73 resultados para Colac (Vic.) -- Pictorial works

em Queensland University of Technology - ePrints Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports on the early stages of a design experiment in educational assessment that challenges the dichotomous legacy evident in many assessment activities. Combining social networking technologies with the sociology of education the paper proposes that assessment activities are best understood as a negotiable field of exchange. In this design experiment students, peers and experts engage in explicit, "front-end" assessment (Wyatt-Smith, 2008) to translate holistic judgments into institutional, and potentiality economic capital without adhering to long lists of pre-set criteria. This approach invites participants to use social networking technologies to judge creative works using scatter graphs, keywords and tag clouds. In doing so assessors will refine their evaluative expertise and negotiate the characteristics of creative works from which criteria will emerge (Sadler, 2008). The real-time advantages of web-based technologies will aggregate, externalise and democratise this transparent method of assessment for most, if not all, creative works that can be represented in a digital format.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes an approach to introducing fraction concepts using generic software tools such as Microsoft Office's PowerPoint to create "virtual" materials for mathematics teaching and learning. This approach replicates existing concrete materials and integrates virtual materials with current non-computer methods of teaching primary students about fractions. The paper reports a case study of a 12-year-old student, Frank, who had an extremely limited understanding of fractions. Frank also lacked motivation for learning mathematics in general and interacted with his peers in a negative way during mathematics lessons. In just one classroom session involving the seamless integration of off-computer and on-computer activities, Frank acquired a basic understanding of simple common equivalent fractions. Further, he was observed as the session progressed to be an enthusiastic learner who offered to share his learning with his peers. The study's "virtual replication" approach for fractions involves the manipulation of concrete materials (folding paper regions) alongside the manipulation of their virtual equivalent (shading screen regions). As researchers have pointed out, the emergence of new technologies does not mean old technologies become redundant. Learning technologies have not replaced print and oral language or basic mathematical understanding. Instead, they are modifying, reshaping, and blending the ways in which humankind speaks, reads, writes, and works mathematically. Constructivist theories of learning and teaching argue that mathematics understanding is developed from concrete to pictorial to abstract and that, ultimately, mathematics learning and teaching is about refinement and expression of ideas and concepts. Therefore, by seamlessly integrating the use of concrete materials and virtual materials generated by computer software applications, an opportunity arises to enhance the teaching and learning value of both materials.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: The determination of the most appropriate procurement system for a capital works project is a challenging task for public sector clients considering the array of assessment criteria that are considered and the procurement methods that are available. This is particularly pertinent to the Western Australian public sector where they have had a propensity to use traditional lump sum as the default procurement solution despite knowing that the selection of an inappropriate procurement method may lead to cost and time overruns, claims, and disputes’ on projects. This paper presents a six step procurement method evaluation approach that requires public sector agencies to consider in detail an array of options so as to obtain value for money. Design/methodology/approach: A procurement evaluation approach is developed and is examined using a focus group of 12 participants comprising of a public sector client, project team and key stakeholders. The focus group was used to examine the developed approach in the context of a real-life capital works project. Findings: The procurement method evaluation approach was deemed to be pragmatic and enabled decision-makers to re-evaluate outcomes from previous steps in the process. All focus group participants stated the six step process enabled a recommendation that was grounded in reflection and detailed evaluation. Practical implications: The developed procurement approach has enabled the public sector client evaluate the way in which they view procurement method selection and examine how they obtain ‘value for money’. Originality/value: The six step procurement approach makes use of quantitative and qualitative techniques and is reliant on discourse and reflection in making a procurement method recommendation. Consequently, the approach enables public sector clients to account for the complexities often associated with procurement selection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Obesity and type 2 diabetes mellitus (T2D) have reached epidemic proportions in many parts of the world with numbers projected to rise dramatically in coming decades (Wang and Lobstein, 2006; Zaninotto et al., 2006). In Australia, and consistent with much of the developed world, the problem has been described as a ‘juggernaut’ that is out of control (Zimmet and James, 2007). Unfortunately the burgeoning problem of non-communicable diseases, including obesity and T2D, is also impacting developing nations as populations are undergoing a nutrition transition (Caballero, 2005). The increased prevalence of overweight and obesity in children, adolescents and adults in both the developed and developing world is consistent with reductions in all forms of physical activity (Brownson et al., 2005). This brief paper provides an overview of the importance of physical activity and an outline of physical activity intervention studies with particular reference to the growing years. As many interventions studies involving physical activity have been undertaken in the context of childhood obesity prevention (Lobstein et al., 2004), and an increasing proportion of the childhood population is overweight or obese, this is a major focus of discussion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: As part of a comprehensive research study looking at implementing PPPs, interviews with experienced researchers were conducted to realize their views on private sector involvement in public works projects. Design / methodology / approach: Amongst these interviews, five were launched with academics from Hong Kong and Australia, and two were conducted with Legislative Councillors of the Hong Kong Special Administration Region (HKSAR) government. Findings: The interview findings show that both Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. The interviewees highlighted that “Different risk profiles” and “Private sector more innovative / efficient” were the main differences between projects that were procured by PPP and traditionally. Other differences include risk transfer. In a PPP arrangement the public sector passes on a substantial amount of the project risks to the private sector, whereas in a traditional case the public sector would take the largest responsibility in bearing these risks. Another common feature of the private sector is that they tend to be more efficient and innovative when compared to the public sector hence their expertise is often reflected in PPP projects. The interviewees agreed that the key performance indicators for PPP projects were unique depending on the individual project. The critical success factors mentioned by both groups of interviewees included “Transparent process”, “Project dependent” and “Market need”. Due to the fact that PPP projects tend to be large scaled costly projects, adequate transparency in the process is necessary in order to demonstrate that a fair selection and tendering process is conducted. A market need for the project is also important to ensure that the project will be financially secure and that the private sector can make a reasonable profit to cover their project expenditure. Originality / value: The findings from this study have enabled a comparative analysis between the views of researchers in two completely different jurisdictions. With the growing popularity to implement PPP projects, it is believed that the results presented in this paper would be of interest to the industry at large.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose : The Hong Kong Special Administrative Region (referred to as Hong Kong from here onwards) is an international leading commercial hub particularly in Asia. In order to keep up its reputation a number of large public works projects have been considered. Public Private Partnership (PPP) has increasingly been suggested for these projects, but the suitability of using this procurement method in Hong Kong is yet to be studied empirically. The findings presented in this paper will specifically consider whether PPPs should be used to procure public works projects in Hong Kong by studying the attractive and negative factors for adopting PPP. Design/methodology/approach : As part of this study a questionnaire survey was conducted with industrial practitioners. The respondents were requested to rank the importance of fifteen attractive factors and thirteen negative factors for adopting PPP. Findings : The results found that in general the top attractive factors ranked by respondents from Hong Kong were efficiency related, these included (1) ‘Provide an integrated solution (for public infrastructure / services)’; (2) ‘Facilitate creative and innovative approaches’; and (3) ‘Solve the problem of public sector budget restraint’. It was found that Australian respondents also shared similar findings to those in Hong Kong, but the United Kingdom respondents showed a higher priority to those economic driven attractive factors. Also, the ranking of the attractive and negative factors for adopting PPP showed that on average the attractive factors were scored higher than the negative factors. Originality/value : The results of this research have enabled a comparison of the attractive and negative factors for adopting PPP between three administrative systems. These findings have confirmed that PPP is a suitable means to procure large public projects which are believed to be useful and interesting to PPP researchers and practitioners.