14 resultados para 319920111110-2-track
em Queensland University of Technology - ePrints Archive
Resumo:
Maintenance trains travel in convoy. In Australia, only the first train of the convoy pays attention to the track sig- nalization (the other convoy vehicles simply follow the preceding vehicle). Because of human errors, collisions can happen between the maintenance vehicles. Although an anti-collision system based on a laser distance meter is already in operation, the existing system has a limited range due to the curvature of the tracks. In this paper, we introduce an anti-collision system based on vision. The two main ideas are, (1) to warp the camera image into an image where the rails are parallel through a projective transform, and (2) to track the two rail curves simultaneously by evaluating small parallel segments. The performance of the system is demonstrated on an image dataset.
Resumo:
The XML Document Mining track was launched for exploring two main ideas: (1) identifying key problems and new challenges of the emerging field of mining semi-structured documents, and (2) studying and assessing the potential of Machine Learning (ML) techniques for dealing with generic ML tasks in the structured domain, i.e., classification and clustering of semi-structured documents. This track has run for six editions during INEX 2005, 2006, 2007, 2008, 2009 and 2010. The first five editions have been summarized in previous editions and we focus here on the 2010 edition. INEX 2010 included two tasks in the XML Mining track: (1) unsupervised clustering task and (2) semi-supervised classification task where documents are organized in a graph. The clustering task requires the participants to group the documents into clusters without any knowledge of category labels using an unsupervised learning algorithm. On the other hand, the classification task requires the participants to label the documents in the dataset into known categories using a supervised learning algorithm and a training set. This report gives the details of clustering and classification tasks.
Resumo:
Athletic coaching can involve observation of a motor control task and then proposing guidance to an athlete about how the task performance can be developed. Coaches can identify the technique elements that seem to hinder performance and then provide instruction. Recently, a variety of training methods were proposed to enhance sprint performance, however a number of authors have identified these methods as characterised by low scientific evaluation or support (Brown & Vescovi, 2012; Jones, Bezodis, & Thompson, 2009). This article will outline a scientifically robust neuromuscular theory underlying poor movement techniques that may be visible when coaches observe sprint performance. The goal of this article is to inform the sprint coach of a method to identify and correct suboptimal biomechanics to enhance athletic performance.
Resumo:
The INEX 2011 Relevance Feedback track offered a refined approach to the evaluation of Focused Relevance Feedback algorithms through simulated exhaustive user feedback. Run in largely identical fashion to the Relevance Feedback track in INEX 2010[2], we simulated a user-in-the loop by re-using the assessments of ad-hoc retrieval obtained from real users who assess focused ad-hoc retrieval submissions. We present the evaluation methodology, its implementation, and experimental results obtained for four submissions from two participating organisations. As the task and evaluation methods did not change between INEX 2010 and now, explanations of these details from the INEX 2010 version of the track have been repeated verbatim where appropriate.
Resumo:
The Bluetooth technology is being increasingly used to track vehicles throughout their trips, within urban networks and across freeway stretches. One important opportunity offered by this type of data is the measurement of Origin-Destination patterns, emerging from the aggregation and clustering of individual trips. In order to obtain accurate estimations, however, a number of issues need to be addressed, through data filtering and correction techniques. These issues mainly stem from the use of the Bluetooth technology amongst drivers, and the physical properties of the Bluetooth sensors themselves. First, not all cars are equipped with discoverable Bluetooth devices and the Bluetooth-enabled vehicles may belong to some small socio-economic groups of users. Second, the Bluetooth datasets include data from various transport modes; such as pedestrian, bicycles, cars, taxi driver, buses and trains. Third, the Bluetooth sensors may fail to detect all of the nearby Bluetooth-enabled vehicles. As a consequence, the exact journey for some vehicles may become a latent pattern that will need to be extracted from the data. Finally, sensors that are in close proximity to each other may have overlapping detection areas, thus making the task of retrieving the correct travelled path even more challenging. The aim of this paper is twofold. We first give a comprehensive overview of the aforementioned issues. Further, we propose a methodology that can be followed, in order to cleanse, correct and aggregate Bluetooth data. We postulate that the methods introduced by this paper are the first crucial steps that need to be followed in order to compute accurate Origin-Destination matrices in urban road networks.
