder of the site to the public. This solution is likely to be applicable only in cities with a strong economy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Through its mandate to protect and preserve places of ‘outstanding universal value’, the World Heritage Convention provides an unlikely yet effective tool in global efforts to mitigate climate change. The practical efficacy of the Strategy to Assist States Parties to Implement Appropriate Management Responses (‘the Strategy’), which represents the World Heritage Committee’s primary response to the threats posed by climate change to World Heritage sites, is undermined by its weak stance on mitigation. This paper argues that the World Heritage Convention imposes stronger obligations on States Parties than those contained in the Strategy, including a duty on States Parties to commit to ‘deep cuts’ in greenhouse gas emissions. In order to ensure the continuing success of the World Heritage Convention States Parties must engage in extensive mitigation strategies without delay.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The focus of this paper is on two World Heritage Areas: the Great Barrier Reef in Queensland, Australia and the Everglades in Florida. While both are World Heritage listed by the UNESCO, the Everglades is on the "World Heritage in Danger" list and the Great Barrier Reef could be on this list within the next year if present pressures continue. This paper examines the planning approaches and governance structures used in these two areas (Queensland and Florida) to manage the growth and development pressures. To make the analysis manageable, given the scale of these World Heritage areas, case studies at the local government level will be used: the Cairns Regional Council in Queensland and Monroe County in Florida. The case study analysis will involve three steps: (1) examination of the various plans at the federal, state, local levels that impact upon environmental quality in the Great Barrier Reef and Everglades; (2) assessing the degree to which these plans have been implemented; and (3) determine if (and how) the plans have improved environmental quality. In addition to the planning analysis we will also examine the governance structures (Lebel et al. 2006) within which planning operates. In any comparative analysis context is important (Hantrais 2009). Contextual differences between Queensland and Florida have previously been examined by Sipe, et al. (2007) and will be used as the starting point for this analysis. Our operating hypothesis and preliminary analysis suggests that the planning approaches and governance structures used in Florida and Queensland are considerably different, but the environmental outcomes may be similar. This is based, in part, on Vella (2004) who did a comparative analysis of environmental practices in the sugar industry in Florida and Queensland. This research re-examines this hypothesis and broadens the focus beyond the sugar industry to growth and development more broadly.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sundarbans, a Ramsar and World Heritage site, is the largest single block of tidal halophytic mangrove forest in the world covering parts of Bangladesh and India. Natural mangroves were very common along the entire coast of Bangladesh. However, all other natural mangrove forests, including the Chakaria Sundarbans with 21,000 hectares of mangrove, have been cleared for shrimp cultivation. Against this backdrop, the Forest Department of Bangladesh has developed project design documents for a project called ‘Collaborative REDD+ Improved Forest Management (IFM) Sundarbans Project’ (CRISP) to save the only remaining natural mangrove forest of the country. This project, involving conservation of 412,000 ha of natural mangrove forests, is expected to generate, over a 30-year period, a total emissions reduction of about 6.4 million tons of CO2. However, the successful implementation of this project involves a number of critical legal and institutional issues. It may involve complex legal issues such as forest ownership, forest use rights, rights of local people and carbon rights. It may also involve institutional reforms. Ensuring good governance of the proposed project is very vital considering the failure of the Asian Development Bank (ADB) funded and Bangladesh Forest Department managed ‘Sundarbans Biodiversity Conservation Project’. Considering this previous experience, this paper suggests that a comprehensive legal and institutional review and reform is needed for the successful implementation of the proposed CRISP project. This paper argues that without ensuring local people’s rights and their participation, no project can be successful in the Sundarbans. Moreover, corruption of local and international officials may be a serious hurdle in the successful implementation of the project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sundarbans, a Ramsar and World Heritage site, is the largest single block of tidal halophytic mangrove forest in the world covering parts of Bangladesh and India. Natural mangroves were very common along the entire coast of Bangladesh. However, all other natural mangrove forests, including the Chakaria Sundarbans with 21,000 hectares of mangrove, have been cleared for shrimp cultivation. Against this backdrop, the Forest Department of Bangladesh has developed project design documents for a project called ‘Collaborative REDD+ Improved Forest Management (IFM) Sundarbans Project’ (CRISP) to save the only remaining natural mangrove forest of the country. This project, involving conservation of 412,000 ha of natural mangrove forests, is expected to generate, over a 30-year period, a total emissions reduction of about 6.4 million tons of CO2. However, the successful implementation of this project involves a number of critical legal and institutional issues. It may involve complex legal issues such as forest ownership, forest use rights, rights of local people and carbon rights. It may also involve institutional reforms. Ensuring good governance of the proposed project is very vital considering the failure of the Asian Development Bank (ADB) funded and Bangladesh Forest Department managed ‘Sundarbans Biodiversity Conservation Project’. Considering this previous experience, this paper suggests that a comprehensive legal and institutional review and reform is needed for the successful implementation of the proposed CRISP project. This paper argues that without ensuring local people’s rights and their participation, no project can be successful in the Sundarbans. Moreover, corruption of local and international officials may be a serious hurdle in the successful implementation of the project.