Replacement of deteriorated water pipes is a capital-intensive activity for utility companies. Replacement planning aims to minimize total costs while maintaining a satisfactory level of service and is usually conducted for individual pipes. Scheduling replacement in groups is seen to be a better method and has the potential to provide benefits such as the reduction of maintenance costs and service interruptions. However, developing group replacement schedules is a complex task and often beyond the ability of a human expert, especially when multiple or conflicting objectives need to be catered for, such as minimization of total costs and service interruptions. This paper describes the development of a novel replacement decision optimization model for group scheduling (RDOM-GS), which enables multiple group-scheduling criteria by integrating new cost functions, a service interruption model, and optimization algorithms into a unified procedure. An industry case study demonstrates that RDOM-GS can improve replacement planning significantly and reduce costs and service interruptions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

With the purpose of testing the hypothesis that households’ intentions to replace their old car have a direct negative relationship to its perceived quality (‘current level’) and a direct positive relationship to their aspirations for a new car (‘aspiration level’), a rotating panel of car owners were interviewed every fourth month during 2 years. In this data set the hypothesis received support. In addition the results showed that the age of the car, the total number of miles driven, and the number of anticipated repairs affected the current level, whereas marital status, the number of children, consumer confidence, and environmental concern affected the aspiration level.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Large sized power transformers are important parts of the power supply chain. These very critical networks of engineering assets are an essential base of a nation’s energy resource infrastructure. This research identifies the key factors influencing transformer normal operating conditions and predicts the asset management lifespan. Engineering asset research has developed few lifespan forecasting methods combining real-time monitoring solutions for transformer maintenance and replacement. Utilizing the rich data source from a remote terminal unit (RTU) system for sensor-data driven analysis, this research develops an innovative real-time lifespan forecasting approach applying logistic regression based on the Weibull distribution. The methodology and the implementation prototype are verified using a data series from 161 kV transformers to evaluate the efficiency and accuracy for energy sector applications. The asset stakeholders and suppliers significantly benefit from the real-time power transformer lifespan evaluation for maintenance and replacement decision support.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

OBJECTIVE: The aim of this study was to explore women's decision-making about the balance of risks and benefits of taking hormone replacement therapy (HRT) based on the latest evidence from the Women's Health Initiative (WHI) trial of combined HRT. METHODS: Women aged 50-69 years, who were eligible for the Women's International Study of long Duration Oestrogen after Menopause (WISDOM) trial, were invited to participate in one of eight focus groups. Participants were asked to discuss their views about taking HRT based on the latest international evidence. RESULTS AND CONCLUSIONS: Eighty-two women participated overall. Qualitative content analysis was applied to the discussion transcripts. Women regarded the decisions they make about taking HRT as highly personal, and, for women currently taking HRT, the overwhelming reason for continuation was perceived improvement in quality of life regardless of either the risks or the benefits in the longer term.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: The aim was to construct and advise on the use of a cost-per-wear model based on contact lens replacement frequency, to form an equitable basis for cost comparison. ---------- Methods: The annual cost of professional fees, contact lenses and solutions when wearing daily, two-weekly and monthly replacement contact lenses is determined in the context of the Australian market for spherical, toric and multifocal prescription types. This annual cost is divided by the number of times lenses are worn per year, resulting in a ‘cost-per-wear’. The model is presented graphically as the cost-per-wear versus the number of times lenses are worn each week for daily replacement and reusable (two-weekly and monthly replacement) lenses.---------- Results: The cost-per-wear for two-weekly and monthly replacement spherical lenses is almost identical but decreases with increasing frequency of wear. The cost-per-wear of daily replacement spherical lenses is lower than for reusable spherical lenses, when worn from one to four days per week but higher when worn six or seven days per week. The point at which the cost-per-wear is virtually the same for all three spherical lens replacement frequencies (approximately AUD$3.00) is five days of lens wear per week. A similar but upwardly displaced (higher cost) pattern is observed for toric lenses, with the cross-over point occurring between three and four days of wear per week (AUD$4.80). Multifocal lenses have the highest price, with cross-over points for daily versus two-weekly replacement lenses at between four and five days of wear per week (AUD$5.00) and for daily versus monthly replacement lenses at three days per week (AUD$5.50).---------- Conclusions: This cost-per-wear model can be used to assist practitioners and patients in making an informed decision in relation to the cost of contact lens wear as one of many considerations that must be taken into account when deciding on the most suitable lens replacement modality.