Multi-criteria optimization of group replacement schedules for distributed water pipeline assets


Autoria(s): Li, Fengfeng
Data(s)

2014

Resumo

This thesis presents a multi-criteria optimisation study of group replacement schedules for water pipelines, which is a capital-intensive and service critical decision. A new mathematical model was developed, which minimises total replacement costs while maintaining a satisfactory level of services. The research outcomes are expected to enrich the body of knowledge of multi-criteria decision optimisation, where group scheduling is required. The model has the potential to optimise replacement planning for other types of linear asset networks resulting in bottom-line benefits for end users and communities. The results of a real case study show that the new model can effectively reduced the total costs and service interruptions.

Formato

application/pdf

Identificador

http://eprints.qut.edu.au/66195/

Publicador

Queensland University of Technology

Relação

http://eprints.qut.edu.au/66195/1/Fengfeng_Li_Thesis.pdf

Li, Fengfeng (2014) Multi-criteria optimization of group replacement schedules for distributed water pipeline assets. PhD thesis, Queensland University of Technology.

Fonte

School of Chemistry, Physics & Mechanical Engineering; Science & Engineering Faculty

Palavras-Chave #Reliability Analysis #Hazard Models #Multi-Criteria Optimisation #Pipeline Maintenance #Decision Support #Cost Modelling #Service Interruption Modelling #Group Replacement Scheduling
Tipo

Thesis