279 resultados para Range management
em Queensland University of Technology - ePrints Archive
Resumo:
Controlling free-ranging livestock requires low-stress cues to alter animal behaviour. Recently modulated sound and electric shock were demonstrated to be effective in controlling free-ranging cattle. In this study the behaviour of 60, 300 kg Belmont Red heifers were observed for behavioural changes when presented cues designed to impede their movement through an alley. The heifers were given an overnight drylot shrink off feed but not drinking water prior to being tested. Individual cattle were allowed to move down a 6.5 m wide alley towards a pen of peers and feed located 71 m from their point of release. Each animal was allowed to move through the alley unimpeded five times to establish a basal behavioural pattern. Animals were then randomly assigned to treatments consisting of sound plus shock, vibration plus shock, a visual cue plus shock, shock by itself and a control. The time each animal required to reach the pen of peers and feed was recorded. If the animal was prevented from reaching the pen of peers and feed by not penetrating through the cue barrier at set points along the alley for at least 60 sec the test was stopped and the animal was returned to peers located behind the release pen. Cues and shock were manually applied from a laptop while animals were observed from a 3.5 m tower located outside the alley. Electric shock, sound, vibration and Global Position System (GPS) hardware were housed in a neck collar. Results and implications will be discussed.
Resumo:
Maintenance is a time consuming and expensive task for any golf course or driving range manager. For a golf course the primary tasks are grass mowing and maintenance (fertilizer and herbicide spreading), while for a driving range mowing, maintenance and ball collection are required. All these tasks require an operator to drive a vehicle along paths which are generally predefined. This paper presents some preliminary in-field tsting results for an automated tractor vehicle performing golf ball collection on an actual driving range, and mowing on difficult unstructured terrain.
Resumo:
In Australia, the spread and dominance of non-native plant species has been identified as a serious threat to rangeland biodiversity and ecosystem functioning. Rangelands extend over 70% of Australia’s land mass or more than 6 million km2. These rangelands consist of a diverse set of ecosystems including grasslands, shrub-lands, and woodlands spanning numerous climatic zones, ranging from arid to mesic. Because of the high economic, social, and environmental values, sustainable management of these vast landscapes is critical for Australia’s future. More than 2 million people live in these areas and major industries are ranching, mining, and tourism. In terms of biodiversity values, 53 of 85 of Australia’s biogeographical regions and 5 of 15 identified biodiversity hotspots are found in rangelands.
Resumo:
Developments in information technology will drive the change in records management; however, it should be the health information managers who drive the information management change. The role of health information management will be challenged to use information technology to broker a range of requests for information from a variety of users, including he alth consumers. The purposes of this paper are to conceptualise the role of health information management in the context of a technologically driven and managed health care environment, and to demonstrat e how this framework has been used to review and develop the undergraduate program in health information management at the Queensland University of Technology.
Resumo:
Enterprise System (ES) implementation and management are knowledge intensive tasks that inevitably draw upon the experience of a wide range of people with diverse knowledge capabilities. Knowledge Management (KM) has been identified as a critical success factor in ES projects. Despite the recognized importance of managing knowledge for ES benefits realization, systematic attempts to conceptualize KM-structures have been few. Where the adequacy of KM-structures is assessed, the process and measures are typically idiosyncratic and lack credibility. Using the ‘KM-process’, itself based in sociology of knowledge, this paper conceptualizes four main constructs to measure the adequacy of KM-structures. The SEM model is tested using 310 responses gathered from 27 ES installations that had implemented SAP R/3. The findings reveal six constructs for KM-structure. Furthermore, the paper demonstrates the application of KM-structures in the context of ES using the Adaptive Structuration Theory. The results demonstrate that having adequate KM-structures in place, while necessary, is not sufficient. These rules and resources must be appropriated to have greater positive influence on the Enterprise System. Furthermore, the study provides empirical support for knowledge-based theory by illustrating the importance of knowledge use/re-use (vs. knowledge creation) as the most important driver in the process of KM.
Resumo:
The PMBOK Guide is one of the most influential publications concerning the knowledge of the project manangement. Moreover, the pervasion of this guide seems to be set to increase as the basis of accreditation - in conjunction with the increasing global trend toward obtaining project management professional status. However, despite the influence and strengthening profile of this guide, reports continue to be published that detail numerous project failures in a wide range of different industries. The PMBOK Guide comprises mainly declarative (know-what) and procedural (know-how) information. In this sense, the guide is largely normative and provides a very good example of the limitations of this approach as highlighted by proponents of a move to the genuine application of positibe theory in project management.----- The aim of this paper is to determine the applicability of the guide in Australia and to determine the extent to which project success can be attributed to the guide. Project Managers from a variety of organisations were surveyed. This postal survey yielded 48 replies. Descriptive statistics was used to assess the incidence and effectivieness of all the processes in the guide. The results indicate that there were no processes that could be considered as peripheral or as a candidate for elimination from the guide. More specifically, all the processes were identified as either a key routine process or a key selective process and positively related to the level of project success. However, the results also indicated that other major factors pertaining to causal knowledge (know-why) are, at least, equally important determinants of project success. It is concluded that declarative, procedural and causal knowledge are all valuable, and given the preponderance of the first two types of knowledge, there seems to be an urgent need to now ensure an equal quest for causal knowledge. In terms of developing causal knowledge, a good starting point would appear to be both positive theory from production and economics.
