632 resultados para Discharge Service
em Queensland University of Technology - ePrints Archive
Resumo:
Discharge planning has become increasingly important, with current trends toward shorter hospital stays, increased health care costs, and more community-based health services. Effective discharge planning ensures the safety and ongoing care for patients,1 and it also benefits health care providers and organizations. It results in shorter hospital stays, fewer readmissions, higher access rates to post-hospitalization services, greater patient satisfaction with the discharge, and improved quality of life and continuity of care.[2] and [3] All acute care patients and their caregivers require some degree of preparation for discharge home—education about their health status, risks, and treatment; help setting health goals and maintaining a good level of self-care; information about community resources; and follow-up appointments and referrals to appropriate community health providers. Inadequate preparation exposes the patient to unnecessary risks of recurrence or complications of the acute complaint, neglect of nonacute comorbidities, mismanagement and side effects of medication, disruption of family and social life, emotional distress, and financial loss.[2], [3] and [4] The result may be re-presentation to the emergency department. It is noteworthy that up to 18% of ED presentations are revisits within 72 hours of the original visit5; many of these are considered preventable.6 It is a primary responsibility of nurses to ensure that patients return to the community adequately prepared and with appropriate support in place. Up to 65% of ED patients are discharged home from the emergency department,7 and the characteristics of the emergency department and its patient population make the provision of a high standard of discharge planning uniquely difficult. In addition, discharge planning is neglected in contemporary emergency nursing—there are no monographs devoted to the subject, and there is little published research. In this article 3 issues are explored: the importance of emergency nurses’ participation in the discharge-planning process, impediments to their participation; and strategies to improve discharge planning in the emergency department.
Resumo:
Objectives: Malnutrition is common in older hospitalised patients, and barriers to adequate intake in hospital limit the effectiveness of hospital-based nutrition interventions. This pilot study was undertaken to determine whether nutrition-focussed care at discharge and in the early post-hospital period is feasible and acceptable to patients and carers, and improves nutritional status. Design: Prospective cohort study Setting: Internal medicine wards of a tertiary teaching hospital in Brisbane, Australia Participants: Patients aged 65 and older admitted for at least 3 days, identified as malnourished or at risk of malnutrition using Mini Nutritional Assessment (MNA). Interventions: An interdisciplinary discharge team (specialist discharge planning nurse and accredited practicing dietitian) provided nutrition-focussed education, advice, service coordination and follow-up (home visits and telephone) for 6 weeks following hospitalisation Measurements: Nutritional intake, weight, functional status and MNA were recorded 6 and 12 weeks after discharge. Service intensity and changes to care were noted, and hospital readmissions recorded. Service feedback from patients and carers was sought using a brief questionnaire. Results: 12 participants were enrolled during the 6 week pilot (mean age 82 years, 50% male). All received 1-2 home visits, and 3-8 telephone calls. Four participants had new community services arranged, 4 were commenced on oral nutritional supplements, and 7 were referred to community dietetics services for follow-up. Two participants had a decline in MNA score of more than 10% at 12 week follow-up, while the remainder improved by at least 10%. Individualised care including community service coordination was valued by participants. Conclusion: The proposed model of care for older adults was feasible, acceptable to patients and carers, and associated with improved nutritional status at 12 weeks for most participants. The pilot data will be useful for design of intervention trials.