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The modern society has come to expect the electrical energy on demand, while many of the facilities in power systems are aging beyond repair and maintenance. The risk of failure is increasing with the aging equipments and can pose serious consequences for continuity of electricity supply. As the equipments used in high voltage power networks are very expensive, economically it may not be feasible to purchase and store spares in a warehouse for extended periods of time. On the other hand, there is normally a significant time before receiving equipment once it is ordered. This situation has created a considerable interest in the evaluation and application of probability methods for aging plant and provisions of spares in bulk supply networks, and can be of particular importance for substations. Quantitative adequacy assessment of substation and sub-transmission power systems is generally done using a contingency enumeration approach which includes the evaluation of contingencies, classification of the contingencies based on selected failure criteria. The problem is very complex because of the need to include detailed modelling and operation of substation and sub-transmission equipment using network flow evaluation and to consider multiple levels of component failures. In this thesis a new model associated with aging equipment is developed to combine the standard tools of random failures, as well as specific model for aging failures. This technique is applied in this thesis to include and examine the impact of aging equipments on system reliability of bulk supply loads and consumers in distribution network for defined range of planning years. The power system risk indices depend on many factors such as the actual physical network configuration and operation, aging conditions of the equipment, and the relevant constraints. The impact and importance of equipment reliability on power system risk indices in a network with aging facilities contains valuable information for utilities to better understand network performance and the weak links in the system. In this thesis, algorithms are developed to measure the contribution of individual equipment to the power system risk indices, as part of the novel risk analysis tool. A new cost worth approach was developed in this thesis that can make an early decision in planning for replacement activities concerning non-repairable aging components, in order to maintain a system reliability performance which economically is acceptable. The concepts, techniques and procedures developed in this thesis are illustrated numerically using published test systems. It is believed that the methods and approaches presented, substantially improve the accuracy of risk predictions by explicit consideration of the effect of equipment entering a period of increased risk of a non-repairable failure.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Distributed pipeline assets systems are crucial to society. The deterioration of these assets and the optimal allocation of limited budget for their maintenance correspond to crucial challenges for water utility managers. Decision makers should be assisted with optimal solutions to select the best maintenance plan concerning available resources and management strategies. Much research effort has been dedicated to the development of optimal strategies for maintenance of water pipes. Most of the maintenance strategies are intended for scheduling individual water pipe. Consideration of optimal group scheduling replacement jobs for groups of pipes or other linear assets has so far not received much attention in literature. It is a common practice that replacement planners select two or three pipes manually with ambiguous criteria to group into one replacement job. This is obviously not the best solution for job grouping and may not be cost effective, especially when total cost can be up to multiple million dollars. In this paper, an optimal group scheduling scheme with three decision criteria for distributed pipeline assets maintenance decision is proposed. A Maintenance Grouping Optimization (MGO) model with multiple criteria is developed. An immediate challenge of such modeling is to deal with scalability of vast combinatorial solution space. To address this issue, a modified genetic algorithm is developed together with a Judgment Matrix. This Judgment Matrix is corresponding to various combinations of pipe replacement schedules. An industrial case study based on a section of a real water distribution network was conducted to test the new model. The results of the case study show that new schedule generated a significant cost reduction compared with the schedule without grouping pipes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Due to the limitation of current condition monitoring technologies, the estimates of asset health states may contain some uncertainties. A maintenance strategy ignoring this uncertainty of asset health state can cause additional costs or downtime. The partially observable Markov decision process (POMDP) is a commonly used approach to derive optimal maintenance strategies when asset health inspections are imperfect. However, existing applications of the POMDP to maintenance decision-making largely adopt the discrete time and state assumptions. The discrete-time assumption requires the health state transitions and maintenance activities only happen at discrete epochs, which cannot model the failure time accurately and is not cost-effective. The discrete health state assumption, on the other hand, may not be elaborate enough to improve the effectiveness of maintenance. To address these limitations, this paper proposes a continuous state partially observable semi-Markov decision process (POSMDP). An algorithm that combines the Monte Carlo-based density projection method and the policy iteration is developed to solve the POSMDP. Different types of maintenance activities (i.e., inspections, replacement, and imperfect maintenance) are considered in this paper. The next maintenance action and the corresponding waiting durations are optimized jointly to minimize the long-run expected cost per unit time and availability. The result of simulation studies shows that the proposed maintenance optimization approach is more cost-effective than maintenance strategies derived by another two approximate methods, when regular inspection intervals are adopted. The simulation study also shows that the maintenance cost can be further reduced by developing maintenance strategies with state-dependent maintenance intervals using the POSMDP. In addition, during the simulation studies the proposed POSMDP shows the ability to adopt a cost-effective strategy