397 resultados para Rudy, Gerard


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Improving efficiency and flexibility in pulsed power supply technologies are the most substantial concerns of pulsed power systems specifically for plasma generation. Recently, the improvement of pulsed power supply becomes of greater concern due to extension of pulsed power applications to environmental and industrial areas. A current source based topology is proposed in this paper which gives the possibility of power flow control. The main contribution in this configuration is utilization of low-medium voltage semiconductor switches for high voltage generation. A number of switch-diode-capacitor units are designated at the output of topology to exchange the current source energy into voltage form and generate a pulsed power with sufficient voltage magnitude and stress. Simulations have been carried out in Matlab/SIMULINK platform to verify the capability of this topology in performing desired duties. Being efficient and flexible are the main advantages of this topology.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The configuration proposed in this paper aims to generate high voltage for pulsed power applications. The main idea is to charge two groups of capacitors in parallel through an inductor and take the advantage of resonant phenomena in charging each capacitor up to a double input voltage level. In each resonant half a cycle, one of those capacitor groups are charged, and finally the charged capacitors will be connected together in series and the summation of the capacitor voltages can be appeared at the output of the topology. This topology can be considered as a modified Marx generator which works based on the resonant concept. Simulation models of this converter have been investigated in Matlab/SIMULINK platform and the attained results fully satisfy the proper operation of the converter.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a high voltage pulsed power system based on low voltage switch-capacitor units connected to a current source for several applications such as plasma systems. A modified positive buck-boost converter topology is used to utilize the current source concept and a series of low voltage switch-capacitor units is connected to the current source in order to provide high voltage with high voltage stress (dv/dt) as demanded by loads. This pulsed power converter is flexible in terms of energy control, in that the stored energy in the current source can be adjusted by changing the current magnitude to significantly improve the efficiency of various systems with different requirements. Output voltage magnitude and stress (dv/dt) can be controlled by a proper selection of components and control algorithm to turn on and off switching devices.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Improving efficiency and flexibility in pulsed power supply technologies is the most substantial concern of pulsed power systems specifically with regard to plasma generation. Recently, the improvement of pulsed power supply has become of greater concern due to the extension of pulsed power applications to environmental and industrial areas. With this respect, a current source based topology is proposed in this paper as a pulsed power supply which gives the possibility of power flow control during load supplying mode. The main contribution in this configuration is utilization of low-medium voltage semiconductor switches for high voltage generation. A number of switch-diode-capacitor units are designated at the output of topology to exchange the current source energy into voltage form and generate a pulsed power with sufficient voltage magnitude and stress. Simulations carried out in Matlab/SIMULINK platform as well as experimental tests on a prototype setup have verified the capability of this topology in performing desired duties. Being efficient and flexible are the main advantages of this topology.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Introduction: Floods are the most common hazard to cause disasters and have led to extensive morbidity and mortality throughout the world. The impact of floods on the human community is related directly to the location and topography of the area, as well as human demographics and characteristics of the built environment. Objectives: The aim of this study is to identify the health impacts of disasters and the underlying causes of health impacts associated with floods. A conceptual framework is developed that may assist with the development of a rational and comprehensive approach to prevention, mitigation, and management. Methods: This study involved an extensive literature review that located >500 references, which were analyzed to identify common themes, findings, and expert views. The findings then were distilled into common themes. Results: The health impacts of floods are wide ranging, and depend on a number of factors. However, the health impacts of a particular flood are specific to the particular context. The immediate health impacts of floods include drowning, injuries, hypothermia, and animal bites. Health risks also are associated with the evacuation of patients, loss of health workers, and loss of health infrastructure including essential drugs and supplies. In the mediumterm, infected wounds, complications of injury, poisoning, poor mental health, communicable diseases, and starvation are indirect effects of flooding. In the long-term, chronic disease, disability, poor mental health, and poverty-related diseases including malnutrition are the potential legacy. Conclusions: This article proposes a structured approach to the classification of the health impacts of floods and a conceptual framework that demonstrates the relationships between floods and the direct and indirect health consequences.