197 resultados para software management methodology


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Phenomenology is a term that has been described as a philosophy, a research paradigm, a methodology, and equated with qualitative research. In this paper first we clarify phenomenology by tracing its movement both as a philosophy and as a research method. Next we make a case for the use of phenomenology in empirical investigations of management phenomena. The paper discusses a selection of central concepts pertaining to phenomenology as a scientific research method, which include description, phenomenological reduction and free imaginative variation. In particular, the paper elucidates the efficacy of Giorgi’s descriptive phenomenological research praxis as a qualitative research method and how its utility can be applied in creating a deeper and richer understanding of management practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This case study reports on the impact and business transformation of an IMP³rove assessment and follow-up workshop on Australian SME LEVESYS (www.levesys.com), which was undertaken by QMI Solutions. Innovation was not a foreign term to the company, which focuses on the development of enterprise resource planning (ERP) software for the Australian construction sector. However, before seeing and undergoing the IMP³rove process, this company had difficulty articulating their innovation problems and, therefore, had not achieved growth targets from its R&D efforts. This case study highlights the role of IMP³rove in assisting LEVESYS to take the first step in transforming itself through innovation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a summary description of the doctoral thesis investigating the field of project management (PM) deployment. Researchers will be informed of the current contributions within this topic and of the possible further investigations and researches. The decision makers and practitioners will be aware of a set of tools addressing the PM deployment with new perspectives. Design/methodology/approach – Research undertaken with the thesis is based on quantitative methods using time series statistics (time distance analysis) and comparative and correlation analysis aimed to better define and understand the PM deployment within and between countries or groups. Findings – The results suggest a project management deployment index (PMDI) to objectively measure the PM deployment based on the concept of certification. A proposed framework to empirically benchmark the PM deployment between countries by integrating the PMDI time series with the two dimensional comparative analysis of Sicherl. The correlation analysis within Hoftsede cultural framework shows the impact of the national culture dimensions on the PM deployment. The forecasting model shows a general continual growth trend of the PM deployment, with continual increase in the time distance between the countries. Research limitations/implications – The PM researchers are offered an empirical quantification on which they can construct further investigations and understanding of this phenomenon. The number of possible units that can be studied offers wide possibilities to replicate the thesis work. New researches can be undertaken to investigate further the contribution of other social or economical indicators, or to refine and enrich the definition of the PMDI indicator. Practical implications – These results have important implications on the PM deployment approaches. The PMDI measurements and time series comparisons facilitate considerably the measurement and benchmarking between the units (e.g. countries) and against targets, while the readiness setting of the studied unit (in terms of development and cultural levels) impacts the PM deployment within this country. Originality/value – This paper provides a summary of cutting-edge research work in the studied field of PM deployment and a link to the published works that researchers can use to help them understand the thesis research as well as how it can be extended.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

IT-supported field data management benefits on-site construction management by improving accessibility to the information and promoting efficient communication between project team members. However, most of on-site safety inspections still heavily rely on subjective judgment and manual reporting processes and thus observers’ experiences often determine the quality of risk identification and control. This study aims to develop a methodology to efficiently retrieve safety-related information so that the safety inspectors can easily access to the relevant site safety information for safer decision making. The proposed methodology consists of three stages: (1) development of a comprehensive safety database which contains information of risk factors, accident types, impact of accidents and safety regulations; (2) identification of relationships among different risk factors based on statistical analysis methods; and (3) user-specified information retrieval using data mining techniques for safety management. This paper presents an overall methodology and preliminary results of the first stage research conducted with 101 accident investigation reports.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to examine the quality of service of a South East Asian country's military facilities management organisation. Design/methodology/approach – An interview survey and questionnaire survey were used to obtain a description and summary of stakeholders’ expectations and the extent to which they were being satisfied by the services provided. Findings – The method provides a useful means of identifying and prioritising varying expectations between stakeholder groups and of indicating any mismatch in expectations in the management of military facilities. Social implications – The development and use of a method to test and improve the effectiveness and efficiency of the management of military facilities helps in providing better value for money. Originality/value – In addition to re-affirming Parasuraman's overall dimensions of service expectation, the empirical summary of the stakeholders’ expectations obtained in this way is of practical value for the service provider in developing a strategy for expectation management. For the case studied, it is also apparent that although the current processes in service delivery are well understood by all involved stakeholders, there is a need for further improvement with