structure when multiple types of maintenance activities are involved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction of menopause as a long-term risk to health and the adoption of discourses of prevention has made necessary a decision by women about medical treatment; specifically regarding the use of hormone replacement therapy. In a study of general practitioners’ accounts of menopause and treatment in Australia, women's ‘choice’, ‘informed decision-making’ and ‘empowerment’ were key themes through which primary medical care for women at menopause was presented. These accounts create a position for women defined by the concept of individual choice and an ethic of autonomy. These data are a basis for theorising more generally in this paper. We critically examine the construct of ‘informed decision-making’ in relation to several approaches to ethics including bioethics and a range of feminist ethics. We identify the intensification of power relations produced by an ethic of autonomy and discuss the ways these considerations inform a feminist ethics of decision-making by women. We argue that an ‘ethic of autonomy’ and an ‘offer of choice’ in relation to health care for women at menopause, far from being emancipatory, serves to intensify power relations. The dichotomy of choice, to take or not to take hormone replacement therapy, is required to be a choice and is embedded in relations of power and bioethical discourse that construct meanings about what constitutes decision-making at menopause. The deployment of the principle of autonomy in medical practice limits decision-making by women precisely because it is detached from the construction of meaning and the self and makes invisible the relations of power of which it is a part.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Over the past two decades medical researchers and modernist feminist researchers have contested the meaning of menopause. In this article we examine various meanings of menopause in major medical and feminist literature and the construction of menopause in a semi-structured interview study of general practitioners in rural South Australia. Three discursive themes are identified in these interviews; (i) the hormonal menopause – symptoms, risk, prevention; (ii) the informed menopausal woman; and (iii) decision-making and hormone replacement therapy. By using the discourse of prevention, general practitioners construct menopause in relation to women's health care choices, empowerment and autonomy. We argue that the ways in which these concepts are deployed by general practitioners in this study produces and constrains the options available to women. The implications of these general practitioner accounts are discussed in relation to the proposition that medical and feminist descriptions of menopause posit alternative but equally-fixed truths about menopause and their relationship with the range of responses available to women at menopause. Social and cultural explanations of disease causality (c.f.Germov 1998, Hardey 1998) are absent from the new menopause despite their being an integral part of the framework of the women's health movement and health promotion drawn on by these general practitioners. Further, the shift of responsibility for health to the individual woman reinforces practice claims to empower women, but oversimplifies power relations and constructs menopause as a site of self-surveillance. The use of concepts from the women's health movement and health promotion have nevertheless created change in both the positioning of women as having ‘choices’ and the positioning of some general practitioners in terms of greater information provision to women and an attention to the woman's autonomy. In conclusion, we propose that a new menopause has evolved from a discursive shift in medicine and that there exists within this new configuration, claiming the empowerment of women as an integral part of health care for menopause, the possibility for change in medical practice which will broaden, strengthen, and maintain this position.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The actual proportion of eligible people who participate in clinical trials is low. Consequently, a qualitative study of the willingness of women who are postmenopausal to participate in a long-term randomized control trial of hormone replacement therapy (HRT) designed to investigate the prevention of degenerative diseases was conducted. Focus group methodology was employed to explore the personal and social aspects of decision making about trial participation. Participants were randomly selected from the patient age-sex registers of four University of Adelaide general practices. Twenty-one women participated in four focus groups. The reasons for and against trial participation were examined using qualitative content analysis; ( n = 18) women were unwilling to participate in the trial. The lack of perceived individual benefit, minimal altruism, the risk of breast cancer and side effects, not wanting to take unnecessary medication, a ten-year commitment, and negative experiences of HRT use, were the main reasons given for not entering the trial. Of the few women ( n = 3) who clearly would enter the trial, free prescriptions and a positive history of using HRT were the main reasons for participation. The perceived disadvantages of clinical trials of HRT deter women from participating in a long-term clinical trial of HRT. An investment in education and information to eligible participants about both the risks and potential benefits of HRT may improve trial recruitment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis presents a multi-criteria optimisation study of group replacement schedules for water pipelines, which is a capital-intensive and service critical decision. A new mathematical model was developed, which minimises total replacement costs while maintaining a satisfactory level of services. The research outcomes are expected to enrich the body of knowledge of multi-criteria decision optimisation, where group scheduling is required. The model has the potential to optimise replacement planning for other types of linear asset networks resulting in bottom-line benefits for end users and communities. The results of a real case study show that the new model can effectively reduced the total costs and service interruptions.