404 resultados para Mountaintop removal coal mining

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Queensland Coal Industry Employees Health Scheme was implemented in 1993 to provide health surveillance for all Queensland coal industry workers. Tt1e government, mining employers and mining unions agreed that the scheme should operate for seven years. At the expiry of the scheme, an assessment of the contribution of health surveillance to meet coal industry needs would be an essential part of determining a future health surveillance program. This research project has analysed the data made available between 1993 and 1998. All current coal industry employees have had at least one health assessment. The project examined how the centralised nature of the Health Scheme benefits industry by identi~)jng key health issues and exploring their dimensions on a scale not possible by corporate based health surveillance programs. There is a body of evidence that indicates that health awareness - on the scale of the individual, the work group and the industry is not a part of the mining industry culture. There is also growing evidence that there is a need for this culture to change and that some change is in progress. One element of this changing culture is a growth in the interest by the individual and the community in information on health status and benchmarks that are reasonably attainable. This interest opens the way for health education which contains personal, community and occupational elements. An important element of such education is the data on mine site health status. This project examined the role of health surveillance in the coal mining industry as a tool for generating the necessary information to promote an interest in health awareness. The Health Scheme Database provides the material for the bulk of the analysis of this project. After a preliminary scan of the data set, more detailed analysis was undertaken on key health and related safety issues that include respiratory disorders, hearing loss and high blood pressure. The data set facilitates control for confounding factors such as age and smoking status. Mines can be benchmarked to identify those mines with effective health management and those with particular challenges. While the study has confirmed the very low prevalence of restrictive airway disease such as pneu"moconiosis, it has demonstrated a need to examine in detail the emergence of obstructive airway disease such as bronchitis and emphysema which may be a consequence of the increasing use of high dust longwall technology. The power of the Health Database's electronic data management is demonstrated by linking the health data to other data sets such as injury data that is collected by the Department of l\1mes and Energy. The analysis examines serious strain -sprain injuries and has identified a marked difference between the underground and open cut sectors of the industry. The analysis also considers productivity and OHS data to examine the extent to which there is correlation between any pairs ofJpese and previously analysed health parameters. This project has demonstrated that the current structure of the Coal Industry Employees Health Scheme has largely delivered to mines and effective health screening process. At the same time, the centralised nature of data collection and analysis has provided to the mines, the unions and the government substantial statistical cross-sectional data upon which strategies to more effectively manage health and relates safety issues can be based.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the late 20th century, a value-shift began to influence political thinking, recognising the need for environmentally, socially and culturally sustainable resource development. This shift entailed moves away from thinking of nature and culture as separate entities - The former existing merely to serve the latter. Cultural landscape theory recognises 'nature' as at once both 'natural', and as a 'cultural' construct. As such it may offer a framework through which to progress in the quest for 'sustainable development'. This 2005 Masters thesis makes a contribution to that quest by asking whether contemporary developments in cultural landscape theory can contribute to rehabilitation strategies for Australian open-cut coal mining landscapes, an examplar resource development landscape. A thematic historial overview of landscape values and resource development in Australis post-1788, and a review of cultural landscape theory literature contribute to the formation of the theoretical framework: "reconnecting the interrupted landscape". The author then explores a possible application of this framework within the Australian open-cut coal mining landscape.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Current approaches to the regulation of coal mining activities in Australia have facilitated the extraction of substantial amounts of coal and coal seam gas. The regulation of coal mining activities must now achieve the reduction or mitigation of greenhouse gas emissions in order to address the challenge of climate change and achieve ecologically sustainable development. Several legislative mechanisms currently exist which appear to offer the means to bring about the reduction or mitigation of greenhouse gas emissions from coal mining activities, yet Australia’s emissions from coal mining continue to rise. This article critiques these existing legislative mechanisms and presents recommendations for reform.