regards to their expectation levels. It is also one of the very few reported studies on the management of military facilities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Organizations invest heavily in Supply Chain Management Systems expecting the benefits promised by the software vendors and the implementation partners. However, both academic and industry reports suggest that there is growing dissatisfaction among client organizations due to an increasing gap in benefits purported by the software vendors and benefits realised by the client. In order to better manage expectations of the client organization, this study proposes a Benefit Expectation Management Framework for Supply Chain Management Systems, based on Expectation-Confirmation Theory. This study derives 60 expected benefits of Supply Chain Management Systems through 41 vendor-reported customer stories and academic papers. Through comparing those benefits with the received benefits by a case organization that has implemented SAP Supply Chain Management Systems for seven years, two salient factors – long timetable and multiple stakeholders – have been identified as the controlling factors affecting the confirmation level of Supply Chain Management System expectations and further impacting the satisfaction of a client organization. The case study also highlights the likely causes for realized benefits and enduring issues in relation to the Supply Chain Management Systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study seeks to answer the question of “why is policy innovation in Indonesia, in particular reformed state asset management laws and regulations, stagnant?” through an empirical and qualitative approach, identifying and exploring potential impeding influences to the full and equal implementation of said laws and regulations. The policies and regulations governing the practice of state asset management has emerged as an urgent question among many countries worldwide (Conway, 2006; Dow, Gillies, Nichols, & Polen, 2006; Kaganova, McKellar, & Peterson, 2006; McKellar, 2006b) for there is heightened awareness of the complex and crucial role that state assets play in public service provision. Indonesia is an example of such country, introducing a ‘big-bang’ reform in state asset management laws, policies, regulations, and technical guidelines. Two main reasons propelled said policy innovation: a) world-wide common challenges in state asset management practices - such as incomplete information system, accountability, and governance adherence/conceptualisation (Kaganova, McKellar and Peterson 2006); and b) unfavourable state assets audit results in all regional governments across Indonesia. The latter reasoning is emphasised, as the Indonesian government admits to past neglect in ensuring efficiency and best practice in its state asset management practices. Prior to reform there was euphoria of building and developing state assets and public infrastructure to support government programs of the day. Although this euphoria resulted in high growth within Indonesia, there seems to be little attention paid to how state assets bought/built is managed. Up until 2003-2004 state asset management is considered to be minimal; inventory of assets is done manually, there is incomplete public sector accounting standards, and incomplete financial reporting standards (Hadiyanto 2009). During that time transparency, accountability, and maintenance state assets was not the main focus, be it by the government or the society itself (Hadiyanto 2009). Indonesia exemplified its enthusiasm in reforming state asset management policies and practices through the establishment of the Directorate General of State Assets in 2006. The Directorate General of State Assets have stressed the new direction that it is taking state asset management laws and policies through the introduction of Republic of Indonesia Law Number 38 Year 2008, which is an amended regulation overruling Republic of Indonesia Law Number 6 Year 2006 on Central/Regional Government State Asset Management (Hadiyanto, 2009c). Law number 38/2008 aims to further exemplify good governance principles and puts forward a ‘the highest and best use of assets’ principle in state asset management (Hadiyanto, 2009a). The methodology of this study is that of qualitative case study approach, with a triangulated data collection method of document analysis (all relevant state asset management laws, regulations, policies, technical guidelines, and external audit reports), semi-structured interviews, and on-site observation. Empirical data of this study involved a sample of four Indonesian regional governments and 70 interviews, performed during January-July 2010. The analytical approach of this study is that of thematic analysis, in an effort to identify common influences and/or challenges to policy innovation within Indonesia. Based on the empirical data of this study specific impeding influences to state asset management reform is explored, answering the question why innovative policy implementation is stagnant. An in-depth analysis of each influencing factors to state asset management reform, and the attached interviewee’s opinions for each factor, suggests the potential of an ‘excuse rhetoric’; whereby the influencing factors identified are a smoke-screen, or are myths that public policy makers and implementers believe in; as a means to explain innovative policy stagnancy. This study offers insights to Indonesian policy makers interested in ensuring the conceptualisation and full implementation of innovative policies, particularly, although not limited to, within the context of state asset management practices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: Tacit knowledge is perceived as the most strategically important resource of the construction organisation, and the only renewable and sustainable base for its activities and competitiveness. Knowledge management (KM) activities that deal with tacit knowledge are essential in helping an organisation to achieve its long-term organisational objectives. The purpose of this paper is to provide empirical evidence for the stronger strategic role of tacit KM in comparison to explicit KM. Design/methodology/approach: A questionnaire survey was administered in 2005 to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal business environment, intensity of KM activities as executed by targeted organisations, and contribution of these activities to business performance (BP). A total of 149 usable responses were received from 99 