Resumo:
Introduction Malnutrition is common among hospitalised patients, with poor follow-up of nutrition support post-discharge. Published studies on the efficacy of ambulatory nutrition support (ANS) for malnourished patients post-discharge are scarce. The aims of this study were to evaluate the rate of dietetics follow-up of malnourished patients post-discharge, before (2008) and after (2010) implementation of a new ANS service, and to evaluate nutritional outcomes post-implementation. Materials and Methods Consecutive samples of 261 (2008) and 163 (2010) adult inpatients referred to dietetics and assessed as malnourished using Subjective Global Assessment (SGA) were enrolled. All subjects received inpatient nutrition intervention and dietetic outpatient clinic follow-up appointments. For the 2010 cohort, ANS was initiated to provide telephone follow-up and home visits for patients who failed to attend the outpatient clinic. Subjective Global Assessment, body weight, quality of life (EQ-5D VAS) and handgrip strength were measured at baseline and five months post-discharge. Paired t-test was used to compare pre- and post-intervention results. Results In 2008, only 15% of patients returned for follow-up with a dietitian within four months post-discharge. After implementation of ANS in 2010, the follow-up rate was 100%. Mean weight improved from 44.0 ± 8.5kg to 46.3 ± 9.6kg, EQ-5D VAS from 61.2 ± 19.8 to 71.6 ± 17.4 and handgrip strength from 15.1 ± 7.1 kg force to 17.5 ± 8.5 kg force; p<0.001 for all. Seventy-four percent of patients improved in SGA score. Conclusion Ambulatory nutrition support resulted in significant improvements in follow-up rate, nutritional status and quality of life of malnourished patients post-discharge.
Resumo:
Introduction Malnutrition is common among hospitalised patients, with poor follow-up of nutrition support post-discharge. Published studies on the efficacy of ambulatory nutrition support (ANS) for malnourished patients post-discharge are scarce. The aims of this study were to evaluate the rate of dietetics follow-up of malnourished patients post-discharge, before (2008) and after (2010) implementation of a new ANS service, and to evaluate nutritional outcomes post-implementation. Materials and Methods Consecutive samples of 261 (2008) and 163 (2010) adult inpatients referred to dietetics and assessed as malnourished using Subjective Global Assessment (SGA) were enrolled. All subjects received inpatient nutrition intervention and dietetic outpatient clinic follow-up appointments. For the 2010 cohort, ANS was initiated to provide telephone follow-up and home visits for patients who failed to attend the outpatient clinic. Subjective Global Assessment, body weight, quality of life (EQ-5D VAS) and handgrip strength were measured at baseline and five months post-discharge. Paired t-test was used to compare pre- and post-intervention results. Results In 2008, only 15% of patients returned for follow-up with a dietitian within four months post-discharge. After implementation of ANS in 2010, the follow-up rate was 100%. Mean weight improved from 44.0 ± 8.5kg to 46.3 ± 9.6kg, EQ-5D VAS from 61.2 ± 19.8 to 71.6 ± 17.4 and handgrip strength from 15.1 ± 7.1 kg force to 17.5 ± 8.5 kg force; p<0.001 for all. Seventy-four percent of patients improved in SGA score. Conclusion Ambulatory nutrition support resulted in significant improvements in follow-up rate, nutritional status and quality of life of malnourished patients post-discharge.
Resumo:
Background: Decreased ability to perform Activities of Daily Living (ADLs) during hospitalisation has negative consequences for patients and health service delivery. Objective: To develop an Index to stratify patients at lower and higher risk of a significant decline in ability to perform ADLs at discharge. Design: Prospective two cohort study comprising a derivation (n=389; mean age 82.3 years; SD� 7.1) and a validation cohort (n=153; mean age 81.5 years; SD� 6.1). Patients and setting: General medical patients aged = 70 years admitted to three university-affiliated acute care hospitals in Brisbane, Australia. Measurement and main results: The short ADL Scale was used to identify a significant decline in ability to perform ADLs from premorbid to discharge. In the derivation cohort, 77 patients (19.8%) experienced a significant decline. Four significant factors were identified for patients independent at baseline: 'requiring moderate assistance to being totally dependent on others with bathing'; 'difficulty understanding others (frequently or all the time)'; 'requiring moderate assistance to being totally dependent on others with performing housework'; a 'history of experiencing at least one fall in the previous 90 days prior to hospital admission' in addition to 'independent at baseline', which was protective against decline at discharge. 'Difficulty understanding others (frequently or all the time)' and 'requiring moderate assistance to being totally dependent on others with performing housework' were also predictors for patients dependent in ADLs at baseline. Sensitivity, specificity, Positive Predictive Value (PPV), and Negative Predictive Value (NPV) of the DADLD dichotomised risk scores were: 83.1% (95% CI 72.8; 90.7); 60.5% (95% CI 54.8; 65.9); 34.2% (95% CI 27.5; 41.5); 93.5% (95% CI 89.2; 96.5). In the validation cohort, 47 patients (30.7%) experienced a significant decline. Sensitivity, specificity, PPV and NPV of the DADLD were: 78.7% (95% CI 64.3; 89.3); 69.8% (95% CI 60.1, 78.3); 53.6% (95% CI 41.2; 65.7); 88.1% (95% CI 79.2; 94.1). Conclusions: The DADLD Index is a useful tool for identifying patients at higher risk of decline in ability to perform ADLs at discharge.