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A value-shift began to influence global political thinking in the late 20th century, characterised by recognition of the need for environmentally, socially and culturally sustainable resource development. This shift entailed a move away from thinking of ‘nature’ and ‘culture’ as separate entities – the former existing to serve the latter – toward the possibility of embracing the intrinsic worth of the nonhuman world. Cultural landscape theory recognises ‘nature’ as at once both ‘natural’, and a ‘cultural’ construct. As such, it may offer a framework through which to progress in the quest for ‘sustainable development’. This study makes a contribution to this quest by asking whether contemporary developments in cultural landscape theory can contribute to rehabilitation strategies for Australian open-cut coal mining landscapes. The answer is ‘yes’. To answer the research question, a flexible, ‘emergent’ methodological approach has been used, resulting in the following outcomes. A thematic historical overview of landscape values and resource development in Australia post-1788, and a review of cultural landscape theory literature, contribute to the formation of a new theoretical framework: Reconnecting the Interrupted Landscape. This framework establishes a positive answer to the research question. It also suggests a method of application within the Australian open-cut coal mining landscape, a highly visible exemplar of the resource development landscape. This method is speculatively tested against the rehabilitation strategy of an operating open-cut coal mine, concluding with positive recommendations to the industry, and to government.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis increased the researchers understanding of the relationship between operations and maintenance in underground longwall coal mines, using data from a Queensland underground coal mine. The thesis explores various relationships between recorded variables. Issues with human recorded data was uncovered, and results emphasised the significance of variables associated with conveyor operation to explain production.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, we describe the main processes and operations in mining industries and present a comprehensive survey of operations research methodologies that have been applied over the last several decades. The literature review is classified into four main categories: mine design; mine production; mine transportation; and mine evaluation. Mining design models are further separated according to two main mining methods: open-pit and underground. Moreover, mine production models are subcategorised into two groups: ore mining and coal mining. Mine transportation models are further partitioned in accordance with fleet management, truck haulage and train scheduling. Mine evaluation models are further subdivided into four clusters in terms of mining method selection, quality control, financial risks and environmental protection. The main characteristics of four Australian commercial mining software are addressed and compared. This paper bridges the gaps in the literature and motivates researchers to develop more applicable, realistic and comprehensive operations research models and solution techniques that are directly linked with mining industries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The coal industry in Queensland operates in a very complex regulatory environment with a matrix of Federal and State laws covering the environment, health and safety, taxation and royalties, tenure, and development approvals. The Queensland Government in 2012 recognised the validity of certain industry concerns and passed two Acts being the Environmental Protection (Greentape Reduction) Amendment Act 2012 (the Greentape Act) and the Mines Legislation (Streamlining) Amendment Act 2012 (the Streamlining Act). Other changes are foreshadowed in relation to overlapping tenure and in the development of common resources legislation. Accordingly there is a great level of activity and change that has occurred or which is on the horizon. This article focuses upon these regulatory changes and foreshadows other areas requiring consideration. It commences with a consideration of the changes that have already occurred, examines those regulatory amendments that are on the drawing board and concludes with suggestions as to further interventions and amendments that have the potential to enhance the efficiency and effectiveness of the legislative framework in which coal mining is conducted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper addresses the regulatory issues arising in developing a new regulatory model for the New South Wales Coal Industry. As such, it identifies the relevant literature on this subject, the options available for reform, and the experience of Australian and key international bodies responsible for the development of regulatory standards in this area. In particular it: Identifies the main shortcomings in the existing regulatory approach; Identifies the potential roles/main strengths and weaknesses of different types of standards (eg specification, performance, process and systems-based rules) and potential “best practice’ combinations of standards; Examines the appropriateness of the current regulatory regime whereby the general OHS legislation (including the general duty provisions) applies to mining in addition to the large body of regulation which is specific to mining; Identifies the importance of, and possible means of addressing, issues of worker participation within the coal mining industry; Draws on the literature on what motivates companies and individuals for the purpose of recommending key provisions for inclusion in new legislation to provide appropriate personal and organisational incentives; Draws on the literature on major hazards facilities to suggest the appropriate roles for OHS management systems and safety reports or comparable approaches (eg mine safety management plans); Draws on the United Kingdom (UK) and United States of America (USA) experience of coal mine safety and its regulation for comparative purposes, and for insights as to what sort of regulation most effectively reduces work related injury and disease in coal mining; Examines the relevant roles of International Labour Organisation (ILO) Conventions; Examines the extent to which different regulatory regimes would be appropriate to open cut and underground coal mining; and Examines options for reform. This paper is focussed specifically on the issues identified above.