organisations representing about 38 per cent of the sampling frame. The statistical analyses helped to map the reported KM activities into two groups that, respectively, deal with tacit and explicit knowledge. The sensitivity to variations of organisational policies and strength of association with BP in relation to the two groups of KM activities were also compared empirically. A total of 15 interviews with the managerial and professional staff of leading contractors was undertaken to provide insightful narratives of KM implementations. Findings: The effective implementation of organisational policies, such as encouraging innovations and strengthening strategic guidance for KM, would facilitate human interactions of tacit KM. Higher intensity of activities in managing tacit knowledge would ultimately help the organisations to achieve economic gain in the long run. Originality/value: The stronger strategic role of tacit KM is empirically investigated and established within the context of construction organisations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – Within the construction industry there is a growing awareness of the need for linking knowledge management (KM) to business strategy, organisational objectives and existing performance measures. This study was undertaken within the context of construction organisations, and attempts to provide the empirical evidence about the relationships between KM activities and organisational business performance. Design/methodology/approach – A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to investigate the opinions of construction professionals regarding the intensity of KM activities and business performance within their organisations. In parallel to the survey, semi-structured interviews were undertaken to provide qualitative insights that helped to clarify and deepen understanding of the KM process within the context of the research target. Findings – The investigation shows that knowledge utilisation is the strongest contributor to general business performance. In addition, the impact of KM activities on the lagging performance indicators of the Balanced Scorecard (BSC), such as “financial performance”, is in an indirect manner, and through the leading indicators such as performance from “internal process” as well as “learning and growth” perspectives. Originality/value – The study empirically establishes the linkage between intensity of KM activities and business performance, and demonstrates that KM strategies need to be explicitly formulated and measured according to organisational business objectives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose: Recent knowledge management (KM) literature suggests that KM activities are influenced by the elements of the internal business environment (BE) of organisations. This paper attempts to provide some unique insights into the contextual input of the KM process through empirically identifying the major factors (i.e. “forces”) within the internal BE of construction organisations operating in Hong Kong, and investigating their impact on the intensity of KM activities. Design/methodology/approach: A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal BE and intensity of KM activities as executed by targeted organisations. A total of 149 usable responses were received from 99 organisations representing about 38 percent of the research population. In parallel, to the survey, a total of 15 semi-structured interviews were undertaken to provide more insights into the phenomenon under investigation. Findings: Supported by the empirical and qualitative evidence, this study established that firstly, both organisational and technical environments have the capacity to either positively or negatively impact the intensity of KM activities, and both environments serve as stimuli in increasing each other's dynamism; secondly, certain types of KM activities are stronger “energy receivers” and easily to be “powered up” by manipulating factors representing these two environments. Then, through interactions between KM activities, the intensity of the whole strategic KM cycle will be increased thus helping to strengthen organisational competitive advantage.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – Recent knowledge management (KM) literature suggests that KM activities are not independent of each other, rather they interact with each other to form a process which receives input from both external and internal business environments, and then produces new knowledge for future utilisation. The purpose of this paper is to empirically investigate the relationships between KM activities within the construction business context in order to identify and map the pattern of their interactions. Design/methodology/approach – A questionnaire survey was administered to a sample of contracting organisations operating in Hong Kong to elicit opinions of construction professionals on the intensity of KM activities currently being executed by their organisations in order to facilitate knowledge capture, sharing and utilisation. More than 150 respondents from 99 organisations responded to the survey. Additionally, a total of 15 semi-structured interviews were undertaken to provide a unique perspective on many of the challenges facing local construction organisations when dealing with KM activities. Findings – Knowledge acquisition and utilisation play paramount roles in the development of the organisational knowledge asset. The higher the intensity of these two activities, the larger the organisational knowledge pool which, in turn, demands greater knowledge dissemination capacity. This dissemination capacity enables more active and intense responses to market changes and clients' needs, thus facilitating and stimulating acquisition and utilisation of new tacit knowledge, thus improving organisational business performance. Originality/value – Interactions between KM activities were empirically investigated, from a strategic perspective, in the construction business context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although topic detection and tracking techniques have made great progress, most of the researchers seldom pay more attention to the following two aspects. First, the construction of a topic model does not take the characteristics of different topics into consideration. Second, the factors that determine the formation and development of hot topics are not further analyzed. In order to correctly extract news blog hot topics, the paper views the above problems in a new perspective based on the W2T (Wisdom Web of Things) methodology, in which the characteristics of blog users, context of topic propagation and information granularity are investigated in a unified way. The motivations and features of blog users are first analyzed to understand the characteristics of news blog topics. Then the context of topic propagation is decomposed into the blog community, topic network and opinion network, respectively. Some important factors such as the user behavior pattern, opinion leader and network opinion are identified to track the development trends of news blog topics. Moreover, a blog hot topic detection algorithm is proposed, in which news blog hot topics are identified by measuring the duration, topic novelty, attention degree of users and topic growth. Experimental results show that the proposed method is feasible and effective. These results are also useful for further studying the formation mechanism of opinion leaders in blogspace.