232 resultados para Vertical take-off

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Consistency and invariance in movements are traditionally viewed as essential features of skill acquisition and elite sports performance. This emphasis on the stabilization of action has resulted in important processes of adaptation in movement coordination during performance being overlooked in investigations of elite sport performance. Here we investigate whether differences exist between the movement kinematics displayed by five, elite springboard divers (age 17 ± 2.4 years) in the preparation phases of baulked and completed take-offs. The two-dimensional kinematic characteristics of the reverse somersault take-off phases (approach and hurdle) were recorded during normal training sessions and used for intra-individual analysis. All participants displayed observable differences in movement patterns at key events during the approach phase; however, the presence of similar global topological characteristics suggested that, overall, participants did not perform distinctly different movement patterns during completed and baulked dives. These findings provide a powerful rationale for coaches to consider assessing functional variability or adaptability of motor behaviour as a key criterion of successful performance in sports such as diving.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present a pole inspection system for outdoor environments comprising a high-speed camera on a vertical take-off and landing (VTOL) aerial platform. The pole inspection task requires a vehicle to fly close to a structure while maintaining a fixed stand-off distance from it. Typical GPS errors make GPS-based navigation unsuitable for this task however. When flying outdoors a vehicle is also affected by aerodynamics disturbances such as wind gusts, so the onboard controller must be robust to these disturbances in order to maintain the stand-off distance. Two problems must therefor be addressed: fast and accurate state estimation without GPS, and the design of a robust controller. We resolve these problems by a) performing visual + inertial relative state estimation and b) using a robust line tracker and a nested controller design. Our state estimation exploits high-speed camera images (100Hz) and 70Hz IMU data fused in an Extended Kalman Filter (EKF). We demonstrate results from outdoor experiments for pole-relative hovering, and pole circumnavigation where the operator provides only yaw commands. Lastly, we show results for image-based 3D reconstruction and texture mapping of a pole to demonstrate the usefulness for inspection tasks.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis presents an approach for a vertical infrastructure inspection using a vertical take-off and landing (VTOL) unmanned aerial vehicle and shared autonomy. Inspecting vertical structure such as light and power distribution poles is a difficult task. There are challenges involved with developing such an inspection system, such as flying in close proximity to a target while maintaining a fixed stand-off distance from it. The contributions of this thesis fall into three main areas. Firstly, an approach to vehicle dynamic modeling is evaluated in simulation and experiments. Secondly, EKF-based state estimators are demonstrated, as well as estimator-free approaches such as image based visual servoing (IBVS) validated with motion capture ground truth data. Thirdly, an integrated pole inspection system comprising a VTOL platform with human-in-the-loop control, (shared autonomy) is demonstrated. These contributions are comprehensively explained through a series of published papers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We present an approach for the inspection of vertical pole-like infrastructure using a vertical take-off and landing (VTOL) unmanned aerial vehicle and shared autonomy. Inspecting vertical structures, such as light and power distribution poles, is a time consuming, dangerous and expensive task with high operator workload. To address these issues, we propose a VTOL platform that can operate at close-quarters, whilst maintaining a safe stand-off distance and rejecting environmental disturbances. We adopt an Image based Visual Servoing (IBVS) technique using only two line features to stabilise the vehicle with respect to a pole. Visual, inertial and sonar data are used, making the approach suitable for indoor or GPS-denied environments. Results from simulation and outdoor flight experiments demonstrate the system is able to successfully inspect and circumnavigate a pole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design and fabrication of a proto-type four-rotor vertical take-off and landing (VTOL) aerial robot for use as indoor experimental robotics platform is presented. The flyer is termed an X4-flyer. A development of the dynamic model of the system is presented and a pilot augmentation control design is proposed.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Buildings consume resources and energy, contribute to pollution of our air, water and soil, impact the health and well-being of populations and constitute an important part of the built environment in which we live. The ability to assess their design with a view to reducing that impact automatically from their 3D CAD representations enables building design professionals to make informed decisions on the environmental impact of building structures. Contemporary 3D object-oriented CAD files contain a wealth of building information. LCADesign has been designed as a fully integrated approach for automated eco-efficiency assessment of commercial buildings direct from 3D CAD. LCADesign accesses the 3D CAD detail through Industry Foundation Classes (IFCs) - the international standard file format for defining architectural and constructional CAD graphic data as 3D real-world objects - to permit construction professionals to interrogate these intelligent drawing objects for analysis of the performance of a design. The automated take-off provides quantities of all building components whose specific production processes, logistics and raw material inputs, where necessary, are identified to calculate a complete list of quantities for all products such as concrete, steel, timber, plastic etc and combines this information with the life cycle inventory database, to estimate key internationally recognised environmental indicators such as CML, EPS and Eco-indicator 99. This paper outlines the key modules of LCADesign and their role in delivering an automated eco-efficiency assessment for commercial buildings.