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This thesis addresses the contemporary issue of the control, restoration and potential for reuse of State Government-owned heritage properties with commercial potential. It attempts to reconcile the sometimes competing interests of the range of stakeholders in such properties, particularly those seeking to maximise economic performance and return on one hand and community expectations for heritage preservation and exhibition on the other. The matters are approached principally from the Government's position as asset owner/manager. It includes research into a number of key elements - including statutory, physical and economic parameters and an analysis of the legitimate requirements of all stakeholders. The thesis also recognises the need for innovation in approach and for the careful structuring and pre-planning of proposals on a project-by-project basis. On the matter of innovation, four case studies are included in the thesis to exhibit some approaches and techniques that have already been employed in addressing these issues. From this research base, a series of deductions at both a macro and micro level are established and a model for a rational decision-making process for dealing with such projects is developed as a major outcome of the work. Finally, the general model is applied to a specific project, the currently unused Port Office heritage site in the Brisbane Central Business District.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This study focuses on designing a community environment education center (CEEC) for Chillingham, as a hub for community transition to sustainability, redressing social fragmentation, youth unemployment, a high eco-footprint and economic rural decline due to globalisation. The ecologically sustainable development framework was delivered by integrating environment education and community development through project-based experiential learning. The development of Chillingham Community Centre involved case study research and incorporated participatory design charrettes, transformative learning, eco-positive development and community-public-private partnerships. This process evolved from community strategic planning in a small rural village buffering world heritage rainforests impacted by a rapidly expanding urban conurbation on Australia’s east coast. This community space encompasses socio-environmental flows connecting people to each other and the ecoscape to grow natural capital, community cohesion and empower eco-governance. Modelling passive solar design, on-site renewable energy/water/nutrient cycling, community garden/market and environment education programs sowed the seeds for a green local economy, demonstrating community capacity to participate in transition to sustainability. A small rural community can demonstrate to other communities that a CEEC enables people to meet their socio-environmental and economic needs locally and sustainably. The ecologically sustainable solution is holistic, all settlements need to be richly biodiverse, locally specific and globally wise.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Histories of past communities are embedded in landscapes around the world but many are suffering from material change or neglect of their fabric. This study was aimed at discovering and representing the authentic intangible experience of two historic landscapes for conservation purposes. A 2500 year old site in Yangzhou, China and a 2000 year old site on St Helena Island in Moreton Bay were found to be managed under two culturally different regimes of authenticity. This research has contributed to challenging the notion that there is only one way to conserve authenticity in historic landscapes of the Asia Pacific.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Environmental impacts caused during Australia's comparatively recent settlement by Europeans are evident. Governments (both Commonwealth and States) have been largely responsible for requiring landholders – through leasehold development conditions and taxation concessions – to conduct clearing that is now perceived as damage. Most governments are now demanding resource protection. There is a measure of bewilderment (if not resentment) among landholders because of this change. The more populous States, where most overall damage has been done (i.e. Victoria and New South Wales), provide most support for attempts to stop development in other regions where there has been less damage. Queensland, i.e. the north-eastern quarter of the continent, has been relatively slow to develop. It also holds the largest and most diverse natural environments. Tree clearing is an unavoidable element of land development, whether to access and enhance native grasses for livestock or to allow for urban developments (with exotic tree plantings). The consequences in terms of regulations are particularly complex because of the dynamic nature of vegetation. The regulatory terms used in current legislation – such as 'Endangered' and 'Of concern' – depend on legally-defined, static baselines. Regrowth and fire damage are two obvious causes of change. A less obvious aspect is succession, where ecosystems change naturally over long timeframes. In the recent past, the Queensland Government encouraged extensive tree-clearing e.g. through the State Brigalow Development Scheme (mostly 1962 to 1975) which resulted in the removal of some 97% of the wide-ranging mature forests of Acacia harpophylla. At the same time, this government controls National Parks and other reservations (occupying some 4% of the State's 1.7 million km2 area) and also holds major World Heritage Areas (such as the Great Barrier Reef and the Wet Tropics Rainforest) promulgated under Commonwealth legislation. This is a highly prescriptive approach, where the community is directed on the one hand to develop (largely through lease conditions) and on the other to avoid development (largely by unusable reserves). Another approach to development and conservation is still possible in Queensland. For this to occur, however, a more workable and equitable solution than has been employed to date is needed, especially for the remote lands of this State. This must involve resident landholders, who have the capacity (through local knowledge, infrastructure and daily presence) to undertake most costeffectively sustainable land-use management (with suitable attention to ecosystems requiring special conservation effort), that is, provided they have the necessary direction, encouragement and incentive to do so.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

