648 resultados para Construction Civil

em Queensland University of Technology - ePrints Archive


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Current trends in workforce development indicate the movement of workers within and across occupations to be the norm. In 2009, only one in three vocational education and training (VET) graduates in Australia ended up working in an occupation for which they were trained. This implies that VET enhances the employability of its graduates by equipping them with the knowledge and competencies to work in different occupations and sectors. This paper presents findings from a Government-funded study that examined the occupational mobility of selected associate professional and trades occupations within the Aged Care, Automotive and Civil Construction sectors in Queensland. The study surveyed enrolled nurses and related workers, motor mechanics and civil construction workers to analyse their patterns of occupational mobility, future work intentions, reasons for taking and leaving work, and the factors influencing them to leave or remain in their occupations. This paper also discusses the implications of findings for the training of workers in these sectors and more generally.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper investigates the teaching and learning of fractions to Indigenous adult learners in a Civil Construction Certificate Course. More specifically it explores why the use of materials is critical to building knowledge and understanding. This focus is important for two reasons. First, it allows for considerations of a trainer’s approach for teaching fractions and, second it provides insights into how adult learners can be supported with representing their practical experiences of fractions to make generalisation thus building on their knowledge and learning experiences. The paper draws on teaching episodes from an Australian Research Council funded Linkage project that investigates how mathematics is taught and learned in Certificate Courses, here, Certificate 11 in Civil Construction. Action research and decolonising methods (Smith, 1999) were used to conduct the research. Video excerpts which feature one trainer and three students are analysed and described. Findings from the data indicate that adult learners need to be supported with materials to assist with building their capacity to know and apply understandings of fractions in a range of contexts, besides construction. Without materials and where fractions are taught via pen and paper tasks, students are less likely to retain and apply fraction ideas to their Certificate Course. Further they are less likely to understand decimals because of limited understanding of fractions.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In Smit v Chan [2001] QSC 493 (Supreme Court of Queensland, S1233 of 1995, Mullins J, 21.12.2001) the sixth defendant successfully obtained an order that a complex medical negligence action be tried without a jury. This was the first application to be decided under r474 of UCPR 1999, and the decision is a significant precedent for defendants in similar cases who want to avoid the unpredictability of outcome and the inflated damages awards sometimes associated with jury trials.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An earlier CRC-CI project on ‘automatic estimating’ (AE) has shown the key benefit of model-based design methodologies in building design and construction to be the provision of timely quantitative cost evaluations. Furthermore, using AE during design improves design options, and results in improved design turn-around times, better design quality and/or lower costs. However, AEs for civil engineering structures do not exist; and research partners in the CRC-CI expressed interest in exploring the development of such a process. This document reports on these investigations. The central objective of the study was to evaluate the benefits and costs of developing an AE for concrete civil engineering works. By studying existing documents and through interviews with design engineers, contractors and estimators, we have established that current civil engineering practices (mainly roads/bridges) do not use model-based planning/design. Drawings are executed in 2D and only completed at the end of lengthy planning/design project management lifecycle stages. We have also determined that estimating plays two important, but different roles. The first is part of project management (which we have called macro level estimating). Estimating in this domain sets project budgets, controls quality delivery and contains costs. The second role is estimating during planning/design (micro level estimating). The difference between the two roles is that the former is performed at the end of various lifecycle stages, whereas the latter is performed at any suitable time during planning/design.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sending data between the construction site and an off-site design office is one of the more problematic areas in information technology for construction automation, particularly for construction defect management. The aim of this research is to investigate how mobile computing and new forms of human-computer interaction can be brought to bear on specific problems in construction management. The construction defect reporting system is one such application. Combining mobile and wireless computing technologies with a digital workbench, we have developed a system to facilitate remote telecollaboration between a construction site and an off-site engineering office. The application reported in this paper demonstrates how construction defect reporting can be streamlined by field collection of construction defect information using a mobile device and visualising the defect in a CAD model on a digital workbench in an engineering office. This paper reports on the design of the system and our tests of sending images from the construction site to the engineer’s office and positional accuracy of GPS for localization of the defect.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Australia, between 1994 and 2000, 50 construction workers were killed each year as a result of their work, the industry fatality rate, at 10.4 per 100,000 persons, is similar to the national road toll fatality rate and the rate of serious injury is 50% higher than the all industries average. This poor performance represents a significant threat to the industry’s social sustainability. Despite the best efforts of regulators and policy makers at both State and Federal levels, the incidence of death, injury and illness in the Australian construction industry has remained intransigently high, prompting an industry-led initiative to improve the occupational health and safety (OHS) performance of the Australian construction industry. The ‘Safer Construction’ project involves the development of an evidence-based Voluntary Code of Practice for OHS in the industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Survey results provide a preliminary assessment of the relative contribution of a range of tactical business strategies to innovation performance by firms in the Australian construction industry. Over 1,300 firms were surveyed in 2004, resulting in a response rate of 29%. Respondents were classified as high, medium or low innovators according to an innovation index based on the novelty and impact of their innovations and their adoption of listed technological and organizational advances. The relative significance of 23 business strategies concerning (1) employees, (2) marketing, (3) technology, (4) knowledge and (5) relationships was examined by determining the extent to which they distinguished high innovators from low innovators. The individual business strategies that most strongly distinguished high innovators were (1) ‘investing in R&D’, (2) ‘participating in partnering and alliances on projects’, (3) ‘ensuring project learnings are transferred into continuous business processes’, (4) ‘monitoring international best practice’, and (5) ‘recruiting new graduates’. Of the five types of strategies assessed, marketing strategies were the least significant in supporting innovation. The results provide practical guidance to managers in project-based industries wishing to improve their innovation performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Statistics indicate that the percentage of fatal industrial accidents arising from repair, maintenance, minor alteration and addition (RMAA) works in Hong Kong was disturbingly high and was over 56% in 2006. This paper provides an initial report of a research project funded by the Research Grants Council (RGC) of the HKSAR to address this safety issue. The aim of this study is to scrutinize the causal relationship between safety climate and safety performance in the RMAA sector. It aims to evaluate the safety climate in the RMAA sector; examine its impacts on safety performance, and recommend measures to improve safety performance in the RMAA sector. This paper firstly reports on the statistics of construction accidents arising from RMAA works. Qualitative and quantitative research methods applied in conducting the research are dis-cussed. The study will critically review these related problems and provide recommendations for improving safety performance in the RMAA sector.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

