547 resultados para Spacelab Project.
Resumo:
In sustainable development projects, as well as other types of projects, knowledge transfer is important for the organisations managing the project. Nevertheless, knowledge transfer among employees does not happen automatically and it has been found that the lack of social networks and the lack of trust among employees are the major barriers to effective knowledge transfer. Social network analysis has been recognised as a very important tool for improving knowledge transfer in the project environment. Transfer of knowledge is more effective where it depends heavily on social networks and informal dialogue. Based on the theory of social capital, social capital consists of two parts: conduits network and resource exchange network. This research studies the relationships among performance, the resource exchange network (such as the knowledge network) and the relationship network (such as strong ties network, energy network, and trust network) at the individual and project levels. The aim of this chapter is to present an approach to overcoming the lack of social networks and lack of trust to improve knowledge transfer within project-based organisations. This is to be done by identifying the optimum structure of relationship networks and knowledge networks within small and medium projects. The optimal structure of the relationship networks and knowledge networks is measured using two dimensions: intra-project and inter-project. This chapter also outlines an extensive literature review in the areas of social capital, knowledge management and project management, and presents the conceptual model of the research approach.
Resumo:
Presented as part of the Sampled Festival at Sadlers Wells UK in January 2009, PIPP #2 continues the exploration of the first installation (PIPP #1 Leeds) and asks audiences to connect with an interactive work presented in the foyer of a major dance festival. Literally choreographing their own dances on the walls of the venue, pedestrians re-connect with the architectural surrounds generating unique memories of self.
Resumo:
The Silk Road Project was a practice-based research project investigating the potential of motion capture technology to inform perceptions of embodiment in dance performance. The project created a multi-disciplinary collaborative performance event using dance performance and real-time motion capture at Deakin University’s Deakin Motion Lab. Performances at Deakin University, December 2007.
Resumo:
Carbon capture and storage (CCS) is considered to be an integral transitionary measure in the mitigation of the global greenhouse gas emissions from our continued use of fossil fuels. Regulatory frameworks have been developed around the world and pilot projects have been commenced. However, CCS processes are largely untested at commercial scales and there are many unknowns associated with the long terms risks from these storage projects. Governments, including Australia, are struggling to develop appropriate, yet commercially viable, regulatory approaches to manage the uncertain long term risks of CCS activities. There have been numerous CCS regimes passed at the Federal, State and Territory levels in Australia. All adopt a different approach to the delicate balance facilitating projects and managing risk. This paper will examine the relatively new onshore and offshore regimes for CCS in Australia and the legal issues arising in relation to the implementation of CCS projects. Comparisons will be made with the EU CCS Directive where appropriate.
Resumo:
The increasing prevalence of new media technologies and the rise of citizen journalism has coincided with a crisis in industrial journalism –as the figure of the "journalist as hero" is fading, new media forms have facilitated the production of news content "from below" by citizens and "pro-am" journalists. Participation in an action-research project run during the 2007 Australian Federal Election, youdecide 2007, allowed the authors to gain first-hand insights into the progress of citizen-led news media in Australia, but also allowed us to develop an account of what the work of facilitating citizen journalism involves. These insights are important to understanding the future of professional journalism and journalism education, as more mainstream media organizations move to accommodate and harness user-created content. The paper considers the relevance of citizen journalism projects as forms of R&D for understanding news production and distribution in participatory media cultures, and the importance of grounded case studies for moving beyond normative debates about new media and the future of journalism.
Resumo:
Project focused group work is significant in developing social and personal skills as well as extending the ability to identify, formulate and solve engineering problems. As a result of increasing undergraduate class sizes, along with the requirement for many students to work part-time, group projects, peer and collaborative learning are seen as a fundamental part of engineering education. Group formation, connection to learning objectives and fairness of assessment has been widely reported as major issues that leave students dissatisfied with group project based units. Several strategies were trialled including a study of formation of groups by different methods across two engineering disciplines over the past 2 years. Other strategies involved a more structured approach to assessment practices of civil and electrical engineering disciplines design units. A confidential online teamwork management tool was used to collect and collate student self and peer assessment ratings and used for both formative feedback as well as assessment purposes. Student satisfaction and overall academic results in these subjects have improved since the introduction of these interventions. Both student and staff feedback highlight this approach as enhancing student engagement and satisfaction, improved student understanding of group roles, reducing number of dysfunctional groups whilst requiring less commitment of academic resources.
Resumo:
The Australian report for the Global Media Monitoring Project 2010 (GMMP 2010) involved a study of 374 stories that were sampled from 26 Australian newspapers, radio and television stations, and internet news services on 10 November 2009. This snapshot of reporting on that day suggests that women are under-represented in the Australian news media as both the sources and creators of news. Females made up only 24% of the 1012 news sources who were heard, read about or seen in the stories that were studied. Neglect of female sources was particularly noticeable in sports news. Women made up only 1% of the 142 sources who were talked about or quoted in sports stories. Female sources of news were disproportionately portrayed as celebrities and victims. Although women made up only 24% of sources overall, they comprised 44% of victims of crimes, accidents, war, health problems, or discrimination. Unsurprisingly, women made up 32% of sources in stories about violent crimes and 29% in stories about disasters, accidents or emergencies – usually in the role of victim. Females were commonly defined in terms of their status as a mother, daughter, wife, sister or other family relationship. Family status was mentioned for 33% of women quoted or discussed in the news stories compared to only 13% of male sources. Women also made up 75% of sources described as homemakers or parents. The Australian GMMP 2010 study also indicates a gender division among the journalists who wrote or presented the news. Only 32% of the stories were written or presented by female reporters and newsreaders. The gender inequality was again most evident in sports journalism. Findings from the Australian report also contributed to the GMMP 2010 Global Report and the Pacific GMMP 2010 Regional Report, which are available at http://whomakesthenews.org/gmmp/gmmp-reports/gmmp-2010-reports
Resumo:
Delivering infrastructure projects involves many stakeholders. Their responsibilities and authorities vary over the course of the project lifecycle - from establishing the project parameters and performance requirements, to operating and maintaining the completed infrastructure. To ensure the successful delivery of infrastructure projects, it is important for the project management team to identify and manage the stakeholders and their requirements. This chapter discusses the management of stakeholders in delivering infrastructure projects, from their conception to completion. It includes managing the stakeholders for project selection and involving them to improve project constructability, operability and maintainability.