Resumo:
Purpose To observe the incidence rates of hamstring strain injuries (HSIs) across different competition levels and ages during the Penn Relays Carnival. Methods Over a 3-year period all injuries treated by the medical staff were recorded. The type of injury, anatomic location, event in which the injury occurred, competition level and demographic data were documented. Absolute and relative HSI (per 1000 participants) were determined and odds ratios (OR) were calculated between genders, competition levels and events. Results Throughout the study period 48,473 athletes registered to participate in the Penn Relays Carnival, with 118 HSIs treated by the medical team. High school females displayed lesser risk of HSI than high school males (OR = 0.55, p = 0.021), and masters athletes were more likely than high school (OR = 4.26, p < 0.001) and college (OR = 3.55, p = 0.001) level athletes to suffer a HSI. The 4x400m relay displayed a greater likelihood of HSI compared to the 4x100m relay (OR = 1.77, p = 0.008). Conclusions High school males and masters levels athletes are most likely to suffer HSI, and there is higher risk in 400m events compared to 100m events.
Resumo:
Transition zones between bridge decks and rail tracks suffer early failure due to poor interaction between rail vehicles and sudden changes of stiffness. This has been an ongoing problem to rail industry and yet still no systematic studies appear to have been taken to maintain a gradually smoothening transmission of forces between the bridge and its approach. Differential settlement between the bridge deck and rail track in the transition zone is the fundamental issue, which negatively impacts the rail industry by causing passenger discomfort, early damage to infrastructure and vehicle components, speed reduction, and frequent maintenance cycles. Identification of mechanism of the track degradation and factors affecting is imperative to design any mitigation method for reducing track degradation rate at the bridge transition zone. Unfortunately this issue is still not well understood, after conducting a numbers of reviews to evaluate the key causes, and introducing a wide range of mitigation techniques. In this study, a comprehensive analysis of the available literature has been carried out to develop either a novel design framework or a mitigation technique for the bridge transition zone. This paper addresses three critical questions in relation to the track degradation at transition zone: (1) what are the causes of bridge transition track degradation?; (2) what are the available mitigation techniques in reducing the track degradation rate?; (3) what are the factors affecting on poor performance of the existing mitigation techniques?. It is found that the absence of soil-water response, dynamic loading response, and behaviour of geotechnical characteristics under long-term conditions in existing track transition design frameworks critically influence on the failures of existing mitigation techniques. This paper also evaluates some of the existing design frameworks to identify how each design framework addresses the track degradation at the bridge transition zone.
Resumo:
Background Few studies have examined acute injuries in track and field in both elite and sub-elite athletes. Purpose To observe the absolute and relative rates of injury in track and field athletes across a wide range of competition levels and ages during three years of the Penn Relays Carnival to assist with future medical coverage planning and injury prevention strategies. Study design: Descriptive epidemiology study. Methods Over a 3-year period all injuries treated by the medical staff were recorded on a standardised injury report form. Absolute injury rates (absolute number of injuries) and relative injury rates (number of injuries per 1000 participants) were determined and odds ratios (OR) of injury rates were calculated between sexes, competition levels and events. Injuries were also broken down into major or minor medical or orthopedic injuries. Results Throughout the study period 48,473 competing athletes participated in the Penn Relays Carnival, and 436 injuries were sustained. For medical coverage purposes, the relative rate of injury subtypes was greatest for minor orthopedic injuries (5.71 injuries per 1000 participants), followed by minor medical injuries (3.42 injuries per 1000 participants), major medical injuries (0.69 injuries per 1000 participants) and major orthopedic injuries (0.18 injuries per 1000 participants). College/elite level athletes displayed the lowest relative injury rate (7.99 injuries per 1000 participants), which was significantly less than high school (9.87 injuries per 1000 participants) and masters level athletes (16.33 injuries per 1000 participants). Males displayed a greater likelihood of suffering a minor orthopedic injury compared to females (OR = 1.36, 95% CI = 1.06 to 1.75; χ2 = 5.73, p = 0.017) but were less likely to sustain a major medical injury (OR = 0.33, 95% CI = 0.15 to 0.75; χ2 = 7.75, p = 0.005). Of the three most heavily participated in events, the 4 x 400m relay displayed the greatest relative injury rate (13.6 injuries per 1000 participants) compared to the 4 x 100 and 4 x 200m relay. Conclusions Medical coverage teams for future large scale track and field events need to plan for at least two major orthopedic and seven major medical injuries per 1000 participants. Male track and field athletes, particularly masters level male athletes, are at greater risk of injury compared to other genders and competition levels.