After many years of development BIM (Building Information Modelling) is starting to achieve significant penetration into the building sector of the construction industry. This paper describes the current status of BIM and the drivers that are motivating the change from 2D CAD to BIM within the building sector. The paper then discusses what the implications of the technology underlying BIM may be for the civil construction sector of the construction industry. A project carried out by the Cooperative Research Centre for Construction Innovation is used as an example of this technology as well as several international examples.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper has two main sections, the first of which presents a summarized review of the literature concerning previous studies on the implementation of ISO 9000 quality management systems (QMSs) both in global construction companies as well as in Indonesian construction firms, and the perceived correlation between organisational culture and QMS practices in the construction sector. The first section of the paper contributes to the development of the second section, which presents details of the research project being undertaken. Based on the fundamental questions that led to the development of the main research objectives, suitable research methods have been developed in order to meet these objectives. Primary data will be collected by use of a mixed methods approach, i.e., questionnaire surveys and focus group discussions/interviews in order to obtain opinions from respondents drawn from targeted ISO construction firms. Most of the data expected to be obtained will be in future be analyzed using statistical software then the findings will be discussed in order to ultimately develop a culture-based QMS framework.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry is one of major strategic importance. Its level of productivity has a significant effect on national economic growth. The analysis of published census/biannual surveys of construction by the Department of Statistics of Malaysia shows that Malaysia managed to achieve construction labour productivity growth between 1996 and 2005 despite increases in cost per employee. The decrease in unit labour costs is attributed to the value added improvement per worker through the increase in capital intensity. The marginal decline in capital productivity is due to the gestation period and the overcapacity of the industry. The civil engineering sub-sector recorded the highest labour productivity and is the most labour competitive in terms of unit labour cost and added value per labour cost. The residential sub-sectors recorded greatest change in the productivity indicators between 1996 and 2005.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Life-cycle management (LCM) has been employed in the management of construction projects for many years in order to reduce whole life cost, time, risk and improve the service to owners. However, owing to lack of an effective information sharing platform, the current LCM of construction projects is not effectively used in the construction industry. Based upon the analysis of the information flow of LCM, a virutal prototyping (VP)-based communication and collaboration information platform is proposed. Following this, the platform is customized using DASSAULT sofware. The whole process of implementing the VP-based LCM are also discussed and, from a simple case study, it is demonstrated that the VP-based communication and collaboration information platform is an effective tool to support the LCM of construction projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Accurate owner budget estimates are critical to the initial decision-to-build process for highway construction projects. However, transportation projects have historically experienced significant construction cost overruns from the time the decision to build has been taken by the owner. This paper addresses the problem of why highway projects overrun their predicted costs. It identifies the owner risk variables that contribute to significant cost overrun and then uses factor analysis, expert elicitation, and the nominal group technique to establish groups of importance ranked owner risks. Stepwise multivariate regression analysis is also used to investigate any correlation of the percentage of cost overrun with risks, together with attributes such as highway project type, indexed cost, geographics location, and project delivery method. The research results indicate a correlation between the reciprocal of project budgets size and percentage cost overrun. This can be useful for owners in determining more realistic decision-to-build highway budget estimates by taking into account the economies of scale associated with larger projects.