128 resultados para Satisfaction Measurement Methods

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In general, the performance of construction projects, including their sustainability performance, does not meet optimal expectations. One aspect of this is the performance of the participants who are independent and make a significance impact on overall project outcomes. Of these participants, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely, time, cost and quality. As the level of satisfaction is a subjective issue, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in an attempt to determine the performance of construction project outcomes - for instance, client satisfaction, customer satisfaction, contractor satisfaction, occupant satisfaction and home buyer satisfaction. These not only identify the performance of the construction project but are also used to improve and maintain relationships. In addition, these assessments are necessary for the continuous improvement and enhanced cooperation of participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparative standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may possibly be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This chapter examines the methods commonly practised in measuring satisfaction levels today and the advantages of promoting these methods. The results provide a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods to use in identifying the performance of project outcomes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study considered factors influencing teachers' reporting of child sexual abuse (CSA). Conducted in three Australian jurisdictions with different reporting laws and policies, the study focused on teachers' actual past and anticipated future reporting of CSA. A sample of 470 teachers within randomly selected rural and urban schools was surveyed, to identify training and experience; knowledge of reporting legislation and policy; attitudes; and reporting practices. Factors influencing actual past reporting and anticipated future reporting were identified using logistic regression modelling. This is the first study to simultaneously examine the effect of important influences in reporting practice using both retrospective and prospective approaches across jurisdictions with different reporting laws. Teachers who have actually reported CSA in the past are more likely have higher levels of policy knowledge, and hold more positive attitudes towards reporting CSA along three specific dimensions: commitment to the reporting role; confidence in the system's effective response to their reporting; and they are more likely to be able to override their concerns about the consequences of their reporting. Teachers indicating intention to report hypothetical scenarios are more likely to hold reasonable grounds for suspecting CSA, to recognise that significant harm has been caused to the child, to know that their school policy requires a report, and to be able to override their concerns about the consequences of their reporting.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

It is recognized that, in general, the performance of construction projects does not meet optimal expectations. One aspect of this is the performance of each participant, which is interdependent and makes a significance impact on overall project outcomes. Of these, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely time, cost and quality. As the level of satisfaction is a subjective measurement, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in attempting to determine the performance of construction project outcomes – for instance client satisfaction, consultant satisfaction, contractor satisfaction, customer satisfaction and home buyer satisfaction. These not only identify the performance of the construction project, but are also used to improve and maintain relationships. In addition, these assessments are necessary for continuous improvement and enhanced cooperation between participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparison standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This paper examines the current methods commonly practiced in measuring satisfaction level and the advantages of promoting these methods. The results provided are a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods for use in identifying the performance of project outcomes.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In the study of complex neurobiological movement systems, measurement indeterminacy has typically been overcome by imposing artificial modelling constraints to reduce the number of unknowns (e.g., reducing all muscle, bone and ligament forces crossing a joint to a single vector). However, this approach prevents human movement scientists from investigating more fully the role, functionality and ubiquity of coordinative structures or functional motor synergies. Advancements in measurement methods and analysis techniques are required if the contribution of individual component parts or degrees of freedom of these task-specific structural units is to be established, thereby effectively solving the indeterminacy problem by reducing the number of unknowns. A further benefit of establishing more of the unknowns is that human movement scientists will be able to gain greater insight into ubiquitous processes of physical self-organising that underpin the formation of coordinative structures and the confluence of organismic, environmental and task constraints that determine the exact morphology of these special-purpose devices.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The evaluation of satisfaction levels related to performance is an important aspect in increasing market share, improving profitability and enlarging opportunities for repeat business and can lead to the determination of areas to be improved, improving harmonious working relationships and conflict avoidance. In the construction industry, this can also result in improved project quality, enhanced reputation and increased competitiveness. Many conceptual models have been developed to measure satisfaction levels - typically to gauge client satisfaction, customer satisfaction and home buyer satisfaction - but limited empirical research has been carried out, especially in investigating the satisfaction of construction contractors. In addressing this, this paper provides a unique conceptual model or framework for contractor satisfaction based on attributes identified by interviews with practitioners in Malaysia. In addition to progressing research in this topic and being of potential benefit to Malaysian contractors, it is anticipated that the framework will also be useful for other parties - clients, designers, subcontractors and suppliers - in enhancing the quality of products and/or services generally.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The outcomes of the construction projects can be evaluated in numerous ways. One method is to measure the satisfaction of participants as represented by the differences between their expectations and perceptions. This measurement is used widely in construction as it promises benefits, such as the improvement of product delivery, and enhances services quality by identifying some necessary changes. Commonly satisfaction measurement is gauged by evaluating the level of client satisfaction of construction performance. The measurement of customer satisfaction on the other hand, is based on the quality of the end product. This evaluation is used to encourage contractors to improve their performance to a required level and to ensure that the projects are delivered as expected- in terms of time, budget and quality. Several studies of performance measurement have indicated that contractor performance is still not satisfactory, as the outcome delivered is not as required (because of cost overruns, time overruns or because it is generally unsatisfactory). This drawback may be due to the contractors’ lack of expertise, motivation and/or satisfaction. The measurement of performance based on contractor satisfaction levels is still new and very few studies have yet taken place in the construction industry. This paper examines how the characteristics of a contracting organisation – namely its experience in the industry, background, past performance, size of organisation and financial stability- may influence its satisfaction levels with regards to project performance. Previous literature reviews and interviews are used as research tools in the preliminary investigation. The outcome is expected to present a basic understanding of contractor satisfaction measurement and its potential for improving the performance of project outcomes.