570 resultados para Building waste
em Queensland University of Technology - ePrints Archive
Resumo:
Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.
Resumo:
Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.
Resumo:
Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.
Resumo:
Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.
Resumo:
The market of building retrofits is increasingly more intensified as existing buildings are aging. The building retrofit projects involve existing buildings which impose constraints on stakeholders throughout the project process. They are also risky, complex, less predictable and difficult to be well planned with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors, but they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. This paper first discusses the requirements of waste management in building retrofit projects considering specific project characteristics and work natures, and highlights the importance of involving SMEs in waste planning and management through an appropriate way. By utilizing semi-structured interviews, this research develops a process model for SMEs to be applied in waste management. A collaboration scenario is also developed for collaborative waste planning and management by SMEs as subcontractors and large companies as main contractors. Findings from the paper will promote coordination of project delivery and waste management in building retrofit projects, and improve the involvement and performance of SMEs in dealing with waste problems.
Resumo:
The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.
Resumo:
Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.
Resumo:
The Regenerating Construction Project for the CRC for Construction Innovation aims to assist in the delivery of demonstrably superior ‘green’ buildings. Components of the project address eco-efficient redesign, achieving a smaller ecological footprint, enhancing indoor environment and minimising waste in design and construction. The refurbishment of Council House 1 for Melbourne City Council provides an opportunity to develop and demonstrate tools that will be of use for commercial building refurbishment generally. It is hoped that the refurbishment will act as an exemplar project to demonstrate environmentally friendly possibilities for office building refurbishment.
Resumo:
In recent years considerable effort has gone into quantifying the reuse and recycling potential of waste generated by residential construction. Unfortunately less information is available for the commercial refurbishment sector. It is hypothesised that significant economic and environmental benefit can be derived from closer monitoring of the commercial construction waste stream. With the aim of assessing these benefits, the authors are involved in ongoing case studies to record both current standard practice and the most effective means of improving the eco-efficiency of materials use in office building refurbishments. This paper focuses on the issues involved in developing methods for obtaining the necessary information on better waste management practices and establishing benchmark indicators. The need to create databases to establish benchmarks of waste minimisation best practice in commercial construction is stressed. Further research will monitor the delivery of case study projects and the levels of reuse and recycling achieved in directly quantifiable ways
Resumo:
The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.
Resumo:
Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.
Resumo:
As the sustainability awareness rises globally, the construction industry is under increasing pressure to improve efficiency and project delivery. The implementation of Industrialised Building Systems (IBS), for which utility components are built offsite, has the potential of promoting sustainability deliverables. This can be achieved by better control of production environment, minimising construction waste, using efficient building material energy, and stabilising work conditions. As a unique building technology, IBS has not been effectively implemented in Malaysia. Possible reasons may include limited understanding among stakeholders on the IBS potential and its relevance to sustainability. This warrants studies on the sustainability issues of IBS design, construction, operation and maintenance, A framework is being developed through research to assess performance criteria related to sustainability, which should be considered during IBS design and application in the most consistent and systematic way. This paper discusses how these sustainability performance criteria are examined in a continuing research project and the processes conducive to implementing sustainable IBS in Malaysia. Existing tools, indicators and guidelines are reviewed, analysed and grouped according to characteristics and application. The research also hopes to produce guidelines for stakeholders to incorporate sustainability issues and concepts into IBS applications.
Resumo:
Levels of waste within the construction industry need to be reduced for environmental and economic reasons. Changing people's wasteful behaviour can make a significant contribution. This paper describes a research project that used Ajzen's 'theory of planned behaviour' to investigate the attitudinal forces that shape behaviour at the operative level. It concludes that operatives see waste as an inevitable by-product of construction activity. Attitudes towards waste management are not negative, although they are pragmatic and impeded by perceptions of a lack of managerial commitment. Waste management is perceived as a low project priority, and there is an absence of appropriate resources and incentives to support it. A theory of waste behaviour is proposed for the construction industry, and recommendations are made to help managers improve operatives' attitudes towards waste.
Resumo:
Construction and demolition (C&D) waste occupies the largest share of overall waste generation in many countries. However, waste management practices and outcomes may differ between countries. For instance, in Australia, C&D waste recovery is continuously improving during the last years but the amount of C&D waste increases every year, as there has been little improvement in waste avoidance and minimization. In contrast, in Germany, waste generation remains constant over many years despite the continuous economic growth. The waste recycling rate in Germany is one of the highest in the world. However, most waste recycled is from demolition work rather than from waste generated during new construction. In addition, specific laws need to be developed to further reduce landfill of non-recycled waste. Despite of the differences, C&D waste generation and recovery in both countries depend on the effectiveness of the statutory framework, which regulates their waste management practices. This is an issue in other parts of the world as well. Therefore countries can learn from each other to improve their current statutory framework for C&D waste management. By taking Germany and Australia as an example, possible measures to improve current practices of C&D waste management through better statutory tools are identified in this paper. After providing an overview of the statutory framework of both countries and their status in waste generation and recovery, a SWOT analysis is conducted to identify strengths, weaknesses, opportunities and threats of the statutory tools. Recommendations to improve the current statutory frameworks, in order to achieve less waste generation and more waste recovery in the construction industry are provided for the German and Australian government and they can also be transferred to other countries.
Resumo:
Building prefabrication is known as Industrialised Building Systems (IBS) in Malaysia. This construction method possesses unique characteristics that are central to sustainable construction. For example, offsite construction enables efficient management of construction wastage by identifying major causes of waste arising during both the design and construction stages. These causes may then be eliminated by the improvement process in IBS component's manufacturing. However, current decisions on using IBS are typically financial driven and hinder the wider ranged adoption. In addition, current IBS misconceptions and the failure of rating schemes in evaluating the sustainability of IBS affect its implementation. A new approach is required to provide better understanding on the sustainability potential of IBS among stakeholders. Such approach should also help project the outcomes of each levels of decision-making to respond to social, economy and environmental challenges. This paper presents interim findings of research aimed at developing a framework for sustainable IBS development and suggests a more holistic approach to achieve sustainability. A framework of embedding sustainability factors is considered in three main phases of IBS construction; 1) Pre-construction, 2) Construction and 3) Post-construction phase. SWOT analysis was used to evaluate the strengths, weaknesses, opportunities and threats involved in the IBS implementations. The action plans are formulated from the analysis of sustainable objectives. This approach will show where and how sustainability should be integrated to improve IBS construction. A mix of quantitative and qualitative methodology was used in this research to explore the potential of IBS in integrating sustainability. The tools used in the study are questionnaires and semi-structured interviews. Outcomes from these tools lead to the identification of viable approaches involving 18 critical factors to improve sustainability in IBS constructions. Finally, guidelines for decision-making are being developed to provide a useful source of information and support to mutual benefit of the stakeholders in integrating sustainability issues and concepts into IBS applications.