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper discusses the issue of sensing and control for stabilizing a swinging load. Our work has focused in particular on the dragline as used for overburden stripping in open-pit coal mining, but many of the principles would also be applicable to construction cranes. Results obtained from experimental work on a full-scale production dragline are presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

BACKGROUND: Coal mining is of significant economic importance to the Australian economy. Despite this fact, the related workforce is subjected to a number of psychosocial risks and musculoskeletal injury, and various psychological disorders are common among this population group. Because only limited research has been conducted in this population group, we sought to examine the relationship between physical (pain) and psychological (distress) factors, as well as the effects of various demographic, lifestyle, and fatigue indicators on this relationship. METHODS: Coal miners (N = 231) participated in a survey of musculoskeletal pain and distress on-site during their work shifts. Participants also provided demographic information (job type, age, experience in the industry, and body mass index) and responded to questions about exercise and sleep quality (on- and off-shift) as well as physical and mental tiredness after work. RESULTS: A total of 177 workers (80.5%) reported experiencing pain in at least one region of their body. The majority of the sample population (61.9%) was classified as having low-level distress, 28.4% had scores indicating mild to moderate distress, and 9.6% had scores indicating high levels of distress. Both number of pain regions and job type (being an operator) significantly predicted distress. Higher distress score was also associated with greater absenteeism in workers who reported lower back pain. In addition, perceived sleep quality during work periods partially mediated the relationship between pain and distress. CONCLUSION: The study findings support the existence of widespread musculoskeletal pain among the coal-mining workforce, and this pain is associated with increased psychological distress. Operators (truck drivers) and workers reporting poor sleep quality during work periods are most likely to report increased distress, which highlights the importance of supporting the mining workforce for sustained productivity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article contributes an original integrated model of an open-pit coal mine for supporting energy-efficient decisions. Mixed integer linear programming is used to formulate a general integrated model of the operational energy consumption of four common open-pit coal mining subsystems: excavation and haulage, stockpiles, processing plants and belt conveyors. Mines are represented as connected instances of the four subsystems, in a flow sheet manner, which are then fitted to data provided by the mine operators. Solving the integrated model ensures the subsystems’ operations are synchronised and whole-of-mine energy efficiency is encouraged. An investigation on a case study of an open-pit coal mine is conducted to validate the proposed methodology. Opportunities are presented for using the model to aid energy-efficient decision-making at various levels of a mine, and future work to improve the approach is described.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis investigates factors that impact the energy efficiency of a mining operation. An innovative mathematical framework and solution approach are developed to model, solve and analyse an open-pit coal mine. A case study in South East Queensland is investigated to validate the approach and explore the opportunities for using it to aid long, medium and short term decision makers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Because of the bottlenecking operations in a complex coal rail system, millions of dollars are costed by mining companies. To handle this issue, this paper investigates a real-world coal rail system and aims to optimise the coal railing operations under constraints of limited resources (e.g., limited number of locomotives and wagons). In the literature, most studies considered the train scheduling problem on a single-track railway network to be strongly NP-hard and thus developed metaheuristics as the main solution methods. In this paper, a new mathematical programming model is formulated and coded by optimization programming language based on a constraint programming (CP) approach. A new depth-first-search technique is developed and embedded inside the CP model to obtain the optimised coal railing timetable efficiently. Computational experiments demonstrate that high-quality solutions are obtainable in industry-scale applications. To provide insightful decisions, sensitivity analysis is conducted in terms of different scenarios and specific criteria. Keywords Train scheduling · Rail transportation · Coal mining · Constraint programming

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.