We describe the design, development and learnings from the first phase of a rainforest ecological sensor network at Springbrook - part of a World Heritage precinct in South East Queensland. This first phase is part of a major initiative to develop the capability to provide reliable, long-term monitoring of rainforest ecosystems. We focus in particular on our analysis around energy and communication challenges which need to be solved to allow for reliable, long-term deployments in these types of environments.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The feral pig, Sus scrofa, is a widespread and abundant invasive species in Australia. Feral pigs pose a significant threat to the environment, agricultural industry, and human health, and in far north Queensland they endanger World Heritage values of the Wet Tropics. Historical records document the first introduction of domestic pigs into Australia via European settlers in 1788 and subsequent introductions from Asia from 1827 onwards. Since this time, domestic pigs have been accidentally and deliberately released into the wild and significant feral pig populations have become established, resulting in the declaration of this species as a class 2 pest in Queensland. The overall objective of this study was to assess the population genetic structure of feral pigs in far north Queensland, in particular to enable delineation of demographically independent management units. The identification of ecologically meaningful management units using molecular techniques can assist in targeting feral pig control to bring about effective long-term management. Molecular genetic analysis was undertaken on 434 feral pigs from 35 localities between Tully and Innisfail. Seven polymorphic and unlinked microsatellite loci were screened and fixation indices (FST and analogues) and Bayesian clustering methods were used to identify population structure and management units in the study area. Sequencing of the hyper-variable mitochondrial control region (D-loop) of 35 feral pigs was also examined to identify pig ancestry. Three management units were identified in the study at a scale of 25 to 35 km. Even with the strong pattern of genetic structure identified in the study area, some evidence of long distance dispersal and/or translocation was found as a small number of individuals exhibited ancestry from a management unit outside of which they were sampled. Overall, gene flow in the study area was found to be influenced by environmental features such as topography and land use, but no distinct or obvious natural or anthropogenic geographic barriers were identified. Furthermore, strong evidence was found for non-random mating between pigs of European and Asian breeds indicating that feral pig ancestry influences their population genetic structure. Phylogenetic analysis revealed two distinct mitochondrial DNA clades, representing Asian domestic pig breeds and European breeds. A significant finding was that pigs of Asian origin living in Innisfail and south Tully were not mating randomly with European breed pigs populating the nearby Mission Beach area. Feral pig control should be implemented in each of the management units identified in this study. The control should be coordinated across properties within each management unit to prevent re-colonisation from adjacent localities. The adjacent rainforest and National Park Estates, as well as the rainforest-crop boundary should be included in a simultaneous control operation for greater success.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Feral pigs occur throughout tropical far north Queensland, Australia and are a significant threat to biodiversity and World Heritage values, agriculture and are a vector of infectious diseases. One of the constraints on long-lasting, local eradication of feral pigs is the process of reinvasion into recently controlled areas. This study examined the population genetic structure of feral pigs in far north Queensland to identify the extent of movement and the scale at which demographically independent management units exist. Genetic analysis of 328 feral pigs from the Innisfail to Tully region of tropical Queensland was undertaken. Seven microsatellite loci were screened and Bayesian clustering methods used to infer population clusters. Sequence variation at the mitochondrial DNA control region was examined to identify pig breed. Significant population structure was identified in the study area at a scale of 25 to 35 km, corresponding to three demographically independent management units (MUs). Distinct natural or anthropogenic barriers were not found, but environmental features such as topography and land use appear to influence patterns of gene flow. Despite the strong, overall pattern of structure, some feral pigs clearly exhibited ancestry from a MU outside of that from which they were sampled indicating isolated long distance dispersal or translocation events. Furthermore, our results suggest that gene flow is restricted among pigs of domestic Asian and European origin and non-random mating influences management unit boundaries. We conclude that the three MUs identified in this study should be considered as operational units for feral pig control in far north Queensland. Within a MU, coordinated and simultaneous control is required across farms, rainforest areas and National Park Estates to prevent recolonisation from adjacent localities.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.