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Abstract: Purpose – Several major infrastructure projects in the Hong Kong Special Administrative Region (HKSAR) have been delivered by the build-operate-transfer (BOT) model since the 1960s. Although the benefits of using BOT have been reported abundantly in the contemporary literature, some BOT projects were less successful than the others. This paper aims to find out why this is so and to explore whether BOT is the best financing model to procure major infrastructure projects. Design/methodology/approach – The benefits of BOT will first be reviewed. Some completed BOT projects in Hong Kong will be examined to ascertain how far the perceived benefits of BOT have been materialized in these projects. A highly profiled project, the Hong Kong-Zhuhai-Macau Bridge, which has long been promoted by the governments of the People's Republic of China, Macau Special Administrative Region and the HKSAR that BOT is the preferred financing model, but suddenly reverted back to the traditional financing model to be funded primarily by the three governments with public money instead, will be studied to explore the true value of the BOT financial model. Findings – Six main reasons for this radical change are derived from the analysis: shorter take-off time for the project; difference in legal systems causing difficulties in drafting BOT agreements; more government control on tolls; private sector uninterested due to unattractive economic package; avoid allegation of collusion between business and the governments; and a comfortable financial reserve possessed by the host governments. Originality/value – The findings from this paper are believed to provide a better understanding to the real benefits of BOT and the governments' main decision criteria in delivering major infrastructure projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In this paper, we seek to expand the use of direct methods in real-time applications by proposing a vision-based strategy for pose estimation of aerial vehicles. The vast majority of approaches make use of features to estimate motion. Conversely, the strategy we propose is based on a MR (Multi- Resolution) implementation of an image registration technique (Inverse Compositional Image Alignment ICIA) using direct methods. An on-board camera in a downwards-looking configuration, and the assumption of planar scenes, are the bases of the algorithm. The motion between frames (rotation and translation) is recovered by decomposing the frame-to-frame homography obtained by the ICIA algorithm applied to a patch that covers around the 80% of the image. When the visual estimation is required (e.g. GPS drop-out), this motion is integrated with the previous known estimation of the vehicles’ state, obtained from the on-board sensors (GPS/IMU), and the subsequent estimations are based only on the vision-based motion estimations. The proposed strategy is tested with real flight data in representative stages of a flight: cruise, landing, and take-off, being two of those stages considered critical: take-off and landing. The performance of the pose estimation strategy is analyzed by comparing it with the GPS/IMU estimations. Results show correlation between the visual estimation obtained with the MR-ICIA and the GPS/IMU data, that demonstrate that the visual estimation can be used to provide a good approximation of the vehicle’s state when it is required (e.g. GPS drop-outs). In terms of performance, the proposed strategy is able to maintain an estimation of the vehicle’s state for more than one minute, at real-time frame rates based, only on visual information.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This report looks at opportunities in relation to what is either already available or starting to take off in Information and Communication Technology (ICT). ICT focuses on the entire system of information, communication, processes and knowledge within an organisation. It focuses on how technology can be implemented to serve the information and communication needs of people and organisations. An ICT system involves a combination of work practices, information, people and a range of technologies and applications organised to make the business or organisation fully functional and efficient, and to accomplish goals in an organisation. Our focus is on vocational, workbased education in New Zealand. It is not about eLearning, although we briefly touch on the topic. We provide a background on vocational education in New Zealand, cover what we consider to be key trends impacting workbased, vocational education and training (VET), and offer practical suggestions for leveraging better value from ICT initiatives across the main activities of an Industry Training Organisation (ITO). We use a learning value chain approach to demonstrate the main functions ITOs engage in and also use this approach as the basis for developing and prioritising an ICT strategy. Much of what we consider in this report is applicable to the wider tertiary education sector as it relates to life-long learning. We consider ICT as an enabler that: a) connects education businesses (all types including tertiary education institutions) to learners, their career decisions and their learning, and as well, b) enables those same businesses to run more efficiently. We suggest that these two sets of activities are considered as interconnected parts of the same education or training business ICT strategy.