Resumo:
The Government of Indonesia (GoI) increasingly relies on the private sector financing to build and operate infrastructures through public private partnership (PPP) schemes. However, PPP does not automatically provide the solution for the financing scheme due to value for money (VFM) issues. The procurement authority must show whether a PPP proposal is the optimal solution that provides best VFM outcome. The paper presents a literature review of comparing quantitative VFM methodology for PPP infrastructure project procurement in Indonesia and Australia. Public Sector Comparator (PSC) is used to assess the potential project VFM quantitatively in Australia. In Indonesia, the PSC has not been applied, where the PPP procurement authority tends to utilize a common project evaluation method that ignores the issues of risk. Unlike the conventional price bid evaluation, the PSC enables a financial comparison including costs/gains and risks. Since the construction of PSC is primarily on risk management approach, it can facilitate risk negotiation processes between the involved parties. The study indicates that the quantitative VFM methodology of PSC is potentially applicable in Indonesia for water supply sector. Various supporting regulations are available that emphasize the importance of VFM and risk management in infrastructure investment. However, the study also reveals a number of challenges that need to be anticipated, such as the need of a more comprehensive PPP policy at both central and local government level, a more specific legal instrument for bidding evaluation method and the issue of institutional capacity development in PPP Units at the local level.
Resumo:
This paper reviews some past emphases in IHRM, and recommends that IHR teachers and practitioners consider using project management methodologies to tighten the focus of our diverse activities.
Resumo:
Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.
Resumo:
There is a lack of research which identifies the role of the public-sector client in relation to ethical practice in plan procurement. This paper discusses a conceptual framework for ethical decision making in project procurement, focusing on public sector clients within the Malaysian construction industry. A framework is proposed to ensure that effective ethical decision making strategies are deployed to ensure that plan procurement is carried out with a transparent process so that the public sector clients are able to adopt. The conceptual framework adopts various factors that contribute to ethical decision making at the early stage of procurement and consists of the procurement system, individual factors, project characteristics, and organizational culture as the internal factors and professional code of conduct and government policies as the external factors. This framework rationalizes the relationships between systems, psychology and organizational theory to form an innovative understanding of making ethical decisions in plan procurement. It is expected that this proposed framework will be useful as a foundation for identifying the factors that contribute to ethical decision making focusing on the planning stage of procurement process.
Resumo:
This book is based on a study of a complex project proposal by governments and corporations for a futuristic city, the Multifunction Polis (MFP). It encompasses issues and challenges symptomatic of growth initiatives in the global competitive environment. Academic rigor is applied using corporate strategy and business principles to undertake a detailed analysis of the project proposal & feasibility study and to subsequently construct practical guidelines on how to effectively manage the interpretation & implementation of a large-scale collaborative venture. It specifically addresses a venture which involves fragmented groups representing a diversity of interests but which aspire to related goals and, to this end, there is a need for cooperation & synergy across the planning process.This is an easy to read book of general interest and well suited to practitioners and academics alike. Its relevance is far-reaching, extending to venture situations defined by location, industry, community or social interest, the context, scale and scope of the project, and the role of organization management, project management, market and industry development and public policy. flap text of book
Resumo:
Background: An estimated 285 million people worldwide have diabetes and its prevalence is predicted to increase to 439 million by 2030. For the year 2010, it is estimated that 3.96 million excess deaths in the age group 20-79 years are attributable to diabetes around the world. Self-management is recognised as an integral part of diabetes care. This paper describes the protocol of a randomised controlled trial of an automated interactive telephone system aiming to improve the uptake and maintenance of essential diabetes self-management behaviours. ---------- Methods/Design: A total of 340 individuals with type 2 diabetes will be randomised, either to the routine care arm, or to the intervention arm in which participants receive the Telephone-Linked Care (TLC) Diabetes program in addition to their routine care. The intervention requires the participants to telephone the TLC Diabetes phone system weekly for 6 months. They receive the study handbook and a glucose meter linked to a data uploading device. The TLC system consists of a computer with software designed to provide monitoring, tailored feedback and education on key aspects of diabetes self-management, based on answers voiced or entered during the current or previous conversations. Data collection is conducted at baseline (Time 1), 6-month follow-up (Time 2), and 12-month follow-up (Time 3). The primary outcomes are glycaemic control (HbA1c) and quality of life (Short Form-36 Health Survey version 2). Secondary outcomes include anthropometric measures, blood pressure, blood lipid profile, psychosocial measures as well as measures of diet, physical activity, blood glucose monitoring, foot care and medication taking. Information on utilisation of healthcare services including hospital admissions, medication use and costs is collected. An economic evaluation is also planned.---------- Discussion: Outcomes will provide evidence concerning the efficacy of a telephone-linked care intervention for self-management of diabetes. Furthermore, the study will provide insight into the potential for more widespread uptake of automated telehealth interventions, globally.