680 resultados para Capital budgeting method
em Queensland University of Technology - ePrints Archive
Value-oriented process modeling : integrating financial perspectives into business process re-design
Resumo:
Purpose – Financial information about costs and return on investments are of key importance to strategic decision-making but also in the context of process improvement or business engineering. In this paper we propose a value-oriented approach to business process modeling based on key concepts and metrics from operations and financial management, to aid decision making in process re-design projects on the basis of process models. Design/methodology/approach – We suggest a theoretically founded extension to current process modeling approaches, and delineate a framework as well as methodical support to incorporate financial information into process re-design. We use two case studies to evaluate the suggested approach. Findings – Based on two case studies, we show that the value-oriented process modeling approach facilitates and improves managerial decision-making in the context of process re-design. Research limitations / implications – We present design work and two case studies. More research is needed to more thoroughly evaluate the presented approach in a variety of real-life process modeling settings. Practical implications – We show how our approach enables decision makers to make investment decisions in process re-design projects, and also how other decisions, for instance in the context of enterprise architecture design, can be facilitated. Originality/value – This study reports on an attempt to integrate financial considerations into the act of process modeling, in order to provide more comprehensive decision making support in process re-design projects.
Resumo:
The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.
Resumo:
In this paper we identify elements in Marx´s economic and political writings that are relevant to contemporary critical discourse analysis (CDA). We argue that Marx can be seen to be engaging in a form of discourse analysis. We identify the elements in Marx´s historical materialist method that support such a perspective, and exemplify these in a longitudinal comparison of Marx´s texts.
Resumo:
In this paper we identify elements in Marx’s economic and political writings that are relevant to contemporary critical discourse analysis (CDA). We argue that Marx can be seen to be engaging in a form of discourse analysis. We identify the elements in Marx’s historical materialist method that support such a perspective, and exemplify these in longitudinal comparison of Marx’s texts.
Resumo:
Principal Topic Although corporate entrepreneurship is of vital importance for long-term firm survival and growth (Zahra and Covin, 1995), researchers still struggle with understanding how to manage corporate entrepreneurship activities. Corporate entrepreneurship consists of three parts: innovation, venturing, and renewal processes (Guth and Ginsberg, 1990). Innovation refers to the development of new products, venturing to the creation of new businesses, and renewal to redefining existing businesses (Sharma, and Chrisman, 1999; Verbeke et al., 2007). Although there are many studies focusing on one of these aspects (cf. Burgelman, 1985; Huff et al., 1992), it is very difficult to compare the outcomes of these studies due to differences in contexts, measures, and methodologies. This is a significant lack in our understanding of CE, as firms engage in all three aspects of CE, making it important to compare managerial and organizational antecedents of innovation, venturing and renewal processes. Because factors that may enhance venturing activities may simultaneously inhibit renewal activities. The limited studies that did empirically compare the individual dimensions (cf. Zahra, 1996; Zahra et al., 2000; Yiu and Lau, 2008; Yiu et al., 2007) generally failed to provide a systematic explanation for potential different effects of organizational antecedents on innovation, venturing, and renewal. With this study we aim to investigate the different effects of structural separation and social capital on corporate entrepreneurship activities. The access to existing and the development of new knowledge has been deemed of critical importance in CE-activities (Floyd and Wooldridge, 1999; Covin and Miles, 2007; Katila and Ahuja, 2002). Developing new knowledge can be facilitated by structurally separating corporate entrepreneurial units from mainstream units (cf. Burgelman, 1983; Hill and Rothaermel, 2003; O'Reilly and Tushman, 2004). Existing knowledge and resources are available through networks of social relationships, defined as social capital (Nahapiet and Ghoshal, 1998; Yiu and Lau, 2008). Although social capital