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Executive summary Objective: The aims of this study were to identify the impact of Pandemic (H1N1) 2009 Influenza on Australian Emergency Departments (EDs) and their staff, and to inform planning, preparedness, and response management arrangements for future pandemics, as well as managing infectious patients presenting to EDs in everyday practice. Methods This study involved three elements: 1. The first element of the study was an examination of published material including published statistics. Standard literature research methods were used to identify relevant published articles. In addition, data about ED demand was obtained from Australian Government Department of Health and Ageing (DoHA) publications, with several state health departments providing more detailed data. 2. The second element of the study was a survey of Directors of Emergency Medicine identified with the assistance of the Australasian College for Emergency Medicine (ACEM). This survey retrieved data about demand for ED services and elicited qualitative comments on the impact of the pandemic on ED management. 3. The third element of the study was a survey of ED staff. A questionnaire was emailed to members of three professional colleges—the ACEM; the Australian College of Emergency Nursing (ACEN); and the College of Emergency Nursing Australasia (CENA). The overall response rate for the survey was 18.4%, with 618 usable responses from 3355 distributed questionnaires. Topics covered by the survey included ED conditions during the (H1N1) 2009 influenza pandemic; information received about Pandemic (H1N1) 2009 Influenza; pandemic plans; the impact of the pandemic on ED staff with respect to stress; illness prevention measures; support received from others in work role; staff and others’ illness during the pandemic; other factors causing ED staff to miss work during the pandemic; and vaccination against Pandemic (H1N1) 2009 Influenza. Both qualitative and quantitative data were collected and analysed. Results: The results obtained from Directors of Emergency Medicine quantifying the impact of the pandemic were too limited for interpretation. Data sourced from health departments and published sources demonstrated an increase in influenza-like illness (ILI) presentations of between one and a half and three times the normal level of presentations of ILIs. Directors of Emergency Medicine reported a reasonable level of preparation for the pandemic, with most reporting the use of pandemic plans that translated into relatively effective operational infection control responses. Directors reported a highly significant impact on EDs and their staff from the pandemic. Growth in demand and related ED congestion were highly significant factors causing distress within the departments. Most (64%) respondents established a ‘flu clinic’ either as part of Pandemic (H1N1) 2009 Influenza Outbreak in Australia: Impact on Emergency Departments. the ED operations or external to it. They did not note a significantly higher rate of sick leave than usual. Responses relating to the impact on staff were proportional to the size of the colleges. Most respondents felt strongly that Pandemic (H1N1) 2009 Influenza had a significant impact on demand in their ED, with most patients having low levels of clinical urgency. Most respondents felt that the pandemic had a negative impact on the care of other patients, and 94% revealed some increase in stress due to lack of space for patients, increased demand, and filling staff deficits. Levels of concern about themselves or their family members contracting the illness were less significant than expected. Nurses displayed significantly higher levels of stress overall, particularly in relation to skill-mix requirements, lack of supplies and equipment, and patient and patients’ family aggression. More than one-third of respondents became ill with an ILI. Whilst respondents themselves reported taking low levels of sick leave, respondents cited difficulties with replacing absent staff. Ranked from highest to lowest, respondents gained useful support from ED colleagues, ED administration, their hospital occupational health department, hospital administration, professional colleges, state health department, and their unions. Respondents were generally positive about the information they received overall; however, the volume of information was considered excessive and sometimes inconsistent. The media was criticised as scaremongering and sensationalist and as being the cause of many unnecessary presentations to EDs. Of concern to the investigators was that a large proportion (43%) of respondents did not know whether a pandemic plan existed for their department or hospital. A small number of staff reported being redeployed from their usual workplace for personal risk factors or operational reasons. As at the time of survey (29 October –18 December 2009), 26% of ED staff reported being vaccinated against Pandemic (H1N1) 2009 Influenza. Of those not vaccinated, half indicated they would ‘definitely’ or ‘probably’ not get vaccinated, with the main reasons being the vaccine was ‘rushed into production’, ‘not properly tested’, ‘came out too late’, or not needed due to prior infection or exposure, or due to the mildness of the disease. Conclusion: Pandemic (H1N1) 2009 Influenza had a significant impact on Australian Emergency Departments. The pandemic exposed problems in existing plans, particularly a lack of guidelines, general information overload, and confusion due to the lack of a single authoritative information source. Of concern was the high proportion of respondents who did not know if their hospital or department had a pandemic plan. Nationally, the pandemic communication strategy needs a detailed review, with more engagement with media networks to encourage responsible and consistent reporting. Also of concern was the low level of immunisation, and the low level of intention to accept vaccination. This is a problem seen in many previous studies relating to seasonal influenza and health care workers. The design of EDs needs to be addressed to better manage infectious patients. Significant workforce issues were confronted in this pandemic, including maintaining appropriate staffing levels; staff exposure to illness; access to, and appropriate use of, personal protective equipment (PPE); and the difficulties associated with working in PPE for prolonged periods. An administrative issue of note was the reporting requirement, which created considerable additional stress for staff within EDs. Peer and local support strategies helped ensure staff felt their needs were provided for, creating resilience, dependability, and stability in the ED workforce. Policies regarding the establishment of flu clinics need to be reviewed. The ability to create surge capacity within EDs by considering staffing, equipment, physical space, and stores is of primary importance for future pandemics.