Resumo:
Successful management of design changes is critical for the efficient delivery of construction projects. Building Information Modeling (BIM) is envisioned to play an important role in integrating design, construction and facility management processes through coordinated changes throughout the project life-cycle. BIM currently provides significant benefits in coordinating changes across different views in a single model, and identifying conflicts between different discipline-specific models. However, current BIM tools provide limited support in managing changes across several discipline-specific models. This paper describes an approach to represent, coordinate, and track changes within a collaborative multi-disciplinary BIM environment. This approach was informed by a detailed case study of a large, complex, fast-tracked BIM project where we investigated numerous design changes, analyzed change management processes, and evaluated existing BIM tools. Our approach characterises design changes in an ontology to represent changed component attributes, dependencies between components, and change impacts. It explores different types of dependencies amongst different design changes and describes how a graph based approach and dependency matrix could assist with automating the propagation and impact of changes in a BIM-based project delivery process.
Resumo:
The present study deals with two dimensional, numerical simulation of railway track supporting system subjected to dynamic excitation force. Under plane strain condition, the coupled finite-infinite elements to represent the near and far field stress distribution and thin layer interface element was employed to model the interfacial behavior between sleepers and ballast. To account for the relative debonding, slipping and crushing that could take place in the contact area between the sleepers and ballast, modified Mohr-Coulomb criterion was adopted. Furthermore an attempt has been made to consider the elasto-plastic material non-linearity of the railway track supporting media by employing different constitutive models to represent steel, concrete and supporting materials. Based on the proposed physical and constitutive modeling a code has been developed for dynamic loads. The applicability of the developed F.E code has been demonstrated by analyzing a real railway supporting structure.
Resumo:
The present contribution deals with the numerical modelling of railway track-supporting systems-using coupled finite-infinite elements-to represent the near and distant field stress distribution, and also employing a thin layer interface element to account for the interfacial behaviour between sleepers and ballast. To simulate the relative debonding, slipping and crushing at the contact area between sleepers and ballast, a modified Mohr-Coulomb criterion was adopted. Further more an attempt was made to consider the elasto plastic materials’ non-linearity of the railway track supporting media by employing different constitutive models to represent steel, concrete and other supporting materials. It is seen that during an incremental-iterative mode of load application, the yielding initially started from the edge of the sleepers and then flowed vertically downwards and spread towards the centre of the railway supporting system.
Resumo:
The Bruneau-Jarbidge eruptive center (BJEC) in the central Snake River Plain, Idaho, USA consists of the Cougar Point Tuff (CPT), a series of ten, high-temperature (900-1000°C) voluminous ignimbrites produced over the explosive phase of volcanism (12.8-10.5 Ma) and more than a dozen equally high-temperature rhyolite lava flows produced during the effusive phase (10.5-8 Ma). Spot analyses by ion microprobe of oxygen isotope ratios in 210 zircons demonstrate that all of the eruptive units of the BJEC are characterized by zircon δ¹⁸O values ≤ 2.5‰, thus documenting the largest low δ¹⁸O silicic volcanic province known on Earth (>10⁴ km³). There is no evidence for voluminous normal δ¹⁸O magmatism at the BJEC that precedes generation of low δ¹⁸O magmas as there is at other volcanic centers that generate low δ¹⁸O magmas such as Heise and Yellowstone. At these younger volcanic centers of the hotspot track, such low δ¹⁸O magmas represent ~45 % and ~20% respectively of total eruptive volumes. Zircons in all BJEC tuffs and lavas studied (23 units) document strong δ¹⁸O depletion (median CPT δ¹⁸OZrc = 1.0‰, post-CPT lavas = 1.5‰) with the third member of the CPT recording an excursion to minimum δ¹⁸O values (δ¹⁸OZrc= -1.8‰) in a supereruption > 2‰ lower than other voluminous low δ¹⁸O rhyolites known worldwide (δ¹⁸OWR ≤0.9 vs. 3.4‰). Subsequent units of the CPT and lavas record a progressive recovery in δ¹⁸OZrc to ~2.5‰ over a ~ 4 m.y. interval (12 to 8 Ma). We present detailed evidence of unit-to-unit systematic patterns in O isotopic zoning in zircons (i.e. direction and magnitude of Δcore-rim), spectrum of δ¹⁸O in individual units, and zircon inheritance patterns established by re-analysis of spots for U-Th-Pb isotopes by LA-ICPMS and SHRIMP. In conjunction with mineral thermometry and magma compositions, these patterns are difficult to reconcile with the well-established model for "cannibalistic" low δ¹⁸O magma genesis at Heise and Yellowstone. We present an alternative model for the central Snake River Plain using the modeling results of Leeman et al. (2008) for ¹⁸O depletion as a function of depth in a mid-upper crustal protolith that was hydrothermally altered by infiltrating meteoric waters prior to the onset of silicic magmatism. The model proposes that BJEC silicic magmas were generated in response to the propagation of a melting front, driven by the incremental growth of a vast underlying mafic sill complex, over a ~5 m.y. interval through a crustal volume in which a vertically asymmetric δ¹⁸OWR gradient had previously developed that was sharply inflected from ~ -1 to 10‰ at mid-upper crustal depths. Within the context of the model, data from BJEC zircons are consistent with incremental melting and mixing events in roof zones of magma reservoirs that accompany surfaceward advance of the coupled mafic-silicic magmatic system.