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – Business process management (BPM) requires a holistic perspective that includes managing the culture of an organization to achieve objectives of efficient and effective business processes. Still, the specifics of a BPM-supportive organizational culture have not been examined so far. Thus, the purpose of this paper is to identify the characteristics of a cultural setting supportive of BPM objectives. Design/methodology/approach – The paper examines the constituent values of a BPM-supportive cultural setting through a global Delphi study with BPM experts from academia and practice and explore these values in a cultural value framework. Findings – The paper empirically identifies and defines four key cultural values supporting BPM, viz., customer orientation, excellence, responsibility, and teamwork. The paper discusses the relationships between these values and identifies a particular challenge in managing these seemingly competing values. Research limitations/implications – The identification and definition of these values represents a first step towards the operationalization (and empirical analysis) of what has been identified as the concept of BPM culture, i.e. a culture supportive of achieving BPM objectives. Practical implications – Identifying these cultural values provides the basis for developing an instrument that can measure how far an existing cultural context is supportive of BPM. This, in turn, is fundamental for identifying measures towards achieving a BPM culture as a necessary, yet not sufficient means to obtain BPM success. Originality/value – The paper examines which cultural values create an environment receptive for BPM and, thus, specifies the important theoretical construct BPM culture. In addition, the paper raises awareness for realizing these values in a BPM context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Management of groundwater systems requires realistic conceptual hydrogeological models as a framework for numerical simulation modelling, but also for system understanding and communicating this to stakeholders and the broader community. To help overcome these challenges we developed GVS (Groundwater Visualisation System), a stand-alone desktop software package that uses interactive 3D visualisation and animation techniques. The goal was a user-friendly groundwater management tool that could support a range of existing real-world and pre-processed data, both surface and subsurface, including geology and various types of temporal hydrological information. GVS allows these data to be integrated into a single conceptual hydrogeological model. In addition, 3D geological models produced externally using other software packages, can readily be imported into GVS models, as can outputs of simulations (e.g. piezometric surfaces) produced by software such as MODFLOW or FEFLOW. Boreholes can be integrated, showing any down-hole data and properties, including screen information, intersected geology, water level data and water chemistry. Animation is used to display spatial and temporal changes, with time-series data such as rainfall, standing water levels and electrical conductivity, displaying dynamic processes. Time and space variations can be presented using a range of contouring and colour mapping techniques, in addition to interactive plots of time-series parameters. Other types of data, for example, demographics and cultural information, can also be readily incorporated. The GVS software can execute on a standard Windows or Linux-based PC with a minimum of 2 GB RAM, and the model output is easy and inexpensive to distribute, by download or via USB/DVD/CD. Example models are described here for three groundwater systems in Queensland, northeastern Australia: two unconfined alluvial groundwater systems with intensive irrigation, the Lockyer Valley and the upper Condamine Valley, and the Surat Basin, a large sedimentary basin of confined artesian aquifers. This latter example required more detail in the hydrostratigraphy, correlation of formations with drillholes and visualisation of simulation piezometric surfaces. Both alluvial system GVS models were developed during drought conditions to support government strategies to implement groundwater management. The Surat Basin model was industry sponsored research, for coal seam gas groundwater management and community information and consultation. The “virtual” groundwater systems in these 3D GVS models can be interactively interrogated by standard functions, plus production of 2D cross-sections, data selection from the 3D scene, rear end database and plot displays. A unique feature is that GVS allows investigation of time-series data across different display modes, both 2D and 3D. GVS has been used successfully as a tool to enhance community/stakeholder understanding and knowledge of groundwater systems and is of value for training and educational purposes. Projects completed confirm that GVS provides a powerful support to management and decision making, and as a tool for interpretation of groundwater system hydrological processes. A highly effective visualisation output is the production of short videos (e.g. 2–5 min) based on sequences of camera ‘fly-throughs’ and screen images. Further work involves developing support for multi-screen displays and touch-screen technologies, distributed rendering, gestural interaction systems. To highlight the visualisation and animation capability of the GVS software, links to related multimedia hosted online sites are included in the references.