Resumo:
Insulated rail joints (IRJs) are an integral part of the rail track signaling system and pose significant maintenance and replacement costs due to their low and fluctuating service lives. Failure occurs mainly in rail head region, bolt- holes of fishplates and web-holes of the rails. Propagation of cracks is influenced by the evolution of internal residual stresses in rails during rail manufacturing (hot-rolling, roller-straightening, and head-hardening process), and during service, particularly in heavy rail haul freight systems where loads are high. In this investigation, rail head accumulated residual stresses were analysed using neutron diffraction at the Australian Nuclear Science and Technology Organisation (ANSTO). Two ex-service two head-hardened rail joints damaged under different loading were examined and results were compared with those obtained from an unused rail joint reference sample in order to differentiate the stresses developed during rail manufacturing and stresses accumulated during rail service. Neutron diffraction analyses were carried out on the samples in longitudinal, transverse and vertical directions, and on 5mm thick sliceed samples cut by Electric Discharge Machining (EDM). For the rail joints from the service line, irrespective of loading conditions and in-service times, results revealed similar depth profiles of stress distribution. Evolution of residual stress fields in rails due to service was also accompanied by evidence of larger material flow based on reflected light and scanning electron microscopy studies. Stress evolution in the vicinity of rail ends was characterised by a compressive layer, approximately 5 mm deep, and a tension zone located approximately 5- 15mm below the surfaces. A significant variation of d0 with depth near the top surface was detected and was attributed to decarburization in the top layer induced by cold work. Stress distributions observed in longitudinal slices of the two different deformed rail samples were found to be similar. For the undeformed rail, the stress distributions obtained could be attributed to variations associated with thermo-mechanical history of the rail.
Resumo:
Objective Chest pain is one of the most common complaints in patients presenting to an emergency department. Delays in management due to a lack of readily available objective tests to risk stratify patients with possible acute coronary syndromes can lead to an unnecessarily lengthy admission placing pressure on hospital beds or inappropriate discharge. The need for a co-ordinated system of clinical management based on enhanced communication between departments, timely and appropriate triage, clinical investigation, diagnosis, and treatment was identified. Methods An evidence-based Chest Pain Management Service and clinical pathway were developed and implemented, including the introduction of after-hours exercise stress testing. Results Between November 2005 and March 2013, 5662 patients were managed according to a Chest Pain Management pathway resulting in a reduction of 5181 admission nights by more timely identification of patients at low risk who could then be discharged. In addition, 1360 days were avoided in high-risk patients who received earlier diagnosis and treatment. Conclusions The creation of a Chest Pain Management pathway and the extended exercise stress testing service resulted in earlier discharge for low-risk patients; and timely treatment for patients with positive and equivocal exercise stress test results. This service demonstrated a significant saving in overnight admissions.
Resumo:
This paper discusses a framework in which catalog service communities are built, linked for interaction, and constantly monitored and adapted over time. A catalog service community (represented as a peer node in a peer-to-peer network) in our system can be viewed as domain specific data integration mediators representing the domain knowledge and the registry information. The query routing among communities is performed to identify a set of data sources that are relevant to answering a given query. The system monitors the interactions between the communities to discover patterns that may lead to restructuring of the network (e.g., irrelevant peers removed, new relationships created, etc.).