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Abstract Study design: A prospective investigation of patients undergoing lumbar spine surgery. Objective: Is there a correlation between patient’s expectations before lumbar surgery, postoperative outcomes and satisfaction levels? Methods: A prospective study of 145 patients undergoing primary, single-level surgery for degenerative lumbar conditions was conducted. Oswestry Disability Index (ODI), back visual analogue scale (VAS) and leg VAS were assessed pre-operatively and at 6 weeks and 6 months post-surgery. Patients’ expectations were measured pre-operatively by asking them to score the level of pain and disability that would be least acceptable for them to undergo surgery and be satisfied. Satisfaction was assessed six weeks post-operatively with a Likert scale. Differences in patient expectations between actual and expected improvements were quantified. Results: Most patients had a clinically relevant improvement, but only about half achieved their expectation. Satisfaction did not correlate with pre-operative pain or disability, or with patient expectation of improvement. Instead, satisfaction correlated with positive outcomes. Conclusions Patient expectations have little bearing on final outcome and satisfaction.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Objective Despite ‘hospital resilience’ gaining prominence in recent years, it remains poorly defined. This article aims to define hospital resilience, build a preliminary conceptual framework and highlight possible approaches to measurement. Methods Searches were conducted of the commonly used health databases to identify relevant literature and reports. Search terms included ‘resilience and framework or model’ or ‘evaluation or assess or measure and hospital and disaster or emergency or mass casualty and resilience or capacity or preparedness or response or safety’. Articles were retrieved that focussed on disaster resilience frameworks and the evaluation of various hospital capacities. Result A total of 1480 potentially eligible publications were retrieved initially but the final analysis was conducted on 47 articles, which appeared to contribute to the study objectives. Four disaster resilience frameworks and 11 evaluation instruments of hospital disaster capacity were included. Discussion and conclusion Hospital resilience is a comprehensive concept derived from existing disaster resilience frameworks. It has four key domains: hospital safety; disaster preparedness and resources; continuity of essential medical services; recovery and adaptation. These domains were categorised according to four criteria, namely, robustness, redundancy, resourcefulness and rapidity. A conceptual understanding of hospital resilience is essential for an intellectual basis for an integrated approach to system development. This article (1) defines hospital resilience; (2) constructs conceptual framework (including key domains); (3) proposes comprehensive measures for possible inclusion in an evaluation instrument, and; (4) develops a matrix of critical issues to enhance hospital resilience to cope with future disasters.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The characterisation of facial expression through landmark-based analysis methods such as FACEM (Pilowsky & Katsikitis, 1994) has a variety of uses in psychiatric and psychological research. In these systems, important structural relationships are extracted from images of facial expressions by the analysis of a pre-defined set of feature points. These relationship measures may then be used, for instance, to assess the degree of variability and similarity between different facial expressions of emotion. FaceXpress is a multimedia software suite that provides a generalised workbench for landmark-based facial emotion analysis and stimulus manipulation. It is a flexible tool that is designed to be specialised at runtime by the user. While FaceXpress has been used to implement the FACEM process, it can also be configured to support any other similar, arbitrary system for quantifying human facial emotion. FaceXpress also implements an integrated set of image processing tools and specialised tools for facial expression stimulus production including facial morphing routines and the generation of expression-representative line drawings from photographs.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Compensation systems are an essential tool to link corporate goals such as customer orientation with individual and organisational performance. While some authors demonstrate the positive effects of incorporating nonfinancial measures into the compensation system empirically, companies have encountered problems after linking pay to customer satisfaction. We argue that reasons for this can be attributed to the measurement of customer satisfaction as well as to the missing link between customer satisfaction and customer retention and profitability in theses cases. Hence, there is a strong need for the development of an holistic reward and performance measurement model enabling an organisation to identify cause-and-effect relationships when linking rewards to nonfinancial performance measures. We present a conceptual framework of a success chain driven reward system that enables organisations to systematically derive a customer-oriented reward strategy. In the context of performance evaluation, we propose to rely on integrated and multidimensional measurement methods.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Much of what we know about lymphoedema is derived from studies involving cancer cohorts, in particular breast cancer. Yet even within this setting, and despite the known profound physical, social and psychological effects, our understanding of associated risk factors and effectiveness of prevention and treatment strategies is poorly studied with inconsistent results. The limitations of our current methods to detect and monitor lymphoedema contribute to our lack of understanding of this condition. Current measurement approaches applied in the clinical and research setting will be described during this presentation. The strengths, limitations and practical considerations relevant to measurement methods will also be addressed. Improving the way we detect and monitor lymphoedema is necessary and critical for advancing the lymphoedema field and is relevant for the detection and monitoring of lymphoedema in the clinic as well as in research.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper contributes to the literature on subjective well-being (SWB) by taking into account different aspects of life, called domains, such as health, financial situation, job, leisure, housing, and environment. We postulate a two-layer model where individual total SWB depends on the different subjective domain satisfactions. A distinction is made between long-term and short-term effects. The individual domain satisfactions depend on objectively measurable variables, such as income. The model is estimated using a large German panel data set.