228 resultados para Civil service pensioners
em Queensland University of Technology - ePrints Archive
Resumo:
This research investigates Bhutan Civil Service Human Resource Management strategies, policies and practices, and their contribution to achieving the national goal of Gross National Happiness. The study finds that the HRM of the Bhutanese civil service is meeting its strategic objective of contributing to GNH. The civil service in Bhutan plays an important role in socio-economic development, influences private sector practices, strengthens good governance and provides continuity to the government. Participants in the study were government ministers and senior, highly experienced civil servants. A model of civil service HRM in Bhutan is developed.
Resumo:
While forensic psychology is commonly associated with the criminal and family law domains, its ambit to offer skills and knowledge at the legal interface also makes it particularly suited to the civil law domain. At this time, civil law is arguably the least represented legislative area in terms of psychological research and professional commentary. However, it is also a broad area, with its very breadth providing scope for research consideration, as urged by Greene. The purposes of this article are (1) to review the broad role of the psychologist in the conduct of civil litigation matters in Australia, (2) to assist the novice to the area by indicating a non-exhaustive list of potentially ambiguous terms and concepts common to the conduct of professional practice, and; (3) to highlight, as an example, one area of practice not only where legal direction demands professional pragmatism but also where opportunity arises for psychological research to vitally address a major social issue.
Resumo:
This paper presents the measurements of strain and the subsequent stress analysis on an in-service cast iron water main buried in reactive soil. The results indicate that the pipe crown experienced predominantly tensile stresses during drying in summer and, subsequently, these stresses reduce, eventually leading to compressive stresses as the soil swells with increase in moisture content with the approach of winter. It is also evident that flexural movement caused by thermal stresses and soil pressure has led to downward bending of the pipe in summer and subsequent upward movement in winter. The limited data collected from pipe strains and strengths indicate that it is possible for pipe capacity to be exceeded by thermal and soil stresses leading to pipe failure, provided the pipe has undergone significant corrosion.
Resumo:
In an age where financial transactions are conducted worldwide and mobility of citizens throughout the world is common, lawyers seeking to serve Bankruptcy Notices and Creditor’s Petitions encounter many problems. To assist lawyers in overcoming some of the service problems that are arising as a result of this changing world, a number of recent cases are considered that highlight a number of issues, including American Express Australia Limited v Michaels [2010] FMCA 103, Deputy Commissioner of Taxation v Barnes (2008) 70 ATR 776; [2008] FMCA 7, Battenberg v Restom & Ors (2005) 223 ALR 692; upheld by the Full Federal Court in Battenberg v Restrom and Ors (2006) 149 FCR 128 at 133; [2006] FCAFC 20 and Envee Energy Pty Ltd (In Liquidation) v Stockford [2007] FMCA 1426. While the fact situation of every bankruptcy case will differ, recent decisions may assist lawyers in dealing effectively with bankruptcy matters in these times of transition. Lawyers can facilitate completion of the litigious process within the relevant legislative framework in order to satisfy their responsibility to clients and to the Court by considering this case law.
Resumo:
Corrosion is a common phenomenon and critical aspects of steel structural application. It affects the daily design, inspection and maintenance in structural engineering, especially for the heavy and complex industrial applications, where the steel structures are subjected to hash corrosive environments in combination of high working stress condition and often in open field and/or under high temperature production environments. In the paper, it presents the actual engineering application of advanced finite element methods in the predication of the structural integrity and robustness at a designed service life for the furnaces of alumina production, which was operated in the high temperature, corrosive environments and rotating with high working stress condition.
Resumo:
Columns and walls in buildings are subjected to a number of load increments during the construction and service stages. The combination of these load increments and poor quality construction can cause defects in these structural components. In addition, defects can also occur due to accidental or deliberate actions by users of the building during construction and service stages. Such defects should be detected early so that remedial measures can be taken to improve life time serviceability and performance of the building. This paper uses micro and macro model upgrading methods during construction and service stages of a building based on the mass and stiffness changes to develop a comprehensive procedure for locating and detecting defects in columns and walls of buildings. Capabilities of the procedure are illustrated through examples.
Resumo:
This paper presents the results of a recent investigation into Insulated Rail Joint Tie Plate fatigue failures. In particular it focuses on the results of data obtained through field strain gauge and accelerometer measurements of in-service Insulated Rail Joint Tie Plates. These measurements have identified a significant variability in the strains present in similar joints operating under identical load conditions. This variability in stress invariably has a significant influence on the life of the joints. The results of rainflow counting and a fatigue analysis are also presented.
Resumo:
Purpose – The purpose of this paper is to examine the quality of service of a South East Asian country's military facilities management organisation. Design/methodology/approach – An interview survey and questionnaire survey were used to obtain a description and summary of stakeholders’ expectations and the extent to which they were being satisfied by the services provided. Findings – The method provides a useful means of identifying and prioritising varying expectations between stakeholder groups and of indicating any mismatch in expectations in the management of military facilities. Social implications – The development and use of a method to test and improve the effectiveness and efficiency of the management of military facilities helps in providing better value for money. Originality/value – In addition to re-affirming Parasuraman's overall dimensions of service expectation, the empirical summary of the stakeholders’ expectations obtained in this way is of practical value for the service provider in developing a strategy for expectation management. For the case studied, it is also apparent that although the current processes in service delivery are well understood by all involved stakeholders, there is a need for further improvement with regards to their expectation levels. It is also one of the very few reported studies on the management of military facilities.
Resumo:
Railroad corridors contain large number of Insulated Rail Joints (IRJs) that act as safety critical elements in the circuitries of the signaling and broken rail identification systems. IRJs are regarded as sources of excitation for the passage of loaded wheels leading to high impact forces; these forces in turn cause dips, cross levels and twists to the railroad geometry in close proximity to the sections containing the IRJs in addition to the local damages to the railhead of the IRJs. Therefore, a systematic monitoring of the IRJs in railroad is prudent to mitigate potential risk of their sudden failure (e.g., broken tie plates) under the traffic. This paper presents a simple method of periodic recording of images using time-lapse photography and total station surveying measurements to understand the ongoing deterioration of the IRJs and their surroundings. Over a 500 day period, data were collected to examine the trends in narrowing of the joint gap due to plastic deformation the railhead edges and the dips, cross levels and twists caused to the railroad geometry due to the settlement of ties (sleepers) around the IRJs. The results reflect that the average progressive settlement beneath the IRJs is larger than that under the continuously welded rail, which leads to excessive deviation of railroad profile, cross levels and twists.
Resumo:
This book provides a comprehensive analysis of the practical and theoretical issues encountered in Australian civil procedure. Each chapter features in-depth questions and notes together with lists of further reading to aid understanding of the issue. It also examines and discusses each substantive and procedural step in the trial process. Topics include jurisdiction of a court to consider a matter, limitations of actions, commencing proceedings, service, interlocutory proceedings, pleading, gathering evidence, trial and appeal, costs and practice directions. Each of the state, territory and federal procedures is covered.