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The success or effectiveness for any aircraft design is a function of many trade-offs. Over the last 100 years of aircraft design these trade-offs have been optimized and dominant aircraft design philosophies have emerged. Pilotless aircraft (or uninhabited airborne systems, UAS) present new challenges in the optimization of their configuration. Recent developments in battery and motor technology have seen an upsurge in the utility and performance of electric powered aircraft. Thus, the opportunity to explore hybrid-electric aircraft powerplant configurations is compelling. This thesis considers the design of such a configuration from an overall propulsive, and energy efficiency perspective. A prototype system was constructed using a representative small UAS internal combustion engine (10cc methanol two-stroke) and a 600W brushless Direct current (BLDC) motor. These components were chosen to be representative of those that would be found on typical small UAS. The system was tested on a dynamometer in a wind-tunnel and the results show an improvement in overall propulsive efficiency of 17% when compared to a non-hybrid powerplant. In this case, the improvement results from the utilization of a larger propeller that the hybrid solution allows, which shows that general efficiency improvements are possible using hybrid configurations for aircraft propulsion. Additionally this approach provides new improvements in operational and mission flexibility (such as the provision of self-starting) which are outlined in the thesis. Specifically, the opportunity to use the windmilling propeller for energy regeneration was explored. It was found (in the prototype configuration) that significant power (60W) is recoverable in a steep dive, and although the efficiency of regeneration is low, the capability can allow several options for improved mission viability. The thesis concludes with the general statement that a hybrid powerplant improves the overall mission effectiveness and propulsive efficiency of small UAS.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The overarching aim of this programme of work was to evaluate the effectiveness of the existing learning environment within the Australian Institute of Sport (AIS) elite springboard diving programme. Unique to the current research programme, is the application of ideas from an established theory of motor learning, specifically ecological dynamics, to an applied high performance training environment. In this research programme springboard diving is examined as a complex system, where individual, task, and environmental constraints are continually interacting to shape performance. As a consequence, this thesis presents some necessary and unique insights into representative learning design and movement adaptations in a sample of elite athletes. The questions examined in this programme of work relate to how best to structure practice, which is central to developing an effective learning environment in a high performance setting. Specifically, the series of studies reported in the chapters of this doctoral thesis: (i) provide evidence for the importance of designing representative practice tasks in training; (ii) establish that completed and baulked (prematurely terminated) take-offs are not different enough to justify the abortion of a planned dive; and (iii), confirm that elite athletes performing complex skills are able to adapt their movement patterns to achieve consistent performance outcomes from variable dive take-off conditions. Chapters One and Two of the thesis provide an overview of the theoretical ideas framing the programme of work, and include a review of literature pertinent to the research aims and subsequent empirical chapters. Chapter Three examined the representativeness of take-off tasks completed in the two AIS diving training facilities routinely used in springboard diving. Results highlighted differences in the preparatory phase of reverse dive take-offs completed by elite divers during normal training tasks in the dry-land and aquatic training environments. The most noticeable differences in dive take-off between environments began during the hurdle (step, jump, height and flight) where the diver generates the necessary momentum to complete the dive. Consequently, greater step lengths, jump heights and flight times, resulted in greater board depression prior to take-off in the aquatic environment where the dives required greater amounts of rotation. The differences observed between the preparatory phases of reverse dive take-offs completed in the dry-land and aquatic training environments are arguably a consequence of the constraints of the training environment. Specifically, differences in the environmental information available to the athletes, and the need to alter the landing (feet first vs. wrist first landing) from the take-off, resulted in a decoupling of important perception and action information and a decomposition of the dive take-off task. In attempting to only practise high quality dives, many athletes have followed a traditional motor learning approach (Schmidt, 1975) and tried to eliminate take-off variations during training. Chapter Four examined whether observable differences existed between the movement kinematics of elite divers in the preparation phases of baulked (prematurely terminated) and completed take-offs that might justify this approach to training. Qualitative and quantitative analyses of variability within conditions revealed greater consistency and less variability when dives were completed, and greater variability amongst baulked take-offs for all participants. Based on these findings, it is probable that athletes choose to abort a planned take-off when they detect small variations from the movement patterns (e.g., step lengths, jump height, springboard depression) of highly practiced comfortable dives. However, with no major differences in coordination patterns (topology of the angle-angle plots), and the potential for negative performance outcomes in competition, there appears to be no training advantage in baulking on unsatisfactory take-offs during training, except when a threat of injury is perceived by the athlete. Instead, it was considered that enhancing the athletes' movement adaptability would be a more functional motor learning strategy. In