has primarily been studied at the organizational level, it might be equally important at top management level (Belliveau et al., 1996). However, little is known about the joint effects of structural separation and integrative mechanisms to provide access to social capital on corporate entrepreneurship. Could these integrative mechanisms for example connect the separated units to facilitate both knowledge creation and sharing? Do these effects differ for innovation, venturing, and renewal processes? Are the effects different for organizational versus top management team integration mechanisms? Corporate entrepreneurship activities have for example been suggested to take place at different levels. Whereas innovation is suggested to be a more bottom-up process, strategic renewal is a more top-down process (Floyd and Lane, 2000; Volberda et al., 2001). Corporate venturing is also a more bottom-up process, but due to the greater required resource commitments relative to innovation, it ventures need to be approved by top management (Burgelman, 1983). As such we will explore the following key research question in this paper: How do social capital and structural separation on organizational and TMT level differentially influence innovation, venturing, and renewal processes? Methodology/Key Propositions We investigated our hypotheses on a final sample of 240 companies in a variety of industries in the Netherlands. All our measures were validated in previous studies. We targeted a second respondent in each firm to reduce problems with single-rater data (James et al., 1984). We separated the measurement of the independent and the dependent variables in two surveys to create a one-year time lag and reduce potential common method bias (Podsakoff et al., 2003). Results and Implications Consistent with our hypotheses, our results show that configurations of structural separation and integrative mechanisms have different effects on the three aspects of corporate entrepreneurship. Innovation was affected by organizational level mechanisms, renewal by integrative mechanisms on top management team level and venturing by mechanisms on both levels. Surprisingly, our results indicated that integrative mechanisms on top management team level had negative effects on corporate entrepreneurship activities. We believe this paper makes two significant contributions. First, we provide more insight in what the effects of ambidextrous organizational forms (i.e. combinations of differentiation and integration mechanisms) are on venturing, innovation and renewal processes. Our findings show that more valuable insights can be gained by comparing the individual parts of corporate entrepreneurship instead of focusing on the whole. Second, we deliver insights in how management can create a facilitative organizational context for these corporate entrepreneurship activities.
Resumo:
Purpose: The determination of the most appropriate procurement system for a capital works project is a challenging task for public sector clients considering the array of assessment criteria that are considered and the procurement methods that are available. This is particularly pertinent to the Western Australian public sector where they have had a propensity to use traditional lump sum as the default procurement solution despite knowing that the selection of an inappropriate procurement method may lead to cost and time overruns, claims, and disputes’ on projects. This paper presents a six step procurement method evaluation approach that requires public sector agencies to consider in detail an array of options so as to obtain value for money. Design/methodology/approach: A procurement evaluation approach is developed and is examined using a focus group of 12 participants comprising of a public sector client, project team and key stakeholders. The focus group was used to examine the developed approach in the context of a real-life capital works project. Findings: The procurement method evaluation approach was deemed to be pragmatic and enabled decision-makers to re-evaluate outcomes from previous steps in the process. All focus group participants stated the six step process enabled a recommendation that was grounded in reflection and detailed evaluation. Practical implications: The developed procurement approach has enabled the public sector client evaluate the way in which they view procurement method selection and examine how they obtain ‘value for money’. Originality/value: The six step procurement approach makes use of quantitative and qualitative techniques and is reliant on discourse and reflection in making a procurement method recommendation. Consequently, the approach enables public sector clients to account for the complexities often associated with procurement selection.
