431 resultados para Construction Management, Employees, Job Performance

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

According to career construction theory, continuous adaptation to the work environment is crucial to achieve work and career success. In this study, we examined the relative importance of career adaptability for job performance ratings using an experimental policy-capturing design. Employees (N = 135) from different vocational backgrounds rated the overall job performance of fictitious employees in 40 scenarios based on information about their career adaptability, mental ability, conscientiousness, and job complexity. We used multilevel modeling to investigate the relative importance of each factor. Consistent with expectations, career adaptability positively predicted job performance ratings, and this effect was relatively smaller than the effects of conscientiousness and mental ability. Job complexity did not moderate the effect of career adaptability on job performance ratings, suggesting that career adaptability predicts job performance ratings in high-, medium-, and low-complexity jobs. Consistent with previous research, the effect of mental ability on job performance ratings was stronger in high- compared to low-complexity jobs. Overall, our findings provide initial evidence for the predictive validity of employees' career adaptability with regard to other people's ratings of job performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The trend of diminished funding, demands for greater efficiency and higher public accountability have led to a rapid expansion of interest in the bibliometric assessment of research performance of universities. A pilot research is conducted to provide a preliminary overview of the research performance of the building and construction schools or departments through the analysis of bibliometric indicators including the journal impact factor (JIF) published by Institute for Scientific Information (ISI). The suitability of bibliometric evaluation approaches as a measure of research quality in building and construction management research field is discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this study was to test a model of the relationship between temperament, character and job performance, in order to better understand the cause of stable individual differences in job performance. Personality was conceptualized in terms of Cloninger, Svrakic and Przybeck’s (1993) theoretical framework of personality. It was expected that Self Directedness (character) would mediate Harm Avoidance and Persistence (temperament) in the prediction of job performance. In order to test the hypotheses, a sample of 94 employee/supervisor pairs was recruited from several organizations across Australia. Participants completed a number of questionnaires online, regarding their personality traits (completed by employees) and Job Performance (completed by Supervisors). Consistent with the hypothesis, Self Directedness was found to be a moderate, direct predictor of job performance. Also consistent with the hypothesis, Self Directedness mediated Harm Avoidance in the prediction of job performance. Results show that character (Self Directedness) is important in the prediction of job performance, and also suggests that fearful, avoidant individuals are less likely to perform well in the workplace, based on their low level of character development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Aim. This paper is a report of a development and validation of a new job performance scale based on an established job performance model. Background. Previous measures of nursing quality are atheoretical and fail to incorporate the complete range of behaviours performed. Thus, an up-to-date measure of job performance is required for assessing nursing quality. Methods. Test construction involved systematic generation of test items using focus groups, a literature review, and an expert review of test items. A pilot study was conducted to determine the multidimensional nature of the taxonomy and its psychometric properties. All data were collected in 2005. Findings. The final version of the nursing performance taxonomy included 41 behaviours across eight dimensions of job performance. Results from preliminary psychometric investigations suggest that the nursing performance scale has good internal consistency, good convergent validity and good criterion validity. Conclusion. The findings give preliminary support for a new job performance scale as a reliable and valid tool for assessing nursing quality. However, further research using a larger sample and nurses from a broader geographical region is required to cross-validate the measure. This scale may be used to guide hospital managers regarding the quality of nursing care within units and to guide future research in the area.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Better management of knowledge assets has the potential to improve business processes and increase productivity. This fact has led to considerable interest in recent years in the knowledge management (KM) phenomenon, and in the main dimensions that can impact on its application in construction. However, a lack of a systematic way of assessing KM initia-tives’ contribution towards achieving organisational business objectives is evident. This paper describes the first stage of a research project intended to develop, and empirically test, a KM input-process-output framework comprising unique and well-defined theoretical constructs representing the KM process and its internal and external determinants in the context of con-struction. The paper presents the underlying principles used in operationally defining each construct through the use of extant KM literature. The KM process itself is explicitly mod-elled via a number of clearly articulated phases that ultimately lead to knowledge utilisation and capitalisation, which in turn adds value or otherwise to meeting defined business objec-tives. The main objective of the model is to reduce the impact of subjectivity in assessing the contribution made by KM practices and initiatives toward achieving performance improvements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article examined the relationship between time structure and Macan's process model of time management. This study proposed that time structure—‘appraisal of effective time usage’—would be a more parsimonious mediator than perceived control over time in the relationship between time management behaviours and outcome variables, such as job satisfaction and psychological well-being. Alternative structure models were compared using a sample of 111 university students. Model 1 tested Macan's process model of time management with perceived control over time as the mediator. Model 2 replaced perceived control over time by the construct of time structure. Model 3 examined the possibility of perceived control over time and time structure as being parallel mediators of the relationships between time management and outcomes. Results of this study showed that Model 1 and Model 2 fitted the data equally well. On the other hand, the mediated effects were small and partial in both models. This pattern of results calls for reassessment of the process model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the increasing popularity and adoption of building information modeling (BIM), the amount of digital information available about a building is overwhelming. Enormous challenges remain however in identifying meaningful and required information from a complex BIM model to support a particular construction management (CM) task. Detailed specifications of information required by different construction domains and expressive and easy-to-use BIM reasoning mechanisms are seen as an important means in addressing these challenges. This paper analyzes some of the characteristics and requirements of component-specific construction knowledge in relation to the current work practice and BIM-based applications. It is argued that domain ontologies and information extraction approaches, such as queries could significantly bring much needed support for knowledge sharing and integration of information between design, construction and facility management.