Resumo:
The National Energy Efficient Building Project (NEEBP) Phase One report, published in December 2014, investigated “process issues and systemic failures” in the administration of the energy performance requirements in the National Construction Code. It found that most stakeholders believed that under-compliance with these requirements is widespread across Australia, with similar issues being reported in all states and territories. The report found that many different factors were contributing to this outcome and, as a result, many recommendations were offered that together would be expected to remedy the systemic issues reported. To follow up on this Phase 1 report, three additional projects were commissioned as part of Phase 2 of the overall NEEBP project. This Report deals with the development and piloting of an Electronic Building Passport (EBP) tool – a project undertaken jointly by pitt&sherry and a team at the Queensland University of Technology (QUT) led by Dr Wendy Miller. The other Phase 2 projects cover audits of Class 1 buildings and issues relating to building alterations and additions. The passport concept aims to provide all stakeholders with (controlled) access to the key documentation and information that they need to verify the energy performance of buildings. This trial project deals with residential buildings but in principle could apply to any building type. Nine councils were recruited to help develop and test a pilot electronic building passport tool. The participation of these councils – across all states – enabled an assessment of the extent to which these councils are currently utilising documentation; to track the compliance of residential buildings with the energy performance requirements in the National Construction Code (NCC). Overall we found that none of the participating councils are currently compiling all of the energy performance-related documentation that would demonstrate code compliance. The key reasons for this include: a major lack of clarity on precisely what documentation should be collected; cost and budget pressures; low public/stakeholder demand for the documentation; and a pragmatic judgement that non-compliance with any regulated documentation requirements represents a relatively low risk for them. Some councils reported producing documentation, such as certificates of final completion, only on demand, for example. Only three of the nine council participants reported regularly conducting compliance assessments or audits utilising this documentation and/or inspections. Overall we formed the view that documentation and information tracking processes operating within the building standards and compliance system are not working to assure compliance with the Code’s energy performance requirements. In other words the Code, and its implementation under state and territory regulatory processes, is falling short as a ‘quality assurance’ system for consumers. As a result it is likely that the new housing stock is under-performing relative to policy expectations, consuming unnecessary amounts of energy, imposing unnecessarily high energy bills on occupants, and generating unnecessary greenhouse gas emissions. At the same time, Councils noted that the demand for documentation relating to building energy performance was low. All the participant councils in the EBP pilot agreed that documentation and information processes need to work more effectively if the potential regulatory and market drivers towards energy efficient homes are to be harnessed. These findings are fully consistent with the Phase 1 NEEBP report. It was also agreed that an EBP system could potentially play an important role in improving documentation and information processes. However, only one of the participant councils indicated that they might adopt such a system on a voluntary basis. The majority felt that such a system would only be taken up if it were: - A nationally agreed system, imposed as a mandatory requirement under state or national regulation; - Capable of being used by multiple parties including councils, private certifiers, building regulators, builders and energy assessors in particular; and - Fully integrated into their existing document management systems, or at least seamlessly compatible rather than a separate, unlinked tool. Further, we note that the value of an EBP in capturing statistical information relating to the energy performance of buildings would be much greater if an EBP were adopted on a nationally consistent basis. Councils were clear that a key impediment to the take up of an EBP system is that they are facing very considerable budget and staffing challenges. They report that they are often unable to meet all community demands from the resources available to them. Therefore they are unlikely to provide resources to support the roll out of an EBP system on a voluntary basis. Overall, we conclude from this pilot that the public good would be well served if the Australian, state and territory governments continued to develop and implement an Electronic Building Passport system in a cost-efficient and effective manner. This development should occur with detailed input from building regulators, the Australian Building Codes Board (ABCB), councils and private certifiers in the first instance. This report provides a suite of recommendations (Section 7.2) designed to advance the development and guide the implementation of a national EBP system.