Resumo:
In recent years, practitioners and researchers alike have turned their attention to knowledge management (KM) in order to increase organisational performance (OP). As a result, many different approaches and strategies have been investigated and suggested for how knowledge should be managed to make organisations more effective and efficient. However, most research has been undertaken in the for-profit sector, with only a few studies focusing on the benefits nonprofit organisations might gain by managing knowledge. This study broadly investigates the impact of knowledge management on the organisational performance of nonprofit organisations. Organisational performance can be evaluated through either financial or non-financial measurements. In order to evaluate knowledge management and organisational performance, non-financial measurements are argued to be more suitable given that knowledge is an intangible asset which often cannot be expressed through financial indicators. Non-financial measurement concepts of performance such as the balanced scorecard or the concept of Intellectual Capital (IC) are well accepted and used within the for-profit and nonprofit sectors to evaluate organisational performance. This study utilised the concept of IC as the method to evaluate KM and OP in the context of nonprofit organisations due to the close link between KM and IC: Indeed, KM is concerned with managing the KM processes of creating, storing, sharing and applying knowledge and the organisational KM infrastructure such as organisational culture or organisational structure to support these processes. On the other hand, IC measures the knowledge stocks in different ontological levels: at the individual level (human capital), at the group level (relational capital) and at the organisational level (structural capital). In other words, IC measures the value of the knowledge which has been managed through KM. As KM encompasses the different KM processes and the KM infrastructure facilitating these processes, previous research has investigated the relationship between KM infrastructure and KM processes. Organisational culture, organisational structure and the level of IT support have been identified as the main factors of the KM infrastructure influencing the KM processes of creating, storing, sharing and applying knowledge. Other research has focused on the link between KM and OP or organisational effectiveness. Based on existing literature, a theoretical model was developed to enable the investigation of the relation between KM (encompassing KM infrastructure and KM processes) and IC. The model assumes an association between KM infrastructure and KM processes, as well as an association between KM processes and the various levels of IC (human capital, structural capital and relational capital). As a result, five research questions (RQ) with respect to the various factors of the KM infrastructure as well as with respect to the relationship between KM infrastructure and IC were raised and included into the research model: RQ 1 Do nonprofit organisations which have a Hierarchy culture have a stronger IT support than nonprofit organisations which have an Adhocracy culture? RQ 2 Do nonprofit organisations which have a centralised organisational structure have a stronger IT support than nonprofit organisations which have decentralised organisational structure? RQ 3 Do nonprofit organisations which have a stronger IT support have a higher value of Human Capital than nonprofit organisations which have a less strong IT support? RQ 4 Do nonprofit organisations which have a stronger IT support have a higher value of Structural Capital than nonprofit organisations which have a less strong IT support? RQ 5 Do nonprofit organisations which have a stronger IT support have a higher value of Relational Capital than nonprofit organisations which have a less strong IT support? In order to investigate the research questions, measurements for IC were developed which were linked to the main KM processes. The final KM/IC model contained four items for evaluating human capital, five items for evaluating structural capital and four items for evaluating relational capital. The research questions were investigated through empirical research using a case study approach with the focus on two nonprofit organisations providing trade promotions services through local offices worldwide. Data for the investigation of the assumptions were collected via qualitative as well as quantitative research methods. The qualitative study included interviews with representatives of the two participating organisations as well as in-depth document research. The purpose of the qualitative study was to investigate the factors of the KM infrastructure (organisational culture, organisational structure, IT support) of the organisations and how these factors were related to each other. On the other hand, the quantitative study was carried out through an online-survey amongst staff of the various local offices. The purpose of the quantitative study was to investigate which impact the level of IT support, as the main instrument of the KM infrastructure, had on IC. Overall several key themes were found as a result of the study: • Knowledge Management and Intellectual Capital were complementary with each other, which should be expressed through measurements of IC based on KM processes. • The various factors of the KM infrastructure (organisational culture, organisational structure and level of IT support) are interdependent. • IT was a primary instrument through which the different KM processes (creating, storing, sharing and applying knowledge) were performed. • A high level of IT support was evident when participants reported higher level of IC (human capital, structural capital and relational capital). The study supported previous research in the field of KM and replicated the findings from other case studies in this area. The study also contributed to theory by placing the KM research within the nonprofit context and analysing the linkage between KM and IC. From the managerial perspective, the findings gave clear indications that would allow interested parties, such as nonprofit managers or consultants to understand more about the implications of KM on OP and to use this knowledge for implementing efficient and effective KM strategies within their organisations.