Chapter Five, a twelve-week training programme was conducted to determine whether a sample of elite divers were able to adapt their movement patterns and complete dives successfully, regardless of the perceived quality of their preparatory movements on the springboard. The data indeed suggested that elite divers were able to adapt their movements during the preparatory phase of the take-off and complete good quality dives under more varied take-off conditions; displaying greater consistency and stability in the key performance outcome (dive entry). These findings are in line with previous research findings from other sports (e.g., shooting, triple jump and basketball) and demonstrate how functional or compensatory movement variability can afford greater flexibility in task execution. By previously only practising dives with good quality take-offs, it can be argued that divers only developed strong couplings between information and movement under very specific performance circumstances. As a result, this sample was sometimes characterised by poor performance in competition when the athletes experienced a suboptimal take-off. Throughout this training programme, where divers were encouraged to minimise baulking and attempt to complete every dive, they demonstrated that it was possible to strengthen the information and movement coupling in a variety of performance circumstances, widening of the basin of performance solutions and providing alternative couplings to solve a performance problem even when the take-off was not ideal. The results of this programme of research provide theoretical and experimental implications for understanding representative learning design and movement pattern variability in applied sports science research. Theoretically, this PhD programme contributes empirical evidence to demonstrate the importance of representative design in the training environments of high performance sports programmes. Specifically, this thesis advocates for the design of learning environments that effectively capture and enhance functional and flexible movement responses representative of performance contexts. Further, data from this thesis showed that elite athletes performing complex tasks were able to adapt their movements in the preparatory phase and complete good quality dives under more varied take-off conditions. This finding signals some significant practical implications for athletes, coaches and sports scientists. As such, it is recommended that care should be taken by coaches when designing practice tasks since the clear implication is that athletes need to practice adapting movement patterns during ongoing regulation of multi-articular coordination tasks. For example, volleyball servers can adapt to small variations in the ball toss phase, long jumpers can visually regulate gait as they prepare for the take-off, and springboard divers need to continue to practice adapting their take-off from the hurdle step. In summary, the studies of this programme of work have confirmed that the task constraints of training environments in elite sport performance programmes need to provide a faithful simulation of a competitive performance environment in order that performance outcomes may be stabilised with practice. Further, it is apparent that training environments can be enhanced by ensuring the representative design of task constraints, which have high action fidelity with the performance context. Ultimately, this study recommends that the traditional coaching adage 'perfect practice makes perfect", be reconsidered; instead advocating that practice should be, as Bernstein (1967) suggested, "repetition without repetition".

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Cost estimating is a key task within Quantity Surveyors’ (QS) offices. Provision of an accurate estimate is vital to ensure that the objectives of the client are met by staying within the client’s budget. Building Information Modelling (BIM) is an evolving technology that has gained attention in the construction industries all over the world. Benefits from the use of BIM include cost and time savings if the processes used by the procurement team are adapted to maximise the benefits of BIM. BIM can be used by QSs to automate aspects of quantity take-off and the preparation of estimates, decreasing turnaround time and assist in controlling errors and inaccuracies. The Malaysian government has decided to require the use of BIM for its projects beginning from 2016. However, slow uptake is reported in the use of BIM both within companies and to support collaboration within the Malaysian industry. It has been recommended that QSs to start evaluating the impact of BIM on their practices. This paper reviews the perspectives of QSs in Malaysia towards the use of BIM to achieve more dependable results in their cost estimating practice. The objectives of this paper include identifying strategies in improving practice and potential adoption drivers that lead QSs to BIM usage in their construction projects. From the expert interviews, it was found out that, despite still using traditional methods and not practising BIM, the interviewees still acquire limited knowledge related to BIM. There are some drivers that potentially motivate them to employ BIM in their practices. These include client demands, innovation in traditional methods, speed in estimating costs, reduced time and costs, improvement in practices and self-awareness, efficiency in projects, and competition from other companies. The findings of this paper identify the potential drivers in encouraging Malaysian Quantity Surveyors to exploit BIM in their construction projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper analyses the performance of particular wave-energy converter that uses the gyroscopic effects of a large rotating fly-wheel in combination with a controlled power-take-off device. Controlled gyroscopic forces have been used successfully in the past to reduce the motion of marine structures. With appropriately designed power-take-off elements, gyroscopic forces can be controlled to optimise the extracted energy from the motion of marine structures.