Resumo:
Since the 1980s, in Australia and other developed nations, public sector management philosophies and how the public sector is organized have changed dramatically. At the same time, there have been many demands, and several attempts, to preserve and promote ethical behaviour within the public sector - though few go much beyond the publication of a code. Both developments require an understanding of how public organizations operate in this new environment. Organizational and management theory are seen as providing important potential insights into the opportunities and pitfalls for building ethics into the practices, culture and norms of public organizations. This book brings together the experience and research of a range of "reflective practitioners" and "engaged academics" in public sector management, organizational theory, management theory, public sector ethics and law. It addresses what management and organization theory might suggest about the nature of public organizations and the institutionalization of ethics.
Resumo:
This document provides a review of international and national practices in investment decision support tools in road asset management. Efforts were concentrated on identifying analytic frameworks, evaluation methodologies and criteria adopted by current tools. Emphasis was also given to how current approaches support Triple Bottom Line decision-making. Benefit Cost Analysis and Multiple Criteria Analysis are principle methodologies in supporting decision-making in Road Asset Management. The complexity of the applications shows significant differences in international practices. There is continuing discussion amongst practitioners and researchers regarding to which one is more appropriate in supporting decision-making. It is suggested that the two approaches should be regarded as complementary instead of competitive means. Multiple Criteria Analysis may be particularly helpful in early stages of project development, say strategic planning. Benefit Cost Analysis is used most widely for project prioritisation and selecting the final project from amongst a set of alternatives. Benefit Cost Analysis approach is useful tool for investment decision-making from an economic perspective. An extension of the approach, which includes social and environmental externalities, is currently used in supporting Triple Bottom Line decision-making in the road sector. However, efforts should be given to several issues in the applications. First of all, there is a need to reach a degree of commonality on considering social and environmental externalities, which may be achieved by aggregating the best practices. At different decision-making level, the detail of consideration of the externalities should be different. It is intended to develop a generic framework to coordinate the range of existing practices. The standard framework will also be helpful in reducing double counting, which appears in some current practices. Cautions should also be given to the methods of determining the value of social and environmental externalities. A number of methods, such as market price, resource costs and Willingness to Pay, are found in the review. The use of unreasonable monetisation methods in some cases has discredited Benefit Cost Analysis in the eyes of decision makers and the public. Some social externalities, such as employment and regional economic impacts, are generally omitted in current practices. This is due to the lack of information and credible models. It may be appropriate to consider these externalities in qualitative forms in a Multiple Criteria Analysis. Consensus has been reached in considering noise and air pollution in international practices. However, Australia practices generally omitted these externalities. Equity is an important consideration in Road Asset Management. The considerations are either between regions, or social groups, such as income, age, gender, disable, etc. In current practice, there is not a well developed quantitative measure for equity issues. More research is needed to target this issue. Although Multiple Criteria Analysis has been used for decades, there is not a generally accepted framework in the choice of modelling methods and various externalities. The result is that different analysts are unlikely to reach consistent conclusions about a policy measure. In current practices, some favour using methods which are able to prioritise alternatives, such as Goal Programming, Goal Achievement Matrix, Analytic Hierarchy Process. The others just present various impacts to decision-makers to characterise the projects. Weighting and scoring system are critical in most Multiple Criteria Analysis. However, the processes of assessing weights and scores were criticised as highly arbitrary and subjective. It is essential that the process should be as transparent as possible. Obtaining weights and scores by consulting local communities is a common practice, but is likely to result in bias towards local interests. Interactive approach has the advantage in helping decision-makers elaborating their preferences. However, computation burden may result in lose of interests of decision-makers during the solution process of a large-scale problem, say a large state road network. Current practices tend to use cardinal or ordinal scales in measure in non-monetised externalities. Distorted valuations can occur where variables measured in physical units, are converted to scales. For example, decibels of noise converts to a scale of -4 to +4 with a linear transformation, the difference between 3 and 4 represents a far greater increase in discomfort to people than the increase from 0 to 1. It is suggested to assign different weights to individual score. Due to overlapped goals, the problem of double counting also appears in some of Multiple Criteria Analysis. The situation can be improved by carefully selecting and defining investment goals and criteria. Other issues, such as the treatment of time effect, incorporating risk and uncertainty, have been given scant attention in current practices. This report suggested establishing a common analytic framework to deal with these issues.
Resumo:
Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.