Resumo:
Local climate is a critical element in the design of energy efficient buildings. In this paper, ten years of historical weather data in Australia's eight capital cities were profiled and analysed to characterize the variations of climatic variables in Australia. The method of descriptive statistics was employed. Either the pattern of cumulative distribution and/or the profile of percentage distribution are presented. It was found that although weather variables vary with different locations, there is often a good, nearly linear relation between a weather variable and its cumulative percentage for the majority of middle part of the cumulative curves. By comparing the slopes of these distribution profiles, it may be possible to determine the relative range of changes of the particular weather variables for a given city. The implications of these distribution profiles of key weather variables on energy efficient building design are also discussed.
Resumo:
Purpose–The growing debate in the literature indicates that the initiative to implement Knowledge Based Urban Development (KBUD) approaches in urban development process is neither simple nor quick. Many research efforts has therefore, been put forward to the development of appropriate KBUD framework and KBUD practical approaches. But this has lead to a fragmented and incoherent methodological approach. This paper outlines and compares a few most popular KBUD frameworks selected from the literature. It aims to identify some key and common features in the effort to achieve a unified method of KBUD framework. Design/methodology/approach–This paper reviews, examines and identifies various popular KBUD frameworks discussed in the literature from urban planners’ viewpoint. It employs a content analysis technique i.e. a research tool used to determine the presence of certain words or concepts within texts or sets of texts. Originality/value–The paper reports on the key and common features of a few selected most popular KBUD frameworks. The synthesis of the results is based from a perspective of urban planners. The findings which encompass a new KBUD framework incorporating the key and common features will be valuable in setting a platform to achieve a unified method of KBUD. Practical implications –The discussion and results presented in this paper should be significant to researchers and practitioners and to any cities and countries that are aiming for KBUD. Keywords – Knowledge based urban development, Knowledge based urban development framework, Urban development and knowledge economy
Resumo:
The aim of this article is to position social capital as a theoretical framework for investigating online communities, specifically pro-am operations. It will review pertinent literature on social capital and the future of journalism in this context, and detail how the broader field of Sociology and this dynamic field of Journalism converge to produce a unique opportunity for pro-am research. Currently, much concern has been expressed regarding the future of journalism institutions in society, and while journalism itself is seen as a cornerstone of democracy, the form of structures that facilitate such practice has been questioned. Compounding this problem is a lack of research that produces data suitable for meta-analysis. For example, case-study data of start-up operations in this volatile field do not provide sufficient grounds for conclusions that could result in evidence-based policy. In response to these dynamics, this article will propose experimentation as a method of research for pro-am start-ups.
Resumo:
Heavy haul railway lines are important and expensive items of infrastructure operating in an environment which is increasingly focussed on risk-based management and constrained profit margins. It is vital that costs are minimised but also that infrastructure satisfies failure criteria and standards of reliability which account for the random nature of wheel-rail forces and of the properties of the materials in the track. In Australia and the USA, concrete railway sleepers/ties are still designed using methods which the rest of the civil engineering world discarded decades ago in favour of the more rational, more economical and probabilistically based, limit states design (LSD) concept. This paper describes a LSD method for concrete sleepers which is based on (a) billions of measurements over many years of the real, random wheel-rail forces on heavy haul lines, and (b) the true capacity of sleepers. The essential principles on which the new method is based are similar to current, widely used LSD-based standards for concrete structures. The paper proposes and describes four limit states which a sleeper must satisfy, namely: strength; operations; serviceability; and fatigue. The method has been applied commercially to two new major heavy haul lines in Australia, where it has saved clients millions of dollars in capital expenditure.
Resumo:
Fleck and Johnson (Int. J. Mech. Sci. 29 (1987) 507) and Fleck et al. (Proc. Inst. Mech. Eng. 206 (1992) 119) have developed foil rolling models which allow for large deformations in the roll profile, including the possibility that the rolls flatten completely. However, these models require computationally expensive iterative solution techniques. A new approach to the approximate solution of the Fleck et al. (1992) Influence Function Model has been developed using both analytic and approximation techniques. The numerical difficulties arising from solving an integral equation in the flattened region have been reduced by applying an Inverse Hilbert Transform to get an analytic expression for the pressure. The method described in this paper is applicable to cases where there is or there is not a flat region.