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper discusses a new paradigm of real-time simulation of power systems in which equipment can be interfaced with a real-time digital simulator. In this scheme, one part of a power system can be simulated by using a real-time simulator; while the other part is implemeneted as a physical system. The only interface of the physical system with the computer-based simulator is through data-acquisition system. The physical system is driven by a voltage-source converter (VSC)that mimics the power system simulated in the real-time simulator. In this papar, the VSC operates in a voltage-control mode to track the point of common coupling voltage signal supplied by the digital simulator. This type of splitting a network in two parts and running a real-time simulation with a physical system in parallel is called a power network in loop here. this opens up the possibility of study of interconnection o f one or several distributed generators to a complex power network. The proposed implementation is verified through simulation studies using PSCAD/EMTDC and through hardware implementation on a TMS320G2812 DSP.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In rural low-voltage networks, distribution lines are usually highly resistive. When many distributed generators are connected to such lines, power sharing among them is difficult when using conventional droop control, as the real and reactive power have strong coupling with each other. A high droop gain can alleviate this problem but may lead the system to instability. To overcome4 this, two droop control methods are proposed for accurate load sharing with frequency droop controller. The first method considers no communication among the distributed generators and regulates the output voltage and frequency, ensuring acceptable load sharing. The droop equations are modified with a transformation matrix based on the line R/X ration for this purpose. The second proposed method, with minimal low bandwidth communication, modifies the reference frequency of the distributed generators based on the active and reactive power flow in the lines connected to the points of common coupling. The performance of these two proposed controllers is compared with that of a controller, which includes an expensive high bandwidth communication system through time-domain simulation of a test system. The magnitude of errors in power sharing between these three droop control schemes are evaluated and tabulated.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As the use of renewable energy sources (RESs) increases worldwide, there is a rising interest on their impacts on power system operation and control. An overview of the key issues and new challenges on frequency regulation concerning the integration of renewable energy units into the power systems is presented. Following a brief survey on the existing challenges and recent developments, the impact of power fluctuation produced by variable renewable sources (such as wind and solar units) on sysstem frequency performance is also presented. An updated LFC model is introduced, and power system frequency response in the presence of RESs and associated issues is analysed. The need for the revising of frequency performance standards is emphasised. Finally, non-linear time-domain simulations on the standard 39-bus and 24-bus test systems show that the simulated results agree with those predicted analytically.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This article deals with the non-linear oscillations assessment of a distribution static comensator ooperating in voltage control mode using the bifurcation theory. A mathematical model of the distribution static compensator in the voltage control mode to carry out the bifurcation analysis is derived. The stabiity regions in the Thevein equivalent plane are computed. In addition, the stability regions in the control gains space, as well as the contour lines for different Floquet multipliers are computed. The AC and DC capacitor impacts on the stability are analyzed through the bifurcation theory. The observations are verified through simulaation studies. The computation of the stability region allows the assessment of the stable operating zones for a power system that includes a distribution static compensator operating in the voltage mode.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The dominant economic paradigm currently guiding industry policy making in Australia and much of the rest of the world is the neoclassical approach. Although neoclassical theories acknowledge that growth is driven by innovation, such innovation is exogenous to their standard models and hence often not explored. Instead the focus is on the allocation of scarce resources, where innovation is perceived as an external shock to the system. Indeed, analysis of innovation is largely undertaken by other disciplines, such as evolutionary economics and institutional economics. As more has become known about innovation processes, linear models, based on research and development or market demand, have been replaced by more complex interactive models which emphasise the existence of feedback loops between the actors and activities involved in the commercialisation of ideas (Manley 2003). Currently dominant among these approaches is the national or sectoral innovation system model (Breschi and Malerba 2000; Nelson 1993), which is based on the notion of increasingly open innovation systems (Chesbrough, Vanhaverbeke, and West 2008). This chapter reports on the ‘BRITE Survey’ funded by the Cooperative Research Centre for Construction Innovation which investigated the open sectoral innovation system operating in the Australian