6 resultados para Golf féminin -- France

em Queensland University of Technology - ePrints Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Pollard v Trude [2008] QSC 119 (20 May 2008) the plaintiff claimed for personal injuries suffered when he was struck by a golf ball during the course of a tournament. The plaintiff was a member of a group of four, playing in a two-day tournament at Indooroopilly Golf Club. All four players had teed off at the second hole of the course and when the defendant took his second shot; his ball struck one of the trees bordering the fairway and deflected, hitting the plaintiff who was waiting to take his third stroke. As the ball was in flight, the defendant had called out "Watch out Errol", or words to that effect, to the plaintiff. The plaintiff suffered injury to his eye, leaving his vision impaired. The plaintiff sued in negligence, alleging that by failing to shout "fore" as is traditionally done in golf, the defendant had failed to warn the appellant and this was a breach of their duty. The claim in negligence was dismissed by the Queensland Supreme Court, holding that there had been no breach of the duty.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Maintenance is a time consuming and expensive task for any golf course or driving range manager. For a golf course the primary tasks are grass mowing and maintenance (fertilizer and herbicide spreading), while for a driving range mowing, maintenance and ball collection are required. All these tasks require an operator to drive a vehicle along paths which are generally predefined. This paper presents some preliminary in-field tsting results for an automated tractor vehicle performing golf ball collection on an actual driving range, and mowing on difficult unstructured terrain.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

What is the secret mesmerism that death possesses and under the operation of which a modern architect – strident, confident, resolute – becomes rueful, pessimistic, or melancholic?1 Five years before Le Corbusier’s death at sea in 1965, the architect reluctantly agreed to adopt the project for L’Église Saint-Pierre de Firminy in Firminy-Vert (1960–2006), following the death of its original architect, André Sive, from leukemia in 1958.2 Le Corbusier had already developed, in 1956, the plan for an enclave in the new “green” Firminy town, which included his youth and culture center and a stadium and swimming pool; the church and a “boîte à miracles” near the youth center were inserted into the plan in the ’60s. (Le Corbusier was also invited, in 1962, to produce another plan for three Unités d’Habitation outside Firminy-Vert.) The Saint-Pierre church should have been the zenith of the quartet (the largest urban concentration of works by Le Corbusier in Europe, and what the architect Henri Ciriani termed Le Corbusier’s “acropolis”3) but in the early course of the project, Le Corbusier would suffer the diocese’s serial objections to his vision for the church – not unlike the difficulties he experienced with Notre Dame du Haut at Ronchamp (1950–1954) and the resistance to his proposed monastery of Sainte-Marie de la Tourette (1957–1960). In 1964, the bishop of Saint-Étienne requested that Le Corbusier relocate the church to a new site, but Le Corbusier refused and the diocese subsequently withdrew from the project. (With neither the approval, funds, nor the participation of the bishop, by then the cardinal archbishop of Lyon, the first stone of the church was finally laid on the site in 1970.) Le Corbusier’s ambivalence toward the project, even prior to his quarrels with the bishop, reveals...