Resumo:
Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course
Resumo:
Brisbane Water (BW), a commercialised business arm of Brisbane City Council (BCC) entered into an alliance with a number of organisations from the private sector in order to design, construct, commission and undertake upgrades to three existing wastewater treatment plants located at Sandgate, Oxley Creek, and Wacol in Brisbane. The alliance project is called the Brisbane Water Environmental Alliance (BWEA). This report details the efforts of a team of researchers from the School of Management at Queensland University of Technology to investigate this alliance. This is the second report on this project, and is called Stage 2 of the research. At the time that Stage 2 of the research project was conducted, the BWEA project was nearing completion with a further 8 months remaining before project completion. The aim of this report is to explore individuals’ perceptions of the effectiveness and functioning of the BWEA project in the latter stages of the project. The second aim of this report is to analyse the longitudinal findings of this research project by integrating the findings from Stage 1 and Stage 2 of the project. This long-term analysis of the functioning and effectiveness of the alliance is important because at the current time, researchers have little knowledge of the group developmental processes that occur in large-scale alliances over time. Stage 2 of this research project has a number of aims including assessing performance of the BWEA project from the point of view of a range of stakeholders including the alliance board and alliance management team, alliance staff, and key stakeholders from the client organisation (Brisbane Water). Data were collected using semi-structured interviews with 18 individuals including two board members, one external facilitator, and four staff members from the client organisation. Analysis involved coding the interview transcripts in terms of the major issues that were reported by interviewees.
Resumo:
The world’s population is ageing rapidly. Ageing has an impact on all aspects of human life, including social, economic, cultural, and political. Understanding ageing is therefore an important issue for the 21st century. This chapter will consider the active ageing model. This model is based on optimising opportunities for health, participation, and security in order to enhance quality of life. There is a range of exciting options developing for personal health management, for and by the ageing population, that make use of computer technology, and these should support active ageing. Their use depends however on older people learning to use computer technology effectively. The ability to use such technology will allow them to access relevant health information, advice, and support independently from wherever they live. Such support should increase rapidly in the future. This chapter is a consideration of ageing and learning, ageing and use of computer technology, and personal health management using computers.
Resumo:
Objectives: To determine opinions and experiences of health professionals concerning the management of people with comorbid substance misuse and mental health disorders. Method: We conducted a survey of staff from mental health services and alcohol and drug services across Queensland. Survey items on problems and potential solutions had been generated by focus groups. Results: We analysed responses from 112 staff of alcohol and drug services and 380 mental health staff, representing a return of 79% and 42% respectively of the distributed surveys. One or more issues presented a substantial clinical management problem for 98% of respondents. Needs for increased facilities or services for dual disorder clients figured prominently. These included accommodation or respite care, work and rehabilitation programs, and support groups and resource materials for families. Needs for adolescent dual diagnosis services and after-hours alcohol and drug consultations were also reported. Each of these issues raised substantial problems for over 70% of staff. Another set of problems involved coordination of client care across mental health and alcohol and drug services, including disputes over duty of care. Difficulties with intersectoral liaison were more pronounced for alcohol and drug staff than for mental health. A majority of survey respondents identified 13 solutions as practical. These included routine screening for dual diagnosis at intake, and a range of proposals for closer intersectoral communication such as exchanging client information, developing shared treatment plans, conducting joint case conferences and offering consultation facilities. Conclusions: A wide range of problems for the management of comorbid disorders were identified. While solution of some problems will require resource allocation, many may be addressed by closer liaison between existing services.
Resumo:
This set of papers in this issue of "Addictive Behaviors" was presented at the 2004 'Addictions' conference, which, for the first time, was held in the Southern Hemisphere, on the Sunshine Coast of Queensland, Australia. The theme of the conference, Crossing Boundaries: Implications of Advances in Basic Sciences for the Management of Addiction, speaks for itself. The papers derive from a wide range of empirical paradigms and cover issues with relevance to the development of addiction, to the maintenance of problematic use, and to assessment, treatment, and relapse. Research from Europe and the United States is represented, as well as work from Australia. An international perspective is strongly emphasized from the initial paper by Obot, Poznyak, and Moneiro, (see record 2004-19599-015) which describes the WHO Report on the Neuroscience of Psychoactive Substance Use and Dependence, and summarises some of the report's implications for policy and practice. Hall, Carter, and Morley (see record 2004-19599-014) close the issue with a paper on the wide-ranging ethical implications of advances in neuroscience research, including issues arising from the identification of high risk for addiction, the potential for coercive pharmacotherapy, use of medications to enhance function, and risks to privacy.
Resumo:
Construction projects can involve a diverse range of stakeholders and the success of the project depends very much on fulfilling their needs and expectations. It is important, therefore, to identify and recognize project stakeholders and develop a rigorous stakeholder management process. However, limited research has investigated the impact of stakeholders on construction projects in developing countries. A stakeholder impact analysis (SIA), based on an approach developed by Olander (2007), was adopted to investigate the stakeholders' impact on state-owned civil engineering projects in Vietnam. This involved the analysis of a questionnaire survey of 57 project managers to determine the relative importance of different stakeholders. The results show the client to have the highest level of impact on the projects, followed by project managers and the senior management of state-owned engineering firms. The SIA also provides suggestions to project managers in developing and evaluating the stakeholder management process.