construction industry. The BRITE Survey was undertaken in 2004 and it is the largest construction innovation survey ever conducted in Australia. The results reported here give an indication of how construction innovation processes operate, as an example that should be of interest to international audiences interested in construction economics. The questionnaire was based on a broad range of indicators recommended in the OECD’s Community Innovation Survey guidelines (OECD/Eurostat 2005). Although the ABS has recently begun to undertake regular innovation surveys that include the construction industry (2006), they employ a very narrow definition of the industry and only collect very basic data compared to that provided by the BRITE Survey, which is presented in this chapter. The term ‘innovation’ is defined here as a new or significantly improved technology or organisational practice, based broadly on OECD definitions (OECD/Eurostat 2005). Innovation may be technological or organisational in nature and it may be new to the world, or just new to the industry or the business concerned. The definition thus includes the simple adoption of existing technological and organisational advancements. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment. It builds on a pilot innovation survey undertaken by PricewaterhouseCoopers (PWC) for the Australian Construction Industry Forum on behalf of the Australian Commonwealth Department of Industry Tourism and Resources, in 2001 (PWC 2002). The survey responds to an identified need within the Australian construction industry to have accurate and timely innovation data upon which to base effective management strategies and public policies (Focus Group 2004).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background: There is no global definition of a heatwave because local acclimatisation and adaptation influence the impact of extreme heat. Even at a local level there can be multiple heatwave definitions, based on varying temperature levels or time periods. We investigated the relationship between heatwaves and health outcomes using ten different heatwave definitions in Brisbane, Australia. ---------- Methodology/Principal Findings: We used daily data on climate, air pollution, and emergency hospital admissions in Brisbane between January 1996 and December 2005; and mortality between January 1996 and November 2004. Case-crossover analyses were used to assess the relationship between each of the ten heatwave definitions and health outcomes. During heatwaves there was a statistically significant increase in emergency hospital admissions for all ten definitions, with odds ratios ranging from 1.03 to 1.18. A statistically significant increase in the odds ratios of mortality was also found for eight definitions. The size of the heat-related impact varied between definitions.---------- Conclusions/Significance Even a small change in the heatwave definition had an appreciable effect on the estimated health impact. It is important to identify an appropriate definition of heatwave locally and to understand its health effects in order to develop appropriate public health intervention strategies to prevent and mitigate the impact of heatwaves.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, two different high bandwidth converter control strategies are discussed. One of the strategies is for voltage control and the other is for current control. The converter, in each of the cases, is equipped with an output passive filter. For the voltage controller, the converter is equipped with an LC filter, while an output has an LCL filter for current controller. The important aspect that has been discussed the paper is to avoid computation of unnecessary references using high-pass filters in the feedback loop. The stability of the overall system, including the high-pass filters, has been analyzed. The choice of filter parameters is crucial for achieving desirable system performance. In this paper, the bandwidth of achievable performance is presented through frequency (Bode) plot of the system gains. It has been illustrated that the proposed controllers are capable of tracking fundamental frequency components along with low-order harmonic components. Extensive simulation results are presented to validate the control concepts presented in the paper.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper compares the performance of two droop control schemes in a hybrid microgrid. With presence of both converter interfaced and inertial sources, the droop controller share power in a decentralized fashion. Both the droop controllers facilitate reactive power sharing based on voltage droop. However in frequency droop control, the real power sharing depends on the frequency, while in angle droop control, it depends on output voltage angle. For converter interfaced sources this reference voltage is tracked while for inertial DG, reference power for the prime mover is calculated from the reference angle with the proposed angle control scheme. This coordinated control scheme shows significant improvement in system performance. The comparison with the conventional frequency droop shows that the angle control scheme shares power with much lower frequency deviation. This is a significant improvement particularly in a frequent load changing scenario.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper proposes a novel peak load management scheme for rural areas. The scheme transfers certain customers onto local nonembedded generators during peak load periods to alleviate network under voltage problems. This paper develops and presents this system by way of a case study in Central Queensland, Australia. A methodology is presented for determining the best location for the nonembedded generators as well as the number of generators required to alleviate network problems. A control algorithm to transfer and reconnect customers is developed to ensure that the network voltage profile remains within specification under all plausible load conditions. Finally, simulations are presented to show the performance of the system over a typical maximum daily load profile with large stochastic load variations.